Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Learning from and managing a significant saprolite instability

    By M Bouare, C Holland, K N’Diaye

    Two adjacent open pits in Mali hosted by deeply weathered saprolitic materials were mined consecutively over the course of approximately 12 months. During excavation, both pits experienced significant

    Jun 22, 2022

  • AUSIMM
    The Exploration Signature of the Coronation Hill Gold, Palladium and Platinum Deposit

    By C A Heinrich, Morse M. P, Cruickshank B. I, Pyke J. G, Whitaker A

    Very little public domain information is available on the exploration signature of the Coronation Hill Au+Pd+Pt deposit. From 1987 to 1990 the BMR (now AGSO) carried out geological, geophysical and

    Jan 1, 1994

  • AUSIMM
    Shape Classification for Fine Particles by Rotary Drum Type Separator

    By Nikaido M, Kanda Y

    A rotary type separator has been developed which separates particles on the basis of their shape. This separator was applied to a particle size range of about 50 - 120 ¦m, and to our present knowled

    Jan 1, 1993

  • AUSIMM
    Analysis and Adaptability of Belt Filter Presses and Other Technologies for Tailings Dewatering over a Range of Mineral Processes, Plant Designs, Conditions, Regions and Operating Philosophies

    By M S. Fenzel

    Increased environmental regulations and pressures have created changing and new demands for tailings management strategies in a variety of mining applications. Critical among these items is the dispos

    Jul 27, 2015

  • AUSIMM
    Developing Mineral Reporting Competency

    By J Coombes

    The JORC Code lists the three core principles of Transparency, Materiality and Competency as fundamental to how mineral estimates are publicly reported. But where the principles of Transparency and Ma

    Aug 22, 2011

  • AUSIMM
    Forecasting mine seismicity – towards a more established methodology

    By A Vakili, F Harvey, H Greaves

    Mine seismicity is one of the most difficult geotechnical risks to manage in seismically active mines. There are currently some established empirical and statistical methods that provide quantitative

    Nov 30, 2018

  • AUSIMM
    Direct observation of the fayalite slag formation behaviour from large SiO2 grains

    By S Natsui, Y Goto, S Kawanishi, J Takahashi, H Nogami

    The demand for copper increases yearly, and further improvements in copper smelting efficiency using flash furnaces are required. This study was conducted to understand and promote the interfacial rea

    Jun 19, 2024

  • AUSIMM
    Empirical mill throughput modelling and linear programming for blend optimisation at the Phu Kham copper-gold operation, Laos

    By B Saunders, J Carpenter

    PanAust’s Phu Kham copper-gold operation (Phu Kham) in Laos is currently limited by throughput in the Semi Autogenous Grinding (SAG) mill. The ability to accurately predict SAG mill throughput (throug

    Sep 20, 2017

  • AUSIMM
    Sustainable Mining – Indigenous Community Benefit

    By J A. Meadows, M G. Annandale, G Castelain

    Bauxite mining on Cape York Peninsula (CYP) commenced in the early 1960s in the region surrounding the town of Weipa. Rio Tinto Alcan (RTA) operates its bauxite mines on the homelands of 11 Indigenous

    Jun 28, 2016

  • AUSIMM
    A Simple Technique for Using High Energy in Blasting

    By S J. Hawke, L A. Dominguez

    In non-ferrous metal mining operations, it is generally necessary to crush and grind the ore to a very fine particle size to effectively liberate the contained mineral from the host rock. Fragmentatio

    Aug 24, 2015

  • AUSIMM
    Determination of the Sampling Liberation Diameter in a High-Grade Coarse Gold Ore by High-Resolution X-ray Computed Tomography

    By I M. Platten, Y Xie, R-M F. Bell, S C. Dominy, L E. Howard, R C. A Minnitt

    For any resource evaluation program, the collection and processing of representative samples for assaying is critical. Sampling, sample preparation and assay protocols must be designed to suit the sty

    Aug 21, 2012

  • AUSIMM
    BHP Billiton Iron Ore Car Dumper 4 - Temporary Works

    By D Ford

    BHP BillitonÆs new rotary iron ore car dumper installation at Finucane Island (Port Hedland) was constructed to increase the total capacity of the port facility from 110 Mtpa to 120 Mtpa and to allow

    Jan 1, 2007

  • AUSIMM
    Evaluation of the impact of modifying froth launders in an industrial flotation bank using novel flotation models

    By A Yáñez, P Vallejos, R Grau, J Yianatos

    In flotation cells, especially in large flotation units, froth management is a crucial variable that should be considered during the design phase or optimised to improve the performance of existing fl

    Aug 24, 2022

  • AUSIMM
    Investigations on Fume Losses at the Sulphide Corporation's Works at Cockle Creek, N.S.W.

    The paper continues an account, begun in a previous paper, of experimental work carried out by the author whilst a member of the metallurgical staff at the Cockle Creek Works. The general method of th

    Jan 1, 1925

  • AUSIMM
    Challenging the Norms Time Usage Model – Mobile Underground Mining Equipment

    By R Ballantyne, M Adams

    Time Usage Models, used as a basis for calculating performance indicators for mobile mining equipment, have developed from very simple to very sophisticated models. This development has paralleled the

    Mar 15, 2021

  • AUSIMM
    Improving Excavation Efficiency at the St Helena Tunnel Using Best Practice Drill and Blast Techniques

    By D Miller, M Dowling, R Domotor

    "This paper is focused on blasting activities undertaken as part of the Pacific Highway Upgrade – Tintenbar to Ewingsdale – project (T2E). This is a ‘priority 1’ Pacific Highway road construction proj

    Sep 17, 2014

  • AUSIMM
    Optimisation of Ok Tedi's Medium-Term Production Schedules Using the Life of Business Optimisation System (LOBOS)

    By D Horacek, I K. Sheppard

    Ok Tedi is in a period of transition. By 2008 mill feed will consist of higher levels of high-grade but metallurgically challenging skarn ores. Additionally, the Taranaki pit will start production in

    Jan 1, 2007

  • AUSIMM
    Justifying Slope Design Risks and Costs

    By N M. Player, R P. Varden, E Jones

    "An effective geotechnical design provides an accurate and appropriate assessment, balanced with a mining company’s risk profile. Justifying the cost of slope assessment requires an understanding of t

    Nov 15, 2016

  • AUSIMM
    The Importance of Rock Breakage Technology to the Future of Underground Space in Australia

    Underground space can be defined as space below natural ground level which can be used as an alternative to an above ground location. While many of our above ground structures inherently involve und

    Jan 1, 1995

  • AUSIMM
    Mathematical Approach for Better Mine Waste Rock Dumping Management

    By Y Li, D J. Williams, E Topal

    A mine waste rock dump does not have any intrinsic value, yet is an inevitable structure in surface mining operations. Since the purpose of mining is to maximise profit, possible expenditure reduction

    Jul 10, 2012