Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Times Square Connection: ?Supporting The Cross Roads Of The World?By Victor F. Paterno
In December of 2007, a joint venture of J.F Shea, Skanska and Schiavone referred to as S-3II, was awarded a $1.15 billion (? 886,880,000) contract to construct the run-ning tunnels and station structu
-
Recycling Power Plant Fly Ash And Its New Application For Construction Materials - Preprint 09-037By N. S. Kim
Economically favored Cr and Cu leaching out process from spent power plant fly ash (PPFA) had been investigated. PPFA, bearing of C, S, V, Ni, Cu and Cr, has been widely used as an assistant fuel in c
Jan 1, 2009
-
Influence Of The Reduction Conditions On The Expansion And Microtexture Of Sintered Hematite Compacts During The Transition To MagnetiteBy W. M. Husslage
The permeability in the blast furnace shaft is adversely affected by low temperature reduction degradation of sinters. The fundamental cause is an expansion of the iron oxide phase resulting from redu
Jan 1, 1998
-
Design Risk Mitigations for Contract CQ028 of the East Side Access ProjectBy Samer Sadek, David I. Smith, Wai-shing Lee, Jeffrey L. Rice, Avelino Alonso
INTRODUCTION East Side Access (ESA) Contract CQ028 is located in the New York City Borough of Queens. The contract involves construction of a 230-meter (760-foot) long open-cut excavation with a p
Jan 1, 2007
-
Gold Mineralization In The Coffee Creek Area; White Gold District (Dawson Range), West-Central Yukon ? IntroductionBy A. J. Wainwright
The Coffee Creek lode gold discoveries are located in the White Gold district (Dawson Range), west-central Yukon, 130 km south of Dawson City and 30 km south of the Golden Saddle gold deposit (Figure
Jan 1, 2012
-
Emerald Mining in AfghanistanBy Antoni Kalukiewicz
From 1997 through 2000, a team of Polish experts headed by the author studied the prospects of mining newly discovered emerald deposits in Afghanistan. This article describes the scheme for mechaniza
Jan 1, 2005
-
Passive-Treatment of Acid Rock Drainage: What is the Potential Bottom Line?By James J. Gusek
Passive-treatment systems that mitigate acid-rock drainage (ARD) from coal mines have operating since the mid-1980s. Large systems at metal mines are being contemplated. A 95L/sec (1500-gpm) capacity
Jan 1, 1995
-
Decline Development At The Lakeshore PropertyBy Robert S. Hendricks
LOCATION AND HISTORY The Lakeshore Copper property is located on the Papago Indian Reservation approximately 30 miles South of Casa Grande, Arizona. This major porphyry type deposit was discovered
Jan 1, 1997
-
Measuring The Insitu Rock Thermal Conductivity And Diffusivity ? IntroductionBy P. Mousset-Jones
The USBH Mining Systems and Ground Control Generic Research Center funded a project leading to the improved planning of airflow and refrigeration in underground mines experiencing hot working conditio
Jan 1, 1985
-
A Process Mineralogy Approach to the Flotation of Complex Lead–Zinc Ores from Görgü (Malatya) RegionBy Yakup Cebeci, Leyla Kalender, Ceylan Yarluğkal Altınışık, Hikmet Sis
The abstract highlights the challenges in concentrating complex and non-sulfide lead-zinc ores and emphasizes the importance of froth flotation for their beneficiation. The study focuses on using proc
Mar 22, 2022
-
Vari-Stem Blasthole Plugs Improve Blasting PatternsIn September 2003, a test was conducted to see if a115-mm- (4.5-in.-) diam Mocap Vari-Stem blasthole plug could improve the pattern of explosives using different top stemming material. The test too
Jan 1, 2004
-
Binding Iron Ore Pellets With Fly-Ash – Preprint 97-105By D. D. Banerjee, S. K. Kawatra, T. C. Eisele
A high calcium fluid-bed combustor ash has been shown to be an effective binder at dosages of 1 to 2% of the magnetite concentrate weight. Magnetite pellets 1.3 cm (1/2 inch) in diameter were produced
Feb 24, 1997
-
Optimization of Blast Design Parameter for Ring Blasting in Underground Hard Rock Mine Using Numerical Simulation - Mining, Metallurgy & Exploration (2024)By VIVEK KUMAR HIMANSHU, Murari Prasad Roy, Kaushik Dey, Rakesh Kumar Singh, Ashish Kumar Vishwakarma
Sublevel stoping is the most popular and practiced mining method in underground hard rock mines. Proper planning and its execution is the key requirement for stope extraction using this method. The st
Dec 22, 2023
-
Nature Friendly Sustainability: MiningBy M. Javier
This concept paper is presented in the hope of raising the awareness of mankind on the necessity for its peaceful coexistence with nature. It is a food for thought. It takes compromise and sacrifice o
Feb 27, 2013
-
Enhancement of a Process Flowsheet for Recovering and Concentrating Critical Materials from Bituminous Coal Sources Mining, Metallurgy and Exploration (2cb05380-838b-438b-903d-9a26c1191012)By A. Noble, R. Q. Honaker, J. Werner
Recovery of rare earth elements (REE) from coal-related resources has recently received significant interest due to supply concerns and their key roles in critical industries and defense-related techn
-
Enhancement of a Process Flowsheet for Recovering and Concentrating Critical Materials from Bituminous Coal Sources Mining, Metallurgy and ExplorationBy A. Noble, R. Q. Honaker, J. Werner
Recovery of rare earth elements (REE) from coal-related resources has recently received significant interest due to supply concerns and their key roles in critical industries and defense-related techn
-
Predicting Oxygen Run-Out Times Of Self-Contained Self-Rescuers – Preprint 97-119By N. I. Aziz, I. Tague, P. Mackenzie-Wood
The recent mine disasters in Australian coal mines have initiated an introduction of Self-Contained Self-Rescuer (SCSR) as component in the development of new escape strategies for miners. These self-
Feb 24, 1997
-
Evaluation Of Ct-Based Coal Washability Analysis System Under Simulated On-Line ConditionsBy J. D. Miller, C. L. Lin
Appropriate software and hardware necessary to adapt a x-ray CT analyzer for determination of coal washability has recently been developed and sucessfully tested for well characterized samples under l
Jan 1, 2001
-
Construction of Nine Shafts for the Manhattan Section of the New York City Water Tunnel No. 3By Yifan Ding, Shemek Oginski, Patrick Finn
The Manhattan section of the New York Water Tunnel No. 3 constructed by the Schiavone/Shea/Frontier-Kemper Joint Venture is a $668 million project. The contract includes a tunnel drive of 8.85 km (29,
Jan 1, 2007
-
Design and Risk Management Strategy for the Sound Transit Beacon Hill Station and TunnelsBy Joseph Gildner, Donald J. Phelps, Jürgen Laubbichler, Christopher Tattersall, David McAllister
The Beacon Hill Station and Tunnels portion of the Sound Transit Central Link Project consists of one mile of twin rapid transit tunnels, an underground station, portals and ancillary works constructe
Jan 1, 2005