Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Kinetics, of Microbiological Production of Ferric Ion for Heap and Dump Leaching
By Jai Ghosh, Aprad E. Torma, Roger Guay
The catalytic effect of ferrous ion in the industrial biohydrometallurgical heap and dump leaching processes is explained. During the bacterial leaching of metal sulfides, ferric ion will partly be hy
Jan 1, 1989
-
Recent Advances In Coal Spiral Development – Preprint 97-82
By W. S. Weldon, R. M. G. Machunter
The use of spiral separators for the beneficiation of fine coal typically in the size range - 2+0.lmm is now well established process technology. Developments during the mid 1980's resulted in th
Feb 24, 1997
-
The Utilization Of Coarse Pre-Concentration Rejects In The Preparation Of Underground Backfills At Xstrata Nickel?s Ontario Operations
By T. Weatherwax
As part of a strategic research initiative at UBC to design and evaluate integrated underground mining and mineral processing systems, work has been done to determine how to utilize the coarse rejects
Jan 1, 2008
-
Introduction (f248dc61-7d23-42d4-878e-d425d635fc78)
By Christopher J. Bise
PRINCIPLES OF MINE PLANNING During the initial planning stages, all mining operations are analyzed and evaluated in a similar fashion. This similarity holds true because the mine-planning procedure ca
Jan 1, 1986
-
NIOSH Gas Well Stability Research: Investigation into the Causes of an Anomalous Shale Gas Well Casing Deformation at a Deep Longwall Mine - SME Annual Meeting 2024
By Peter Zhang, Daniel Su
Following the first longwall excavation at a deep-cover gas well site, the pre-mining modeling prediction of longwallinduced casing deformations in the fully cemented production casing were in excelle
Feb 1, 2024
-
It?s Not Just Trucks And Shovels: Mineral Processing Equipment Will Be On Hand, Too
The past four years since the 2008 MINExpo have been a roller coaster ride for the mining industry, with highs and lows and everything in between. One of the natural consequences of this uncertainty h
Jan 1, 2012
-
Seismic Upgrades of the Claremont Tunnel
By Bill Cain, R. John Caulfield, D. Scott Kieffer
The East Bay Municipal Utility District is undertaking seismic upgrades of the Claremont Tunnel in the San Francisco Bay area. The tunnel carries treated water across the active Hayward Fault to suppl
Jan 1, 2001
-
Brightwater Conveyance System: Ground Freezing For Access Shaft Excavation Through Soft Ground
By Joseph M. McCann
The Brightwater regional wastewater treatment facility, under construction in King County, WA, includes an extensive conveyance system that will feature deep, soft-ground tunnels and shafts. Excavatio
-
Comparison of Respirable Coal Mine Dust Constituents Estimated using FTIR, TGA, and SEM–EDX
By Setareh Afrouz, Emily Sarver, Cigdem Keles
The resurgence of severe lung disease among US coal miners since the mid-1990s has led to efforts to better characterize and monitor respirable dust exposures, particularly focusing on mineral constit
Feb 24, 2022
-
Simulation Assisted Performance Improvements in Iron Ore Processing Plants (4c3a19f0-0877-40d2-a6da-cdc5ac5ec399)
By S. Ersayin
In 1998, the Concentrator Modeling Center was established within the Coleraine Minerals Research Lab to develop models for simulation of iron ore processing plants, and to assist plant operators in im
Jan 1, 2008
-
Impact of deformable materials and convergence on the transverse load capacity of mine ventilation stoppings
By T. J. Batchler
Deformable materials are sometimes added to ventilation stopping constructions to prevent damage caused by convergence in coal mines. However, adding deformable materials can significantly reduce the
Jan 1, 2009
-
Comparing Simulated And Interpreted Geologic Models
By M. Rossi
Geologic ore controls are usually interpreted and modeled from cross sections and plans, as they are critical to construct meaningful and accurate ore reserves models. The geologic boundaries are oft
Jan 1, 2004
-
Managing cyclones: A valuable asset, the Copper Mountain case study
By M. Westendorf, T. Banerjee, S. Kaushik, D. Tinney
"Cyclones are one of the most extensively used pieces of equipment within the mineral processing industry because of their simplistic operating and maintenance philosophies. They are commonly used as
Jan 1, 2014
-
Temperature Control On London Underground - Preprint 09-054
By M. J. Gilbey
London Underground is the oldest and one of the deepest Metros in the world. The temperature of the Underground has been increasing over the last 100 years, mainly as a consequence of increases in tra
Jan 1, 2009
-
How To Deliver Your Project On Time: An Owners? Procurement Strategy
By Wayne Green
The Regional Municipality of York, located north of the City of Toronto in Ontario, Canada, has experienced unprecedented growth during the past decade, with new home construction averaging 15,000 uni
Jan 1, 2010
-
Cummins’ Diesel Engines Ready to Meet Global Clean Air Regulations
By Steve Kral
In the United States, the U.S. Environmental Protection Agency (EPA) is set to implement its Tier 2 air quality standards governing high-horsepower, off-road diesel engines. The regulations take effe
Jan 1, 2004
-
Stability Mechanism and Control Technology for Fully Mechanized Caving Mining of Steeply Inclined Extra-Thick Seams with Variable Angles "Mining, Metallurgy & Exploration (2021)"
By Wang Hongwei, Wu Yongping, Cao Peipei, Jiao Jianqiang
Fully mechanized top caving mining of steeply inclined extra-thick seams with variable angles has complex roof rock movement, failure, caving, and filling mechanisms. Moreover, the variable-angle coal
Nov 23, 2020
-
Petrographic Characterization Of Economizer Fly Ash
By B. Valentim
Policies for reducing NOx emissions have led power plants to restrict O2, resulting in high-carbon fly ash production. Therefore, some potentially useful fly ash, such as the economizer fly ash, is di
Jan 1, 2009
-
Summersville Raw Water Intake
By Douglas Banks
Construction for the new 2.5 MGPD raw water intake project commenced December 2002. The project, initially designed as a 12' Ø concrete lined intake shaft,145' deep, with two offset 24" lake
Jan 1, 2005
-
Queens Bored Tunnels, East Side Access, New York
By David Smith, Bernie Martin
The Queens Bored Tunnels consist of 11,000 feet of 19'-6" inside diameter tunnels mined through rock, mixed face and dense glacial till, constructed with bolted gasketed one pass reinforced concr
Jan 1, 2005