Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Ore Processing Business Experiences in Russia 2005-7

    By John Starkey

    "During the period June 2007 to March 2007, John Starkey of Starkey & Associates (Starkey) worked in Russia for High River Gold, supervising the engineering design work that was being done at the IRGI

    Jan 1, 2008

  • CIM
    Setting the Record Straight (1e43186a-ec2a-4801-b2d8-fe8de2f5f8ed)

    By Don Thompson

    Canada’s oil sands are a controversial topic and virtually every newsmaker and layperson seems to have an opinion about this 179 billion barrel resource. The oil sands represent 97 per cent of Canada’

    Jan 1, 2010

  • CIM
    The International Availability of Energy Minerals

    By N. A. White

    Whereas the ultimate world supply of energy minerals-defined as fossil fuels and fissile materials - is controlled by geological factors, the actual supply at any particular time is controlled by econ

    Jan 1, 1978

  • CIM
    Mining Mineral Processing Simultaneous Planning The Work Index Value

    By J. A. Caceres

    Mining planning and mineral processing are almost two unconnected areas. The mining area builds its economical models considering the plant like a constant parameter: a constant throughput, an average

    May 1, 2003

  • CIM
    Oxidative Acid Leaching of a Nickel Sulphide Concentrate: Comparison of Options

    By G. Wren

    As base metal sulphide resources become increasingly challenging to process, producers seek alternative options to treat concentrates. This study considers the mineral, elemental, and leaching charact

    Jan 1, 2014

  • CIM
    The Application of Simulation and Design-of-Experiments Techniques to the Optimization of Grinding circuits at the Heath Steele Concentrator

    By Donald Leroux, Lori Lynn Smith, Robert Hutchison

    "The grinding circuit of the Heath Steele concentrator was sampled under five different sets of operating conditions. The balanced results of the sampling campaigns were used to calibrate steady-state

    Jan 1, 1999

  • CIM
    A Model for Implementing & Continuously Improving the Automated Change Management Process for Construction Mega Projects

    By Sh. Karimidorabati

    In the construction industry, project changes constitute a major cause of delay, disruption, cost increases, poor quality and unsatisfying performance. They are also known as a main factor of litigati

    Aug 1, 2013

  • CIM
    Using Laboratory Scale Flotation Testing to Predict Pilot Scale Flotation Performance

    By E. Amini

    "While methods exist to allow the simulation and optimization of existing flotation operations, there is a deficit in the ability to predict the performance of a new ore type pre-processing. A laborat

    Jan 1, 2009

  • CIM
    Maximising Concentrate Revenues at the Xstrata Copper Kidd Concentrator

    By G. R. Morin, A. R. Leggett

    "In 2010, closure of the Kidd metallurgical plants along with structural changes to the historical ratios of payable metals led to a review of the operating targets at the Kidd concentrator. Previous

    Jan 1, 2013

  • CIM
    LNG Fuelling for Mine Trucks

    By Brad E. Melanson

    Because mine haul trucks consume considerable quantities of fuel, they are ideal candidates for the adoption of cleaner and cheaper fuels like natural gas. Impressive fuel cost savings will be realize

    May 1, 2006

  • CIM
    Influence of Surface Roughness on the Time-Scale of Three Phase Contact Formation by Bubble Colliding with Hydrophobic Solid

    By M. Krasowska

    Dynamics of collision and kinetics of the bubble attachment to hydrophobic solid plates (Teflon) of different surface roughness were investigated. The experiments were carried out in such a way that p

    Jan 1, 2006

  • CIM
    Human Factors and Human Error in the Mining Industry: A Review and Lessons from Other Industries

    By A. Yaghini, Y. Pourrahimian

    "Human factors (HFs) play an important role in the mining and mineral industry, affecting operational and maintenance efficiency and safety. Despite the introduction of new technologies and automation

    Jan 1, 2018

  • CIM
    DFT Study on Reactivity of Different Neutral Flotation Collectors with Cu, Zn and Pb Metal Ions in Solution

    By Manjeet Chowdhry, Qingxia Liu, Phillip Choi, Zhenghe Xu

    Computational chemistry methods, such as density functional theory (DFT), are powerful tools to quantify reagent-mineral interactions encountered in sulphide mineral flotation. A quantitative relation

    Jan 1, 2015

  • CIM
    The Platinum-Group Minerals

    "7.1. Glossary of the Platinum-Group Minerals7.1.1. IntroductionA glossary of the platinum-group minerals (POM) serves as a useful introduction to a chapter on their mineralogy. Earlier glossaries (Ca

    Jan 1, 1979

  • CIM
    Overview of maintenance practices at Louvicourt mine

    By R. Hamilton

    "Louvicourt mine began operation in 1994. It is located in northwestern Quebec, 20 km east of Val d’Or. The mine is owned by Aur Resources (30%), which operates the mine, Teck/Cominco (25%) and Novico

    Jan 1, 2003

  • CIM
    Industrial Gases for Copper Production

    By A. Deneys

    This paper reviews industrial gases used in primary copper production. Copper smelting industrial gas demand has steadily increased since the first commercial oxygenconcentrate smelting in 1952 [1]. I

    Jan 1, 2007

  • CIM
    Intégration De La Désulfuration Dans La Restauration Des Sites Miniers Générateurs De DMA

    By Bruno Bussière

    Le drainage minier acide (DMA) provenant de la circulation des eaux à travers les rejets miniers sulfureux est sans doute le principal problème environnemental auquel est confrontée l?industrie minièr

    Nov 1, 2002

  • CIM
    Encapsulation of Mercury in Gossan Tailings Murray Brook Mine, New Brunswick, Canada

    By Robert Harris, Peter Pheeney

    "The Murray Brook gold mine operated from September 1989 to March 1991. Approximately 1.2 million tonnes of gossan were mined from an open pit and treated at a rate of 900 tonnes per day. The facility

    Jan 1, 2001

  • CIM
    Back Analysis of the West Wall Slope Failure at Lab Chrysotile Mine

    By Philippe Caudal

    This paper presents a case study in which a slope failure was observed on the west wall of the LAB Chrysotile mine in the vicinity of the main ramp in January 2010. Airborne LiDAR results were used to

    Aug 1, 2013

  • CIM
    Constructing, Commissioning and Operating a Mine at High Altitude - The Collahuasi Experience

    By Colin Lindsay

    "The Collahuasi copper mine, located at an altitude of 4300 meters above sea level in northern Chile, commenced operations late in 1998. The mine is currently the 4‘h largest copper producer in the wo

    Jan 1, 2001