Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Application of enterprise optimisation considering ultra high intensity blasting

    By J Pan

    This case study assesses the application of Mine-to-Mill optimisation combined with Whittle Consulting’s Prober<sup>®</sup> economic optimisation for the purpose of economic value upl

    Nov 21, 2018

  • AUSIMM
    Ancestral Pacific Margins in Eastern Australia Some Lessons from the Modern Pacific Rim

    By Mallett CW, Hammond RL

    Geological maps of the Pacific Rim recently published by the Circum-Pacific Council for Energy and Mineral Resources have provided a useful perspective from which to view modern plate interaction

    Jan 1, 1987

  • AUSIMM
    Water Recovery From a Mine in the Atacama Desert

    By H Plewes, A Bur, L Murray, J Pottie

    Water recovery from tailings for reuse in mineral processing is essential to operation of mines in the Atacama Desert of Chile. With annual rainfall of 5 mm, the prudent and efficient use of available

    Jan 1, 2003

  • AUSIMM
    Yallourn North Extension Open Cut Interim Rehabilitation

    By Pilkington T, Noy A

    The Yallourn North Extension (YNX) open cut mine ceased mining operations in early 1989. YNX may be used again for coal supply at the discretion of the Coal Corporation Of Victoria (CCV); this has res

    Jan 1, 1992

  • AUSIMM
    Telepresence – the application of remote control and automation technologies for increased safety and productivity

    By J Cronin

    For the last decade, we have read about the great technical innovation that is coming to the mining industry that will increase safety and productivity. There is consensus that it will be a technical

    Oct 16, 2017

  • AUSIMM
    The Prevention and Control of Burning in Waste Coal Dumps

    By Lukaszewski GM

    The indiscriminate surface disposal of coal waste in the past has created a serious fire hazard in the bush of the northern New South Wales coalfields. Spontaneous or bushfire-induced combustion in l

    Jan 1, 1970

  • AUSIMM
    Future skills and workforce evolution – training and skills development for mining operation engineer and drill and blast engineer in surface mineral mine PT Indo Muro Kencan

    By H Utama, R Heryadi

    PT Indo Muro Kencana (PT IMK) is a surface gold and silver mine located in Mt. Muro area, Central Kalimantan province, Indonesia. The mining operations of multiple open pits using combination of excav

    Sep 1, 2024

  • AUSIMM
    Super-Scavenging of zinc Residue by the FASTFLOT Process at Pasmico Mining, Broken Hill

    By Fickera M. A, Marshall S, Burgeese F. L, Burgees J, Estrina H

    A new high intensity flotation process FASTFLOT was deployed to recover residual zinc from the zinc circuit tailings at Pasminco Mining's Concentrator, Broken Hill. Performance of the FASTFLOT

    Jan 1, 1995

  • AUSIMM
    BHP Iron Ore Pty Ltd Protocol for Mine Closure Goldsworthy, Western Australia

    Background BHP Iron Ore Pty Ltd is one of the major iron ore producers in the Pilbara Region of North Western Australia. The company manages three separate joint ventures; the Newman, Goldsworthy a

    Jan 1, 1994

  • AUSIMM
    Resource Estimation for the Aurukun Bauxite Deposit

    By C Grobler, M Recklies, G Jiang, I Taylor, M Morgan, G MacDonald, L Smith

    The resource estimation of lateritic deposits, such as Aurukun, presents specific issues related to the lateral changes in thickness and elevation of the various horizontal layers (or zones) within th

    Jan 1, 2009

  • AUSIMM
    The possibility of using an autogenous Hydrogen-DRI slag as a raw material for vanadium extraction

    By N Kojola, A Vickerfält, J Huss

    The possibility of using an acidic autogenous hydrogen direct reduced iron (H-DRI) slag as a basis for vanadium extraction is investigated. For a raw material to be suitable for producing high-quality

    Jun 19, 2024

  • AUSIMM
    Economic recovery of low-grade fine iron ore using the Optima Classifier

    By F van de Venter, J Monama, T Kale

    For a multitude of years fine iron ore, -1 mm, across the world has been deposited as discard material in tailings facilities. This contributes to environmental problems, decreases plant yield and inc

    Sep 18, 2023

  • AUSIMM
    Extending Information from Coal Bore Cores

    A description is given of a detailed examination of a coal bore core and of attempts to predict properties of equivalent "as-mined" coal using the bore core data so obtained. The accuracy of the pr

    Jan 1, 1972

  • AUSIMM
    Gemstones in Australia - The State of Play

    By S R. Pecover

    AustraliaÆs opal and sapphire mining industry has fallen from its peak in the 1980s and 1990s into a significant low today. This is not due to exhaustion of the resource, but instead an over-reliance

    Jan 1, 2008

  • AUSIMM
    Dynamic Simulation of Size Reduction Operations from Mine to Mill

    By Pate W. T

    This paper describes the development of a dynamic flowsheet simulator for comminution operations. Object oriented software design allows the handling of multiple ore types, blended into multicompone

    Jan 1, 1998

  • AUSIMM
    A case study: how being ‘aware of now’ is making work safer at Telfer underground

    By S B. Fitch, S A. Wilson, A J. R Barr, P R. Searle

    Improving the safety culture and performance of any operation is a fundamental goal of every mine operator. Methods of implementing, or changing a culture have developed from the early methods of oper

    Mar 15, 2021

  • AUSIMM
    Modelling of Dry Magnetic Separator by Artificial Neural Network at Gol-e-Gohar Iron Ore Mine

    By B Yeganeh, A Sam, A Kohsari

    The base of separation at Gol-e-Gohar iron ore plant (Sirjan in the south of Iran) is magnetic separation after milling. Magnetic separation in the plant is divided into two parts: dry magnetic separa

    Jan 1, 2007

  • AUSIMM
    Exploration in the Gippsland, Bass and Otway Basins

    Location & Permit Status Three major Mesozoic Tertiary basins exist along the continental shelf area of southeastern Australia, known as the Bass Strait area. They are the Gippsland (east of the long

    Jan 1, 1970

  • AUSIMM
    Realisation of Value through Identification of Various Oxidation Fronts and Mineralisation Styles at Trilogy Cu-Au-Ag-Pb-Zn Deposit

    By B Armstrong

    The Proterozoic poly-metallic Trilogy deposit was discovered in 1997, and until recently, mining evaluation was stalled due to poor metallurgical performance. Unlocking the substantial economic value

    Sep 5, 2011

  • AUSIMM
    Energy Efficiency Opportunities in Milling – Improving Comminution Circuit Efficiency

    By F Musa

    One of the main energy efficiency opportunities identified from the majority of mine site energy audits is to optimize the comminution circuit to reduce energy consumption through improved throughput

    Aug 8, 2011