    Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer Programming

    By Y Li, S Ramazan, E Topal

    A mine waste dump progression plan can provide a clear outlook of the mining operation. To produce such an output requires detailed placement schedule of the mined material, including the volume (or t

    Nov 24, 2014

  • AUSIMM
    The History of Ore Reserve Classification and Reporting in Australia

    By Glasson K. R

    The history of Ore Reserve classification and reporting in Australia is largely a history of the Australian mining industry itself. In the late 1800s, when the industry was dominated by small scale,

    Jan 1, 1992

  • AUSIMM
    Driving Haulage Productivity Improvements through Industry–Academia Collaboration

    By R Thompson, J Miedecke, D Handel, E Tomicek, D Tulloch

    "The Mine Haul Road Optimisation Alliance (HROA) is a unique Australian industry–academia collaboration that has been developed to support mine haul road operators. The alliance integrates industry, e

    Nov 15, 2016

  • AUSIMM
    Optimisation of cemented rock fill strength for open stope support

    By J Player, R de Vries, E Villaescusa, H Saw, R Hassell

    The use of cemented rock fill (CRF) for support of open stope walls has increased in the Australian underground mines operations over the last five years due in part to its low capital cost. In open s

    Oct 16, 2017

  • AUSIMM
    Paving the Future - A Case Study Replacing Truck-and-Shovels by Shovel-and-Conveyor Continuous Mining at Carajas Open Pit Mines

    By C T. Senra, A Souza

    Increasing fuel prices, unavailabilty and high prices of tyres have imposed tremendous challenges for large open pit operations. Carajßs open pit mines, one of the largest iron ore projects in the wor

    Jan 1, 2009

  • AUSIMM
    Design considerations for an iron tailings filtration plant and their conveying and disposal systems

    By C Garrido, J Barrera, H Alvarez, L Perez, S Ramirez

    In recent years, there has had a greater recurrence of studies and projects that consider tailings filtration followed by dry stacking to reduce the consumption of fresh water, the space required for

    Nov 8, 2021

  • AUSIMM
    Preliminary Safety Analysis for the Connection of a Thermal Oxidiser to a Working Coal Mine

    By D Cork, R Peet

    "Methane is a signifi cant greenhouse gas. Methane is released from coal seams during the mining process, both in surface and underground operations. This uncontrolled release is termed æfugitive emis

    Jun 1, 2012

  • AUSIMM
    Development – Back to Basics

    By I T. Ross

    In the last 50 years there have been tremendous improvements in equipment used in development on underground mines. Compressed air powered jacklegs have been replaced by high powered electro-hydraulic

    Mar 24, 2014

  • AUSIMM
    Observations on the Behaviour of a Gold Tailings with Hypersaline Pore Fluid

    By D Reid

    Characterisation of non-plastic segregating tailings presents a number of challenges: the material cannot typically be sampled in an undisturbed state, remoulded samples exhibit different behaviour to

    Jul 27, 2015

  • AUSIMM
    Professional Engineering Competency Standards in the Queensland Mining Industry

    A key issue in maintaining the mining industryÆs social contract to access community-owned resources, is the need to be able to demonstrate professional management of resource extraction and the risk

    Jan 1, 2009

  • AUSIMM
    In-Pit Crushing and Conveying

    By I Lourel

    In evaluating the installation of an in-pit crushing and conveying (IPCC) system for any mine, a number of options are available for each of the dig side, transport and dump side operations. Some of t

    Jan 1, 2009

  • AUSIMM
    Use of alternative drilling technologies during diamond drilling activities at Ernest Henry Mine – a fractured aquifer case study

    By E Philippa, J Vitanza, C Hawtin, B Miller

    B Miller , E Philippa , C Hawtin and J Vitanza

    Mar 22, 2022

  • AUSIMM
    Controls on Disseminated Gold Mineralisation at Fosterville, Victoria, Australia

    The Fosterville Goldfield has a modest past production (0.3 Moz), but is now emerging as a significant goldfield (2.6 Moz resources, including 1.1 Moz reserves) with implications for exploration withi

    Jan 1, 2005

  • AUSIMM
    Functional safety impacts on study stages of major projects

    By M C. Goode

    The use of electrical or electronic safety systems to protect personnel, and the engineering tasks associated with the design, manufacture and maintenance of these systems are referred to using the te

    Jul 24, 2017

  • AUSIMM
    Pre-concentration via waste rejection based on fragment size – Olympic Dam case study

    By K Ehrig, V Liebezeit, Y Li, B Pewkliang, M Smith, E Macmillan

    Pre-concentration of low grade ores via the rejection of low/no value materials based on fragment size is the subject of many published papers and studies over the past decade. However, the possibilit

    Nov 10, 2020

  • AUSIMM
    Conducting High Chrome Grinding Media Trials at NewcrestÆs Ridgeway Concentrator

    By C J. Greet, J Kinal, C Hitchen

    Following the successful completion of a marked ball test defining the potential wear benefits the high chrome alloys may offer against forged steel, as well as laboratory test work investigating chan

    Oct 29, 2012

  • AUSIMM
    Planning for underground mining at Savage River Iron Ore Mine

    By U Singh

    This paper presents the evolution of the studies and strategic plans to extend the life of operations at the Savage River iron ore project in north-western Tasmania. The current Life-of-Mine (LOM) pla

    Mar 29, 2023

  • AUSIMM
    Beyond NPV - A Review of Valuation Methodologies and Their Applicability to Water in Mining

    By D Brereton, C J. Moran

    In this era of rising focus on the social and environmental costs and benefits of mining operations, the valuation methodologies used to assess such impacts become increasingly important. Within an in

    Jan 1, 2006

  • AUSIMM
    Manganese ù From Waste to High-tech Material

    By M D. Urbani

    HiTec Energy Ltd has been conducting research since 1996 into novel process routes for the treatment of low-grade and waste manganese sources for the production of high value and high quality electrol

    Jan 1, 2004

  • AUSIMM
    Measurement of Blast-induced Pressure in Bench Blasting and Deciphering Explosive Performance through Rock Mass Response Analysis – A Methodology

    By A K. Raina, V M. S R Murthy

    Rock mass response in blasting is an important element to determine the performance of a blast along with its other outcomes. The near-field monitoring for rock mass response analysis is vital for det

    Aug 24, 2015