Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Design, Construction, Instrumentation and Performance of a Full-Scale Overburden Stockpile Trial for Mitigation of Acid Rock Drainage, Grasberg Mine, Papua Province, Indonesia

    By S Miller, A Neale

    As part of a long-term acid rock drainage (ARD) mitigation study, PT Freeport Indonesia has completed the construction of a highly instrumented, full-scale, experimental, overburden stockpile to furth

    Jan 1, 2003

  • AUSIMM
    An Overview of Research Into the Use of Ice for Cooling Deep Mines

    By Sheer T. J

    The increasing demand for underground cooling in South African gold mines has resulted in various cooling methods being con- sidered, including the use of ice. Two main areas in connection with ice

    Jan 1, 1988

  • AUSIMM
    Development of Explosive Monitoring Techniques for Use in Quality Control and Production Blast Analysis

    By Moxon NT, Torrace AC

    The detonation pressure of an explosive is a function of its density and its velocity of detonation (VOD) and relates directly to the degree and manner in which the explosive loads the surrounding r

    Jan 1, 1988

  • AUSIMM
    Multi-source data fusion for geological boundary modelling via Gaussian Processes

    By K L. Silversides, A Chlingaryan, A Melkumyan

    Multiple data sources can be fused to improve boundary modelling in stratified deposits such as the banded iron formation (BIF) hosted deposits in the Pilbara Region of Western Australia. Accurate bou

    Mar 22, 2022

  • AUSIMM
    Rational Longwall Layout Design Based on Numerical Stress Analysis

    By Klenowski

    Rational design of layouts for longwall operations is greatly facilitated by use of an accurate and economical method for predicting stresses and displacements. The displacement discontinuity meth

    Jan 1, 1988

  • AUSIMM
    The Role of Geomechanics in the Construction Phase of A Major Tunnelling Project

    Geomechanics is one of the more specialised aspects of site supervision on a major tunnell- ing project. The controlled deformation of a rock mass as a result of tunnelling and the knowledge of loa

    Jan 1, 1976

  • AUSIMM
    Design and Operation of the Dewatering System for the Lochiel Trial Pit

    By Sullivan TD, Redman PG

    AND INTRODUCTION The Lochiel coal deposit, a large Tertiary soft brown coal deposit in the mid north of South Australia, is currently being investigated by the Electricity Trust of South Australia (

    Jan 1, 1988

  • AUSIMM
    Computer Techniques Coal Deposit Evaluation

    By Robinson WB

    An accurate and rapid assessment of coal resources, such as that provided by computer modelling, forms an intergral role in evaluating CSR's coal deposits for future development. An in-house

    Jan 1, 1983

  • AUSIMM
    Plant Design for Remote Locations in Papua New Guinea

    By Majorkiewicz A

    Engineering of gold treatment facilities complete with infrastruc- ture in a remote location such as Papua NewòGuinea present unique problems to the design team. Site location, topography, ground co

    Jan 1, 1991

  • AUSIMM
    Development of a Ground Support and Reinforcement Philosophy for Stoping at the Porgera Underground Gold Mine, PNG

    The initially cautious approach taken towards ground support and reinforcement at the Porgera Underground Gold Mine in the Highlands of Papua New Guinea has evolved rapidly in the two years since stop

    Jan 1, 1993

  • AUSIMM
    Frasers Underground - From Technical Study to Production

    Oceana Gold CorporationÆs (OGC) Frasers underground (FRUG) transitioned into production in early 2008. The mine uses a relatively unique yielding pillars mining method that takes its lessons from empi

    Jan 1, 2009

  • AUSIMM
    The PACMANUS Seafloor Sulfide Field, Eastern Manus Basin, Papua New Guinea

    By J M. Parr, C J. Yeats

    Discovered in 1991 by combined plume detection and bottom-tow photography (Binns and Scott, 1993) and for some years thereafter the highest tenor mineral occurrence known on the ocean floor, the PACMA

    Jan 1, 2008

  • AUSIMM
    Prediction of Time Dependent Factors in Acid Mine Drainage

    By Murray G

    This paper outlines the processes involved in acid generation from sulphides and the key factors in identifying and predicting time dependent changes in the nature of acid mine drainage (AMD). The

    Jan 1, 1988

  • AUSIMM
    Sustainable Minerals Education – We Care, But do You?

    By D Laurence

    Mining cycles have come and gone and with them there have been dramatic swings in the levels of interest and student entry into minerals-related education programs, hence graduate supply to the indust

    Mar 21, 2011

  • AUSIMM
    Cap Rock Blasting Improvement at Worsley Alumina

    By L Neems

    In conjunction with Orica Explosives, Worsley Alumina have managed a program of continuous improvement to their cap rock blasting over the last two years. Blasting conditions are challenging because o

    Jan 1, 1999

  • AUSIMM
    Mid Sampling and Reserve Estimation Practice in the Base Metal Orebodies

    The Mount Isa mine in North West Queens- land produces a total of nearly 10 million t/yr from separate copper and silver lead zinc orebodies. Sampling information is mainly obtained from diamond dr

    Jan 1, 1987

  • AUSIMM
    Dragline Digging Methods in Australian Strip Mines - A Survey

    By Baafi EY

    Open cut mining in Australia is facing the greatest challenge in its history in attempting to compete not only with other operations internationally, but also with underground operations domestically.

    Jan 1, 1998

  • AUSIMM
    Key Engineering Considerations in the Specification and Selection of Mine Refrigeration Plants

    As mines become deeper, the problems of heat in the workplacebecome more acute. An important response from the industry hasbeen the widespread adoption of microclimate cooling such asair-conditioned c

    Jan 1, 2001

  • AUSIMM
    An Integrated Approach to Optimising All Concentrator Products, Including Tailings

    By A Riles

    "Three issues of relevance in a modern tailings storage facility (TSF) are:geotechnical stabilitymanaging acid rock drainage (ARD) from pyritic tailingsmanaging the tailings from cyanidation of gold o

    Jun 15, 2016

  • AUSIMM
    Feature if the New Lead Refinery at Port Pirie

    A new lead refinery with a. capacity of 230,000 tons per year com-menced operation at*Port'Plsie in October, 1959. This plant' superseded the refinery which had operated from 1933 with the a

    Jan 1, 1963