Impacts of Geotechnical Issues on Design of the Beacon Hill Tunnel and Station ProjectBy Michael S. Kucker, Stuart Warren, Robert A. Robinson, Michael J. Lehnen, David McAllister
Geotechnical conditions exposed by the phased exploration programs have had a major impact on the selection of excavation and support methods, dewatering requirements, size of openings, vertical align
Jan 1, 2005
-
Modeling For Real-Time Performance Measurement: A Strategic ApproachBy Russell Barr, Robert E. Cook
As most mining companies are taking advantage of the high market prices for base metals such as steel, copper and zinc, numerous challenges still face them. While demand is strong from countries like
Jan 1, 2007
-
The Priceless IngredientsBy Grant P. Cordon
Our subject, "Safety, Legal, and Contracting," is a range of topics which covers a broad spectrum, but is obviously Intended to focus our attention upon certain particular aspects of tunnel problems.
Jan 1, 1974
-
Cyprus Coppertone Gold Benefits From Computerized Ore Control ProceduresBy Rodrigo Jerez
Advances in inexpensive computer automation led to the development and use of a computerized ore control system at the Cyprus Copperstone Gold Mine near Parker, AZ. These new ore control practices imp
Jan 1, 1991
-
Preventive Maintenance Policy Supported By A Quality Control Chart And Kolmogorov-Smirnov Tests: Emet Colemanite Mineral Processing Plant, TurkeyBy S. Yerel
In a mineral processing plant, the determination of a preventive maintenance schedule is one of the most important maintenance policies. In this study, to determine the preventive maintenance schedule
Jan 1, 2007
-
Probabilistic Approach To Project-Specific Political Risk Analysis For Mineral ProjectsBy S. Dessureault, Z. Gavelan
As globalization continues, sustainability and social responsibility has become essential in foreign mining investment. However this global trend and the increasing acceptability toward the globalizat
Jan 1, 2004
-
Investigation Of The Selectivity Of Ethoxylcarbonyl Thionocarbametes During The Flotation Of Copper SulfidesIn this study, the flotation performances of ethoxycarbonyl thionocarbamate (ECTC), dialkyl thionocarbamate (DATC) and xanthate copper sulfide collectors are compared by the structure-reactivity relat
Jan 1, 2008
-
Leaching Of Sarcheshmeh Copper Oxide Ore In Sulfuric Acid SolutionBy H. Razavizadeh
The recovery of copper from oxide ores containing from 2% to 4.1% acid-soluble copper from the Sarcheshmeh mine in Kerman province of Iran was investigated by agitation leaching in sulfuric acid media
Jan 1, 2008
-
Regulatory Perspective: The Progression of Canadian Mining Disclosure StandardsBy Deborah McCombe
-Canadian Regulators -Qualified Person -Professional Association -Resources & Reserves -Foreign Codes -Disclosure of Historical Resources -Issues in Application of Resources & Reserves -Industr
Jan 1, 2003
-
Introducing in January 2019... SME’s new member benefitBy None None
Life as a mining/mineral professional doesn’t leave much time for perusing 20-page technical papers. Yet, being technologically savvy is part and parcel of a successful career in this industry. What’s
-
Ventilation: Understanding The Factors Affecting Air Resistance And Their Implications On Mine Operating And Capital CostsBy H. C. Seeber
When considering all the aspects of a viable mine plan, it is important to estimate the accurate cost of mine ventilation, which varies as a function of airway dimensions, fan selection and ventilatio
Jan 1, 2002
-
Current Ground Support Membrane Applications In North American Underground MinesBy L. Lacerda
Spray-on ground support membranes (GSM) or thin support liners hold today perhaps as much potential to impact underground (u/g) ground support operations as dry and later wet-mix shotcrete when introd
Jan 1, 2002
-
Stress, Geologic, And Support Design System (SGSSM) For Underground Mine SlopesBy J. C. Stankus
Accurate evaluation of stress and geological conditions is critical to ground control design in underground openings. For a slope entry, the problem is more difficult because a slope will transverse
Jan 1, 2011
-
Evaluating Ground Conditions Ahead of a TBM Using Probe Drill DataBy Steven K. Duke, Jay Arabshahi
An economic, real-time probe drill monitoring system was developed for Metropolitan Water District’s Arrowhead Tunnels project to quantitatively evaluate ground conditions ahead of a TBM. This system
Jan 1, 2007
-
Record Performance Of TBM In The 13.5 Km Amlach Tunnel, AustriaBy Hans Janzon, Ernst Buechi
INTRODUCTION The headrace tunnel in Amlach is part of a hydro electric power scheme near the city of Lienz in south west Austria. The project is owned and developed by Tiroler Wasserkraftwerke AG,
Jan 1, 1987
-
Potash production hoisting plant upgrade and beyondBy D. M. Ziebarth
"During the mid to late 1960s, the underground potash industry in Saskatchewan was born. For the next four decades the industry operated at a steady pace, supporting a large part of the world demand,
Apr 1, 2017
-
Coupled Finite‑Difference and Discrete‑Element Method for Modelling Direct Shear Tests on Combined Rock‑Cemented Rockfill Specimens - Mining, Metallurgy & Exploration (2022)By CHONG WEI, TATYANA KATSAGA, DEREK APEL
This study provides an effective determination process of the interface microstructural parameters in the numerical modelling of the mechanical interaction between two different geomaterials involved
Nov 2, 2021
-
An Investigation Into The Hydrological Behaviour Of Exposed And Covered Waste Rock DumpsBy Bruno Bussière, Guosheng Zhan, Michel Aubertin, Vincent Martin, Robert P. Chapuis
The study evaluates the hydrological behaviour of exposed and covered waste rock dumps. The objectives were to determine the major factors influencing unsaturated flow in waste rock dumps and covers,
Jan 1, 2005
-
Northside Storage Tunnel Project, Sydney: Tunnelling and Groundwater Control Beneath the Middle HarbourBy R. A. Gee, G. B. Ashton, S. T. Warren, P. N. Groves
Northside Storage Tunnel provides 500 megalitres (Ml) (130 million gallons) of storage capacity to capture stormwater/sewage overflows into Sydney Harbour. The6.6 m diameter TBM driven tunnel traverse
Jan 1, 2001
-
Impact Of Using Synchronous Condensers for Power System Stability and Improvement of Short-Circuit Power in Mining ProjectsBy M. Nambiar
Due to the remote locations of mining projects and the need for long transmission lines to provide electrical power, mining sites often operate with poor network power quality and low short-circuit ca