Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Groundwater modelling support for closure approvals at Ranger Uranium MineBy J Sigda, T Jones, D Staggs, J Ewing, C Cheng, J Pickens, S Paulka
Mine-derived solutes from Energy Resources of Australia’s (ERA’s) Ranger uranium mine have been closely monitored for decades. Ranger is surrounded by the Northern Territory’s Kakadu National Park and
Jul 1, 2021
-
Open Pit Production Scheduling Optimisation - Why the Mining Industry Needs a New Phase Design ApproachThe long-term production schedule of open pit mines that maximises the net present value (NPV) of a given project relies on the proper design of phases (pushbacks) within the ultimate pit limits. Ther
Dec 6, 2010
-
Preliminary Design for the Rockwater Power Project, South Island, New ZealandBy H Asche
The proposed Rockwater Power Project is a hydropower development on the Waitaki River in the South Island of New Zealand. The proposed development will have an installed capacity of 250 MW with a peak
Mar 8, 2011
-
RISKGATE« - A Case Study in Application to Fires on Mobile PlantBy J Harris, P Kirsch, D Cliff, M Spinks, S Goater, D Sprott
Fires are a common and recurrent unwanted event in the operation of open pit mines. In most cases, the causes of events such as fires are already æknownÆ but are either overlooked or not fully address
Sep 18, 2012
-
Mineralogy of New Australian X-ray Fluorescence StandardsBy K Knorr, S Birch
The mineralogy of new certified-reference-materials (CRM) for X-ray fluorescence from Western Australia (ASCRM 030 to 035) was analysed by X-ray diffraction using the BRUKER energy dispersive one-dime
Aug 12, 2013
-
An integrated approach to mine planning – building the integrated planning model at Tropicana gold mineBy M Kent, D Elder, J Woodward, R Edwards, B Catto
At Tropicana gold mine (TGM), mine planning is completed from ‘one source of truth’ known as the Integrated Planning Model (IPM). The IPM is a block model which forms a core component of the TGM Mine
Sep 20, 2017
-
Application of Statistical Approaches for the Development of Cost Estimation Models for JawáCrushersBy J V. Mehrabani, A R. Sayadi
Adequate estimation of equipment costs is a key factor in a feasibility study and in evaluation of design alternatives for mining and mineral processing projects. Inaccurate early cost estimation coul
Sep 26, 2011
-
Gas Evolution Trends for Coal from Two Different Areas at Clarence CollieryBy J Sargeant, T Levi, J Theiler, B Beamish
Two coal samples (810 Panel and Area 900) collected from Clarence Colliery have been tested under a controlled heating procedure to evaluate the gas evolution trends corresponding to increasing temper
Aug 31, 2015
-
The application of critical chain project management to sublevel open stoping at Olympic DamBy J Light
Since 2019, the mine planning team at Olympic Dam has been establishing and maturing a shift from deterministic to probabilistic scheduling techniques. This paper outlines this journey undertaken by t
Mar 29, 2023
-
In Situ X-ray and Neutron Diffraction Studies of Silico-Ferrite of Calcium and Aluminium Iron Ore Sinter Phase FormationBy M I. Pownceby, N A. S Webster, A J. Studer, I C. Madsen, J A. Kimpton, M J. Fisher-White, L Lu
In situ synchrotron X-ray and in situ neutron diffraction-based experimentation have been implemented to characterise the formation of the complex calcium ferrite iron ore sinter bonding phases silico
Aug 12, 2013
-
A day in the life of a mineworker in 2045By G McCullough, J Bassan, d P. Knights, C T. Farrelly
By 2045, carbon-neutral mines will be economically producing products that are vital for the world’s transition to renewable energy. After overcoming significant technical challenges (and the investme
Sep 1, 2024
-
Bulk carrier vessel tracking automation – the Dalrymple Bay use caseBy W Russell, P Wighton, J Franke
Recent advances in ruggedised industrial control system technology and architecture in combination with latest technologies in the fast-evolving 3D LiDAR sensor sector becoming available have enabled
Nov 8, 2021
-
Precision Analysis of Iron Ore Sampling, Preparation and Measurement -Overcoming Deficiencies in the Current Standard ISO 3085At Cliffs Natural Resources Ltd (CNR) crushing and shipping sample stations, precisions are estimated for the sampling, preparation and measurement stages of iron ore sampling in accordance with ISO 3
Mar 1, 2010
-
Adapting to Geotechnical Change – a Case Study of the Carina Open Pit MineBy R Jaine, D Strang, M Fowler
"This paper presents a case study demonstrating active geotechnical pit slope management at the now completed Carina Iron Ore Project operated by Mineral Resources Ltd (MRL). The site is located 105 k
Nov 15, 2016
-
The Importance of Collaboration between Designers and Contractors in Implementing a Design in Challenging ConditionsBy V Gumba, S Narendranathan, C Barker, R D. H Thomas, G P. Bungard
This paper presents the positive outcomes on an EPCM project, which was undertaken in a challenging environment, whereby the design team had to generate a design with a number of stringent serviceabil
Sep 18, 2012
-
Mine to Mill Reconciliation - Three Case StudiesBy J T. Carswell, N A. Schofield
Fluctuations in periodic reconciliations between the mine and the mill are an expected and common experience in mining and processing operations. These fluctuations are caused in part by errors in the
Nov 20, 2012
-
Now, this is the Time for Mining Companies to Choose - Real Option Valuation or Discount Cash FlowBy S Shafiee, N Abbate
The evaluation of mining projects requires a methodology that will give flexibility and manage the existing uncertainty within the projects. The discount cash flow (DCF) and other traditional evaluati
May 24, 2012
-
Discovery of the Johnston Range Gold Deposits by Reconnaisance Multi-Element Laterite GeochemistryBy Brigden J. F, Birrell
A regional geochemical exploration programme commenced in July 1983, based upon low-density sampling of lateritic duricrust over parts of the Yilgarn Block of Western Australia. This resulted in r
Jan 1, 1988
-
Sulfur distribution ratio in iron and steelmaking slagsBy R G. Reddy, A Yahya
The sulfur distribution ratio (Ls) is an expression of the amount of sulfur in slag to the amount of sulfur in molten metal. The sulfide capacities calculated from Reddy-Blander (RB) model were used t
Aug 21, 2024
-
Setting new standards at Kanmantoo – effective grade control proceduresBy M Reid, H Arbon
Hillgrove Resources (HGO) commenced open pit mining in 2011 and from 2011 to 2016 the geology team experienced a consistent negative reconciliation between grade control estimated copper (Cu) grade an
Sep 20, 2017