Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
High Pressure Grinding of Gold Ore HPGR Demonstration at Newmont’s Lone Tree Mine
By Polysius AG
"The Lone Tree demonstration was an important milestone in bringing High Pressure Grinding Roll (HPGR) technology into hard rock applications in the mining industry. HPGRs have become standard equipme
Jan 1, 2005
-
Pilot Plant Development Studies on Mount Laurier, Canada, Graphite Deposit
By V. Lakshmanan, Dan Mackie, J. Melnbardis
"Crystalline Flake Graphite is a strategic mineral. Since 1954 nearly all North American consumption has been imported from offshore. The Bouthillier Project in Quebec, Canada, is Orrwell Energy's bid
Jan 1, 1984
-
Diamond exploration targets, Michipicoten greenstone belt
By A. C. Wilson
"In 1991, local prospector C. “Mickey” Clement recovered at least three alluvial diamonds from the Michipicoten River. Two of these stones were sent to the Department of Mineralogy, Royal Ontario Muse
Jan 1, 2004
-
Sill pillar recovery at the Louvicourt mine
By D. Fleury
"This paper describes the challenges of mining a sill pillar under various types of paste backfill quality. From 1994 to 2002, Louvicourt mine produced approximately 12,600,000 t grading 3.5% Cu, 1.5%
Jan 1, 2005
-
A Study of Cemented Crude Tailings Backfill Technology Based on Vertical Sand Silos
A key point in the manufacture of cemented backfill is the dewatering and settlement of the total tailings product. A new technology characterized by rapid non-mechanical settlement of total tailings
May 1, 2007
-
Jaguar?s Caeté Gold Project in Brazil
By Ivan C. Machado
Jaguar Mining Inc. is implementing a 1.1 Mtpy, 7-year LOM gold project in the Iron Quadrangle (?Quadrilátero Ferrífero?), Brazil. Construction is on schedule and startup is programmed for Q2 2010. Mil
May 1, 2010
-
Yield Stress Measurement of Cemented Paste Backfill with the Vane Method and Slump Tests
By A. S. Moghaddam
The transportation of cemented and non-cemented mine tailings in the form of paste through pipelines is one of the main stages of paste backfill operations. For the purpose of pipeline design, the rhe
May 1, 2007
-
Commissioning and Operating Experience with Gekko’s Gold Ore Treatment Plants
By Tim Hughes, Steve Gannon, Jennifer Abols
"In the past year, two very innovative gold ore processing plants have been designed, built and commissioned by Gekko Systems Pty Ltd. The first plant in Vietnam utilizes conventional crushing and bal
Jan 1, 2007
-
Dust collection
By I. Tinto
"IntroductionEnvironmental pollution problems, caused by gases or effluents, by high noise levels or from air borne dust, are placing increasing demands of the operators, from statutory authorities, a
Jan 1, 1989
-
Evolution and Optimization of the Gravity Recoverable Gold Test - In memory of Professor Andre Robert Laplante - 1953-2006 Outstanding Mineral Processing Professor, Engineer and Scientist
By Sunil Koppalkar, Liming Huang
"Since late 1980s the research group led by late Professor Andre Robert Laplante at McGill University undertook fundamental studies and applied research of the Knelson Concentrator (KC) and developed
Jan 1, 2007
-
Improving Fluorine-Bearing Minerals Rejection in the Flotation of a Brazilian Sulphide Copper Ore
By Keila Gonçalves, Aline Tavares, Danielly Couto
"The sulphide copper deposits from the Carajás area (North region of Brazil) were generated by the percolation of hydrothermal fluids in volcanic and granitic rock and are denominated as IOCG deposits
Jan 1, 2011
-
Growth through Continuous Improvement - Heap Leach Processing and Gravity Expansion at Fort Knox Gold Mine
By James L. Oleson, Hunter R. Propsom, Kevan J. R. Ford, Robert D. Henderson, Bob Musgrove
"Kinross’ Fort Knox Gold mine, near Fairbanks, Alaska has successfully implemented two major metallurgical continuous improvement projects resulting in growth of gold production and an extension of mi
Jan 1, 2011
-
Westar Mining Ltd.-an overview of operations in southeast British Columbia
By L. B. Hale
"Introduction This paper will discuss the current operations of Westar Mining Ltd. and give a brief history of the company and of the Crowsnest Pass area. Westar is an integrated company involved in m
Jan 1, 1985
-
The Operating Range Method for Backfill Hydraulics
By D. J. Hallbom
This paper presents a novel methodology for the hydraulic design of mine backfill distribution systems. The ?operating range? method uses the concepts of the hydraulic grade line and equivalent pipe l
May 1, 2007
-
Geology and Mine Development of the Red Dog Zinc Lead Deposit, Brooks Range, Alaska
By Brigitte J. Dejou
The Red Dog sediment-hosted zinc-lead deposit is located in the Brooks Range thrust belt in northwest Alaska, approximately 1000 km northwest of Anchorage. The mine constitutes the primary deposit in
May 1, 2006
-
Hazard Map Approach Using Space-time Clustering Analysis of Mining-induced Microseismicity
By Pavel Vasak
Microseismic monitoring has become standard practice in the mining industry as a ground control monitoring tool at depth. Translating the information into practical hazard assessment tools for the roc
May 1, 2004
-
An Overview of Inco's Copper Cliff Operations
By J. R. Donald, K. Scholey
"Nickel has been mined and processed from the Sudbury basin for over 100 years. During this period, the process has evolved into what is one of the largest and most complex mining and metallurgical fa
Jan 1, 2005
-
Bio-treatment of Refractory Gold Ore in Obuasi Mines
By J. K. Afidenyo, J. Osei-Owusu
"The Obuasi Mine of AngloGold Ashanti Limited has been operating the world’s largest Biooxidation Plant at its Sulfide Treatment Plant (STP) in Ghana, using the Gencor Biox® technology since February
Jan 1, 2008
-
A hydrometallorgical process for the extraction of copper
By W. A. Ahrens, J. H. McNamara, J. G. Franek
"An economical, pollution-free process has been developed for the hydrometallurgical extraction of copper from sulphide ores. The extracted copper, in the form of cuprous chloride (CuC/), is converted
Jan 1, 1980
-
Training to Process Analysis Methods using a Gold Leaching Simulator
By Jessica Egan, Daniel Hodouin, Mohammed Reza Khalezi, Steve Bellec, Claude Bazin, Carl Duchesne
"A model for gold leaching was developed and implemented into a simulator. The simulator uses a description of the ore that is based on the mineral composition and precious metal content. The model ac
Jan 1, 2008