Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Use of High Pressure Grinding Rolls for Crushing MagnetiteThe paper describes data from test work programs on a range of magnetite ores in Australia and overseas. The analysis looks at the behaviour of material of different sizes fed to the rolls and the cha
Jan 1, 2009
-
Appin Colliery Belt Drift FireBy Fisher AEJ
On Sunday morning 7th November, 1976, at approximately 2-25 a.m., smoke was discovered issuing from the 1912 m long belt drift at Appin Colliery. A Clouth steel cord rubber belt approximately 940 m
Jan 1, 1981
-
Direct Detection of Buried Orebodies Using GradiometryBy R Paterson, A Christensen
The routine use of gravity gradiometry for the detection of orebodies with no outcrop is now being undertaken. The commodities and orebody styles range from banded iron ore formations to volcanogenic
Sep 26, 2011
-
Four-Dimensional Network Relaxation Method for Long-Term Open Pit Mine SchedulingBy J Yamatomi, Y Tamanishi, S Miwa
The four-dimensional (4D) network relaxation method, originally developed by Akaike in 1999, uses Lagrange relaxation and is known for its ability to include the price change and possible better outpu
Sep 26, 2011
-
Geochemical Characterisation of Flinders Mines’ Pilbara Iron MineralisationBy G D. McDonald
Flinders Mines is an ASX300 iron ore explorer and developer with a tenement package located in the Hamersley Ranges region of Western Australia, approximately 70 km north of Tom Price. Exploration ove
Jul 11, 2011
-
The Effect of Delay Time on Fragmentation Distribution through Small- and Medium-scale Testing and AnalysisBy O Omidi, P D. Katsabanis
The effect of delay time on fragmentation has been discussed for a long period but rarely in a satisfactory and unbiased way. Despite the efforts of many researchers, delay selection for fragmentation
Aug 24, 2015
-
Roasting and Treatment of Auriferous Flotation ConcentratesThis paper is intended to continue the subject in the light of recent work, from where it was left at the conclusion of the discussion on the excellent paper by the late Mr. Noel Haszard. The position
Jan 1, 1939
-
A Method of Assessing the Efficiency of Powered Supports in ServiceBy Bigdy D. N
The paper describes a system for providing mine management with a continuous indication of the effectivness of longwall coalface powered supports in controlling roof-to-floor convergence. The syst
Jan 1, 1988
-
Comparison of Empirical Fragmentation Models at the Gol-Gohar Iron Ore MineBy M Jahani, M Taji
For suitable production planning in an open pit mine, and also to carry out the optimisation process during the mining production cycle, prediction of fragment size distribution is required prior to c
Aug 24, 2015
-
The Influence of Strata Control and Coal Production on Gassiness and Gas Drainage Efficiency in NewCastle CollieriesBy Larkings RH
The high gas emissions associated with the depth of mining and very high coal extraction at some Australian Collieries have provided a need to investigate the influence of geological and mining con
Jan 1, 1986
-
A comparative study of two laboratory crushing techniques for a South African banded iron formation (BIF)By N Maistry, A Singh
It is estimated that in less than a decade, high-grade iron ore reserves in South Africa will be depleted, leaving only low-grade ores with a dominant lithology of banded iron formation (BIF) hematite
Sep 18, 2023
-
The Role of Gravity and Intensive Cyanidation in Processing Preg-Robbing Gold Ores - ABSTRACT ONLYA flow sheet has been developed to treat a high tonnage highly preg-robbing gold ore. The ore is low grade and fine grained with a high proportion of very fi ne free gold. The key components of the fl
Aug 1, 2010
-
An Investigation into the Effectiveness of Under Platform Exhaust Systems Based on Measurements from the Copenhagen MetroBy S Ravn
Under platform exhaust (UPE) systems are often designed into metro stations as a means of removing heat generated by trains as they come to a halt in the platform. These systems are designed to extrac
Mar 8, 2011
-
Adjusting Initiation Direction to Domains of Rock Mass Discontinuities in Aitik Open Pit MineBy N Johansson, D Johansson, A Beyglou, H Schunnesson
As demand for optimisation of mining processes increases, more attention is drawn to blast performance and fragmentation improvement. Fractures and discontinuities are among the most influential facto
Aug 24, 2015
-
Differential Cut-Off GradesDetailed underground mine design and optimisation studies undertaken by the author over the past few years have clearly demonstrated that additional value can be created by varying the cut-off grade (
Jan 1, 2005
-
Strategic thinking about long-term ‘above ground’ orebody complexity using scenariosBy T Craske, J Sykes, T C. McCuaig, M Jessell, A Trench
The prevalent strategic approach in the mining industry is one of planning. However, it is widely recognised that planning does not work in complex and uncertain situations (Mintzberg, 1994), such as
Nov 21, 2018
-
Reducing the Energy Required in Grinding Clinker to Cement – Some Case StudiesBy H Benzer
Grinding clinker to finished cement consumes more energy than any other comminution process. World production of cement in 2009 was 2840 million tonnes and the energy required for comminution was 40-6
Aug 8, 2011
-
Simulation of weathering impact on weak rockBy H Zhai, C Zhang, I Canbulat, K Yui
Sedimentary rock is a lithology that is commonly encountered in mining practices. Their properties, especially the resistance against weathering, are often of critical importance to long-term engineer
Nov 29, 2022
-
Discrete vein modelling – implications of a novel geology driven resource estimation methodology for vein hosted mineral depositsBy J P. van Dijk, M Munro
Discrete vein modelling presents an innovative geology driven 3D modelling method for quantification of vein hosted mineral deposits, with far reaching potential for critical mineral supply and low im
Sep 1, 2024
-
Survey Work in Connection with the Sinking of No. 7 Shaft, Broken Hill South Limited, Broken Hill, N.S.W.THE South Mine. owned by the Broken Hill South Limited, occupies mineral leases 7 and 8 on the Broken Hill lode. The ore reserves are 4,250,000 tons, and the ore hauled for the year ended June, 1930,
Jan 1, 1930