  • NIOSH
    IC 8990 Chromite Deposits Along The Border Ranges Fault, Southern Alaska (In Two Parts) 1. Field Investigations And Descriptions Of Chromite Deposits

    By Jeffrey Y. Foley

    Chromite deposits along the Border Ranges Fault in southern Alaska were investigated by the Bureau of Mines. This report, part 1 of a two- part series, describes the deposits. Part 2 describes the min

    Jan 1, 1985

  • SME-ICGCM
    Correlation Between Unconfined Compressive And Point Load Strengths For Appalachian Rocks

    By Luis E. Vallejo

    The strength measured by the uniaxial compression test is a parameter that is widely used for the engineering classification of rocks. Sedimentary rocks such as shales, however, are difficult to evalu

    Jan 1, 1989

  • NIOSH
    RI 3182 Review Of Fatalities In The California Petroleum Industry During The Calendar Year 1931

    By R. J. Marek

    The number of persons fatally injured in the California petroleum industry in 1931 was 30, a decrease of 20 fatalities or 40 per cent from the number killed in 1930. As a result of the decrease in the

    Jan 1, 1932

  • AIME
    Thompson Procedure - A Contrast For Mill Size Selection

    By Richard A. Kesler, W. Michael Reed

    Grindability or resistance to fine comminution is the fundamental issue involved in the application and sizing of grinding mills. Over the years, many theories for determining the amount of energy req

    Jan 1, 1982

  • NIOSH
    OFR-117-84 Assessment Of Dispersing Tracer Gas With Ventilation Air Stream To Detect Mine Fires

    By M. D. Marshall

    A remote heat-activated stench gas/tracer gas mine alarm system was developed to reduce the time between fire detection and personnel notification. The stench gas/ tracer gas system contains ethyl mer

    Jan 1, 1983

  • SME
    The Ivar Project - An Uncommon, Everyday TBM Tunnel

    By Yngve Jordal, Sverker Hartwig

    The IVAR Project is Norway's largest sewer project presently under construction. One part of it is an 8.1 km (26 575 ft) long, 3.5 m (11 ft 6 in.) diam tunnel, bored in one year. The tunneling pr

    Jan 1, 1991

  • NIOSH
    OFR-8(2)-76 Analysis Of Men, Materials And Supplies Handling Systems In Underground Metal And Non-Metal Mines - Volume II ? Phase I Report - Present Systems Study ? Introduction

    This project, "Analysis of Men, Materials and Supplies Handling Systems in Underground Metal and Nonmetal Mines" documents the productivity and safety aspects of the existing equipment and systems uti

    Jan 1, 1975

  • SME
    A Generalized Multiperiod MIP Model For Production Scheduling And Processing Facilities Selection And Location ? Introduction

    By Ralph W. Barbaro

    In the mineral industry, the objective of a mining venture is to extract, process, and market a mineral commodity in such a manner that the profit of the venture is maximized. In a mining venture, a c

    Jan 1, 1983

  • AUSIMM
    Climate Related Adaptation from Terrain Evaluation Results (CRATER) - Interpretation of Pre-existing Data for Mine Site Flood Vulnerability and Management

    By M Grigorescu, J H. Hodgkinson, H Alehossein

    A new framework that collates and interprets pre-existing data to assess vulnerability and ultimately plan to avoid or minimise flood-related risk to infrastructure, people, downtime, environment and

    Nov 26, 2013

  • SME-ICGCM
    Comparative Study Of Western US Longwall Panel Entry Systems

    By Khamis Y. Haramy

    This paper summarizes ground control studies of longwall panel entry systems in two Western U.S. coal mines. Presented are comparisons of in situ pressure change measurements and assessments of chain

    Jan 1, 1989

  • SME
    Reliability of Conventional Ground Support

    By Davorin Kolic, Harald Wagner

    Conventional ground support in accordance with latest state-of-the-art considers proper preparation of geotechnical investigation, structural design, observation during construction and fair risk shar

    Jan 1, 2001

  • CIM
    Column Flotation Applied to the Production of Phosphate Rock in Araxa-MG, Brazil

    By Antônio Peres, Rogério Guimaraes, Lauro Takata, Harold Wyslouzil

    "Serrana’s concentrator, in Araxii, has capacity of producing approximately 800,000 tomes of phosphate rock per year, with a P205 grade of 36%, from ores grading between 13% and 14% P205. The annual m

    Jan 1, 1999

  • CIM
    King Mine No. 3 Shaft and Equipment

    By J. G. Ross

    IN the paper entitled Block Caving at the King Mine (1), which was presented at the Annual General Meeting held in April, 1934, at Quebec, it was pointed out that, owing to certain conditions and fina

    Jan 1, 1939

  • CIM
    On-Line Material Balance Calculation for Mass Flow Rate Estimation and Flotation Process Diagnosis an Application to Copper-Flotation Circuit at East-Malartic Plant

    By Dany Pelletier, Yeves Breau, Ahmed Bouajila, Claude Gagnon

    "In flotation circuits, direct measurement of the volumetric flow rate delivered by electromagnetic flowmeters is often difficult to obtain particularly due to piping and flow constraints. However, on

    Jan 1, 2000

  • SME
    Kinetics of Nickel Extraction from Indonesian Saprolitic Ore by Citric Acid Leaching Under Atmospheric Pressure

    By K. Sasaki, W. Astuti, N. Okibe, T. Hirajima

    "The kinetics of leaching of a saprolitic ore from Indonesia by citric acid solution under atmospheric pressure was investigated. An examination of the effects of leaching temperature, citric acid con

    Jan 1, 2015

  • SME
    The Expansion Of Tarkwa CIL Plant From 4.2mtpa To 12mtpa

    By E. Barnard

    Tarkwa Gold Mine is located in south western Ghana, and is majority owned and operated by Gold Fields Ghana Limited. The Tarkwa CIL plant utilises a single low aspect 27' x 42' 14MW dual pin

    Jan 1, 2008

  • SME
    The Tailings Dam Monitoring And Pre-Alarm System (TDMPAS) And Its Applications In Mines

    By E. Sun

    Tailings disposal is a significant consideration for the mining industry, with the majority of the ore processed in most mining operations ending up as tailings. Several tailings dam failure accidents

    Jan 1, 2012

  • NIOSH
    Technical Bulletin - Pager Phones: Installation

    INTRODUCTION The pager phones used in many underground coal mines are battery- operated, party-line telephones with provisions for loudspeaker paging. The system is two-wire, non-polarized, and is ope

    Apr 1, 1975

  • TMS
    Laboratory Test Work and Plant Trials for Milling and Flotation of Slow Cooled Copper Slag

    By Alberto Oalvez, Lucya Yunus, Pengfii Tan

    "Laboratory flotation tests of slow cooled converter slag have showed that 92.5% copper recovery at the copper cut-off grade of 24 - 25 % can be achieved by using a 50:50 ratio of DSP330 and SIBX (sod

    Jan 1, 2012

  • AUSIMM
    Drill Steel Sharpening Practice at Lake View and Star Gold Mine

    The drill steel' sharpening shop, which stands adjacent to the Chaffers shaft, is built to the dimensions of 110 ft. 9 in. by 58 ft. wide, and is air conditioned in order to maintain reasonable w

    Jan 1, 1941