Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Laboratory Experiments of As(V) and As(III) Sorption Onto Pit-Lake Sediments From Three Different Orebody Types

    By D L. Decker, G C. Miller, C Papelis

    Arsenic, often associated with precious metals ore deposits, is a major contaminant released during large-scale gold mining. Because of the complex oxidation/reduction and sorption behaviour of As, pr

    Jan 1, 2003

  • AUSIMM
    Paleomagnetic Results from the Permian Brockstreet Terrane, South Island, New Zealand

    By Bruce P, Luyendyk

    The South Island of New Zealand comprises a collage of distinct tectonostratigraphic terranes. Some tectonic models predict that these terranes formed on or near the margin of Gondwanaland. However

    Jan 1, 1987

  • AUSIMM
    Improving industrial copper processing operations through the application of thermodynamic fundamentals and advanced predictive tools

    By G R. F Alvear Flores

    Mineral resources are becoming more complex in composition and structure making it more difficult to produce clean concentrates for primary metal smelting. In parallel, providing technological solutio

    Jun 17, 2024

  • AUSIMM
    Advanced Design Concept on Largest Diesel-Mechanical Truck-Komatsu HD1600M

    By Kato Y

    As a direct result of the Mining Industries need to improve efficiency and production in Open Pit type operations, the size of haulage units have increased dramatically. This trend has continued su

    Jan 1, 1982

  • AUSIMM
    A Mapping-based Approach to Geological Continuity Prediction Using Examples from the Balmat-Edwards-Pierrepont Zinc District, St Lawrence County, New York, USA

    By R H. Knight

    Uncertainty in prediction and modelling of geological (physical) ore continuity in geometrically complex ore deposits is a key risk factor in mining. Reducing geometric uncertainty of hard-boundary or

    Aug 18, 2014

  • AUSIMM
    The Concentrating Practice of the Broken Hill South Limited

    The concentrating plant of the Broken Hill South Limited was described in Proceedings No. 44, Australasian Institute Mining and Metallurgy, December, 1921, by Wainwright and Read. It was erected on th

    Jan 1, 1932

  • AUSIMM
    Gold Dredging In New Zealand

    The history of gold dredging in New Zealand, leading to the develop- ment of the `New Zealand Type' dredge is considered. Much of this infor- mation has come from contemporaneous publications by

    Jan 1, 1988

  • AUSIMM
    Fluxing Requirements for Copper Smelting Slag

    Silica and limestone fluxing levels in copper smelting slags were studied. Copper concentrates with flux additions were smelted to matte (55.5 per cent Cu) and slag in a pilot scale submerged combusti

    Jan 1, 1985

  • AUSIMM
    New Research Initiatives in Geometallurgical Integration û Moving Towards a Common Operating Language

    The emerging discipline of ægeometallurgyÆ is not new but is becoming increasingly recognised as a discrete and high-value activity that reflects an ongoing commercial and cultural trend towards more

    Jan 1, 2009

  • AUSIMM
    Avoiding Bias when Using Vezins for Sampling Dusty Materials

    By P Cleary, G K. Robinson, J Hilton, P Wilson

    Concern has been expressed that Vezins can be biased when used for sampling fine materials if the cutter speed is as high as the 0.6 m/s which is often used. Using modelling techniques that consider a

    Aug 21, 2012

  • AUSIMM
    How Much Do We Need to Drill?

    By C Taylor, E Retz

    Sequential Gaussian conditional simulation of wide-spaced exploration data has been completed in order to optimise a drilling grid at Fortescue’s Eliwana deposit. The aim of this drill grid is to impr

    Jul 13, 2015

  • AUSIMM
    Mining Can Improve the Environment

    Mining is a necessary part of our modern lifestyle. However, mining can cause damage and pollution of the environment and therefore we must manage our resources wisely accounting for the physical,

    Jan 1, 1987

  • AUSIMM
    The Re-Opening of the Morning Star Gold Mine: A Case Study of the Ongoing Environmental Monitoring and Planning

    By E Hogan, M Goodz, R Wright

    The planning, permitting and monitoring procedures of the re-opening and rehabilitation of mine sites is an ongoing process which must continue throughout and beyond the life of the project. Both indu

    Jan 1, 1992

  • AUSIMM
    Roof Support of the Longwall System

    The effectiveness of three different types of longwall chock under the three different types of geological conditions worked recently is outlined. Some provisional analyses of the variation of chock

    Jan 1, 1974

  • AUSIMM
    Applied Mineralogy of the Suurikuusikko Refractory Gold Deposit, Northern Finland

    By J Leppinen, B Johanson, R Kalapudas, G McMahon

    The Suurikuusikko gold deposit was discovered in 1987 in western Finnish Lapland, 54 km NNE from the town centre of KittilS in the volcanic belt of Central Lapland. It is hosted by tholeiitic basalts

    Jan 1, 2008

  • AUSIMM
    Water and Soil Management Responsibilities

    Both the miner and the Regional Water Board have legal obligations to ensure that all discharges of water from a mine site are free of harmful wastes, and that proper authorisation is obtained to abst

    Jan 1, 1986

  • AUSIMM
    Suitability Of Different Types Of Pellets For Use In Blast Furnaces Or Direct Reduction Shaft-Furnaces

    By de Lassar de Pressigny Y

    IRSID has in its laboratories two experi mental counter-current reduction furnaces allo- wing the simulation of the physico-chemical conditions of reduction in any gas-solid coun- ter-current process

    Jan 1, 1974

  • AUSIMM
    Journey to the Edge of the Basin - Stratigraphic Setting and Iron Mineralisation at the Davidson Creek and Robertson Range Projects, Hamersley Province,Western Australia

    By R McCarthy, P Hawke

    FerrAus Ltd's Robertson Range and Davidson Creek Projects are located in the Hamersley Province about 100 km east of Newman, Western Australia. Significant iron mineralisation defined by an aggre

    Jan 1, 2009

  • AUSIMM
    The Golden Cross Closure Experience - A Success Story or a Work Without End?

    The Golden Cross is the first large precious metals mine to be both commissioned and closed in the æmodernÆ era in New Zealand. This paper discusses the life cycle of the Golden Cross mine, with empha

    Jan 1, 2006

  • AUSIMM
    Technical Feasibility Studies and Uses of Treated Acid Mine Drainage at Kingsmill Tunnel, Peru

    By J Chßvez, J Rosa del Castillo, J Rui

    Environmental Impact Assessment (EIA) and Feasibility Studies (FS) were carried out to evaluate the potential use of treated acid mine drainage (AMD) occurring at the Kingsmill Tunnel in the Central A

    Jan 1, 2003