Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Four Metre Diameter Raise Drilling at Olympic Dam Project S.A.

    In the first half of 1987 two four metre diameter raise bore holes were drilled at the Olympic Dam Project for ventilation purposes. The first hole, 476 m x 4.0 m diameter was completed in 96 days

    Jan 1, 1988

  • AUSIMM
    She'll be Right Mate - Culture and Safety

    By N S Melkoumian

    While improvements in occupational health and safety (OHS) in the mining industry have decreased fatalities and accidents, little attention has been paid to the cultural confound of 'safety'

    Dec 6, 2010

  • AUSIMM
    Character of Simulation Material of Coal – Rock and Gas Solid-gas Coupling and Engineering Application

    By C Bie, S Li, P Xiao, P Zhao, H Lin

    "Based on solid simulation material research, the simulation conditions for methane and coal solid-gas coupling were obtained using solid-fluid coupling theory. Using sand as the aggregate and paraffi

    Aug 31, 2015

  • AUSIMM
    Supervisors and Teams at Work

    By T G. Neville, G Terrey, J Burns

    This paper explores recent industry training programs and lessons for supervisors. The Belbin Team Role model was used to increase participants’ awareness of behaviour and its application. The applica

    Jun 22, 2016

  • AUSIMM
    Tectonics of Southern Pacrim

    Four data sets are required to put constraints on the tectonic evolution of the southern rim of the Pacific Ocean basinI . data bearing on the dispersal of the major Gondwanaland continental fragments

    Jan 1, 1990

  • AUSIMM
    Optimising flotation plant operation by using a digital twin in the control room

    By R Tooher, S J. Oliver

    The operation of copper flotation circuit is a challenging task for the site metallurgists and plant operators. To optimise the performance requires meeting both grade and recovery objectives. These p

    Aug 29, 2018

  • AUSIMM
    Morphological Characterisation of Spongillites from South-Eastern Brazil

    By A F. D C Varajpo, R C. Weba, C Volkmer-Ribeiro, C A. C Varajpo, N S. Gomes

    This study relates to the spongillite deposits from the region of Jopo Pinheiro, in the north-west of the State of Minas Gerais, south-eastern Brazil. The deposits occur in shallow ponds (with a maxim

    Jan 1, 2008

  • AUSIMM
    The Development and Integration of a Carbon-In-Pulp Gold Circuit within the Kambalda Nickel Concentrator

    The reasons for and the methods of inte- gration of the gold treatment plant with the existing nickel concentrator are discussed. The integration was accomplished in three stages commencing in May 1

    Jan 1, 1984

  • AUSIMM
    Potential for Future Developments Outside of Existing Fields in the Gippsland Basin

    By MacLean L

    In 1975 the Commonwealth Government established import parity pricing for all liquid hydrocarbons discovered after the 16th September, 1975. These discoveries were termed "new oil" to differentiate

    Jan 1, 1982

  • AUSIMM
    Design and Construction of Sydney’s South West Rail Link Hume Highway Underpass

    By B Chapman, R Nievergelt, J Hill

    A major component of Sydney’s new South West Rail Link project is the Hume Highway Underpass (HHU), an 80 m long twin track mined tunnel excavated at a depth of just 5 m below the pavement of the Hume

    Sep 17, 2014

  • AUSIMM
    Higher Energy Bulk Explosives – Matching Products to Rock Types Using an Energy Map Concept

    By S Thomson, G Rigby, J Norgard, D Wilkinson

    Bulk explosives provide the energy to move a rock mass and reduce it to an optimal size (fragmentation). The intensity of energy needed depends on several factors including a customer’s geology and en

    Aug 24, 2015

  • AUSIMM
    Can We Stop a Black Swan Breeding? Advances in Bowties and Critical Control Management

    By M Andrew, H Reynolds, R Mills

    As the global mining industry continues to grapple with ‘black swans’ (high consequence / low frequency events) for health, safety and environmental losses, the focus is shifting from risk assessment

    Jun 22, 2016

  • AUSIMM
    The Blendevale Carbonate-Hosted Zinc-Lead Deposit, Pillara, Kimberley Region, Western Australia

    By Parrington PJ, Bailey A

    Serious exploration for carbonate-hosted lead/zinc deposits in the Pillara district commenced in 1971 when Trend Exploration acquired exploration tenements covering stream sediment anomalies in th

    Jan 1, 1986

  • AUSIMM
    Examining the relationship (if any) between elevated phosphorus and ore textural type in Pilbara iron ores

    By M I. Pownceby, N Karimian, J R. Manuel, M J. Peterson

    The CSIRO ore classification scheme for Pilbara ores was used as a reference frame to target recognisable ore types/textures with potentially elevated phosphorus content for detailed analysis. Particl

    Sep 18, 2023

  • AUSIMM
    Simulation Model of Gas Injection Aided Dewatering in Underground Mining

    By Kesser Z, Vincze T

    The Western Mining Corporation mining lease on the Bendigo Goldfield measures 5krri x 18km with more than 20 anticlinal folds parallelling th long north-south boundaries. Numerous closely spaced sha

    Jan 1, 1988

  • AUSIMM
    A Modern Mass Transit System for Hanoi - The Capital of Vietnam

    By N Van Buc, E Coroiu

    The rapid socio-economic growth of Hanoi City coincides with a corresponding growth of the transport demand. Today, the transport in Hanoi is completely dependent on private modes of transport. Becaus

    Jan 1, 1999

  • AUSIMM
    Phase equilibrium study in the sodium metasilicate primary phase field of PbO-Na2O-SiO2 system between 800 and 1000°C

    By X Ling, M Barati, E Moosavi-Khoonsari

    In the pyrometallurgical process of secondary lead recycling, a desulfurising agent, such as Na2CO3 is added to minimise the emissions of sulfur into the atmosphere, while silica is introduced into th

    Jun 19, 2024

  • AUSIMM
    Thin Spray-on Liner Concepts and Practical Examples of the Non-Reactive System - MEYCO TSL 865

    TSL Concepts and Practical Examples of the Non-Reactive System - Meyco TSL 865 Thin Spray-on Liners (TSLs) have been intensively investigated by mining and chemical industries within the last decade.

    Nov 25, 2010

  • AUSIMM
    Impact testing of raise bore protection mesh

    By M Doran

    The Olympic Dam mine utilises 1.1 m to 1.4 m diameter raise bores for generating the initial slot void for most production stopes. Slot raise bores generally span two development levels ranging from 3

    Mar 29, 2023

  • AUSIMM
    Pilot Scale Testing of Australian Coals for Nox Emmisions

    The pilot scale testing of Australian coals for their NO, emissions was carried out at the ACTC to investigate the influence of coal properties, furnace conditions and different NO,, control strate

    Jan 1, 1991