Search Documents

  • AUSIMM
    Coking with a Seven Cubic Foot Capacity Coke Oven

    A new test coke oven of 7 cu. ft. capacity is described. The oven was designed to simulate conditions in a central section of a battery oven and a special feature is the achievement of unidirectional

    Jan 1, 1970

  • ISEE
    Controlled Blast Induced Liquefaction of Water Saturated Sands Using 250 m Long Horizontal Holes and Electronic Detonators

    By M. Ganster, H. Krenn

    The mission of the project is the fast and cost-effective rehabilitation of decommissioned lignite mining and coal upgrading facilities. This is necessary to ensure the successful future utilization o

    Jan 1, 2013

  • AUSIMM
    Shaft Plumbing at Mount Isa

    In the plumbing of vertical shafts the methods employed and equipment used, are generally made to best suit existing conditions. Undoubtedly, there is no method that can be called standard or that can

    Jan 1, 1940

  • DFI
    Application of Deep Soil Mixing Walls in the Warren Avenue Grade Separation Project, Fremont, CA

    By D. S. Yang, Y. D. Wang, G. Watanabe, A. P. Notaro

    "Deep soil mixing (DSM) walls reinforced with steel soldier piles were installed for excavation support and groundwater control for the construction of a grade separation structure at the intersection

    Jan 1, 2015

  • TMS
    Effect Of P2O5 Or Na2O Addition On The Reaction Rate Of C02 Dissociation With FexO Containing Molten Oxides

    By Hiroyuki Matsuura

    The effects of P2OS or Na2O addition on the reaction rate of CO2 dissociation on the surface of FexO-base molten oxides was investigated at I 773K by isotope exchange method 1-6. The rate constant dec

    Jan 1, 2003

  • DFI
    Risk Mitigation Strategies For Cut And Cover Tunnels At The Mitchell Interchange

    By Mark Maday

    As part of the I-94 North-South Corridor reconstruction program, the Wisconsin Department of Transportation (department) is reconstructing the Mitchell Interchange in Milwaukee, Wisconsin. Located o

    Jan 1, 2011

  • NIOSH
    RI 7295 Bureau Of Mines Coal-Fired Gas Turbine Research Project - Test Of Combustor And Ash Separators For Open-Cycle Plant

    By Donald C. Strimbeck

    The Bureau of Mines designed a down-fired refractory-lined combustor that efficiently burned pulverized coal to produce a gas suitable as working fluid for an open-cycle gas turbine. The gas contained

    Jan 1, 1969

  • SAIMM
    Our Mineral Heritage - Presidential Address

    By P. W. J. van Rensburg

    Our mineral heritage - PRESIDENTIAL ADDRESS given by P. W. J. van Rensburg, Pr. Eng.. B.Sc. (Eng.)(Rand) INTRODUCTION Stone Age people were living in various parts of South Africa as recent,ly as a th

    Jan 10, 1973

  • NIOSH
    Crushing And Grinding - Introduction

    By John Gross

    From the time when man first pounded one rock upon another or used heat and sudden chilling with water to disintegrate rock, the art of crushing advanced but slowly to the mule-driven arrastre and the

    Jan 1, 1938

  • CIM
    Improvements to Production Planning in Oil Sands Mining Through Analysis and Simulation of Truck Cycle Times

    By E. Goris Cervantes

    "A theoretical framework based on a detailed analysis of mine operations data from an oil sands mine in northern Alberta and the static simulation of truck cycle times are developed, verified, and val

    Jan 1, 2019

  • DFI
    Revitalizing Hillside Using Stabilization Piers Monitored By 3-D Mems-Based Inclinometers

    By Peter Chou

    A total of 117 slope stabilization drilled piers were installed as part of a major hillside revitalization project. The 110-million dollar development, known as Stratford at Kenwood, included an 18-st

    Jan 1, 2009

  • AUSIMM
    Flotation of Ok Tedi Sulphide Minerals

    By Mwaba CC

    Ok Tedi Mining Ltd has been using flotation for the production of copper/gold concentrates from a complex copper sulphide ore for several years. During this period, much effort has been devoted to

    Jan 1, 1991

  • SME
    Technical Challenges In Mine Rehabilitation

    By Don Dodds

    Iron Mountain Mine Rehabilitation Project Brief History The Iron Mountain Mine is located in Northern California approximately 12 miles northwest of Redding. The ore body is a large, very dense pyri

  • IMMS
    Hydrothermal Mineralization At Slow-Spreading Centers: The Atlantic Model

    By Peter A. Rona

    The recent discovery of the first black smoker-type hydrothermal venting and massive sulfide mineral deposits at a site in the rift valley of the slow-spreading Mid-Atlantic Ridge near latitude 26°N,

    Jan 1, 1986

  • AUSIMM
    MinerÆs Rights: Legal and Illegal Mining by Automatic Citizens under the present Mining Act

    Every automatic citizen is an automatic recipient of a miner's right under the present Mining Act (Chapter 195), but this alone does not entitle any automatic citizen to mine for minerals on

    Jan 1, 1991

  • SME
    The Immobilization Of Free Ionic Gold And Asparagine-Complexed Ionic Gold By Sporosarcina Ureae: The Importance Of Organo-Gold Complexes In Gold Mobility

    By W. S. Fyfe, G. Southam, T. J. Beveridge

    Bacterial populations play an active role in mineral weathering in subsurface and near-surface environments e.g., supergene enrichment of Cu at Morenci, AZ. An invitro bacterial biofilm model was use

    Jan 1, 1999

  • SME
    Grunerite (Amosite) Asbestos And Tremolite?Ferroactinolite Asbestos: Risk Of Environmental Mesothelioma: Rapporteur?s Report

    By John F. Gamble

    Paper 1?South African experience with asbestos-related environmental mesothelioma: Is fiber type important? Neil White, Gill Nelson, Jill Murray The purpose of this review was to illustrate the im

    Jan 1, 2007

  • AUSIMM
    Application of Research Principles to Identify Process Improvement at Sunrise Dam Gold Mine

    By N Clarke, G R. Ballantyne, M S. Powell, P Elms, A Anyimadu

    AngloGold Ashanti Ltd nominated Sunrise Dam Gold Mine as a case study via their involvement with the long-running Australian Mineral Industry Research Association (AMIRA) International P9P research pr

    Sep 7, 2015

  • DFI
    Collaborative Alliances – A Sustainable Way Forward For Construction?

    By Stefano Trevisani

    Abstract The FIEC Sustainability Vision states that “risks should be identified and allocated in a fair manner across the project team from the early stages of the design phase. A partnering approach,

    Jan 1, 2014

  • NIOSH
    IC 9006 Safety Aspects Of Pneumatic Transport

    By E. T. Bowers

    Pneumatic conveying of coal underground is not widely used in the United States, although it is becoming increasingly popular in Great Britain, the Federal Republic of Germany, and South Africa. The q

    Jan 1, 1985