Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Fan specification and tender adjudication for mine ventilation engineers with particular reference to turnkey projectsBy D J. Brake
The correct specification and then selection of primary or major fans for an underground mine is a critical decision not only in terms of fan capital and operating costs, but also safety and reliabili
Aug 28, 2017
-
Phosphorus Phase Analysis of Medium-Low-Grade Rare-Earths-Bearing Phosphate OresPhosphorus Phase Analysis of Medium-Low-Grade Rare-Earths-Bearing Phosphate Ores
Sep 13, 2010
-
Conceptual Design of a Dry-stacked Coal Rejects Facility in a Subtropical ClimateBy A M. Barrett, P J. Chapman
As filtering technology improves and there is an increased focus on environmental impacts, the concept of managing fine coal rejects by filtering, mixing with coarse rejects and dry stacking them is b
Jul 27, 2015
-
AGL Energy, Loy Yang and GHD – a Further Case Study in Alliancing: Ten Years onBy J Missen, P Currie, J Bohan, D Clark
AGL is one of Australia’s leading integrated energy companies and the largest ASX listed owner, operator and developer of renewable energy and thermal generation in the country. AGL owns and operates
Jun 22, 2016
-
Development and permitting of an underground mine at Cowal Gold OperationsBy J Northfield, L Neesham
The GRE46 Underground Project lies beneath the environmentally unique and culturally endowed shore of Lake Cowal. The ore body is open both along strike and at depth and is currently defined to a stri
Mar 15, 2021
-
Kempfield Silver, Barite and Base Metal (Pb-Zn) Deposit, Lachlan Orogen, Eastern AustraliaBy D Timms
The Kempfield deposit is located in the Hill End Trough, one of several intracratonic basins developed during Silurian–Devonian time, in the eastern province of the Lachlan Orogen, Eastern Australia.T
Aug 22, 2011
-
Suitability of Leached Ash as an Alternative Landfill Cover MaterialBy A Bouazza, J Kodikara
In this study, 23 samples of leached ash (LA) were collected from an ash pond at Loy Yang Power Station and geotechnically characterised. The samples were collected at various depths and locations wit
Jan 1, 2003
-
The Transition from Semi-autogenous to Autogenous Milling at Waihi GoldBy D Bertoldi, C Haines
"The Waihi Gold Mine (WGM) operated by OceanaGold New Zealand Limited is a wholly owned subsidiary of the OceanaGold Corporation of Australia. Traditionally WGM has stockpiled and processed separate c
Oct 10, 2016
-
Surface Subsidence Modelling for Prediction of Settlements from Thick Seam Partial ExtractionThis paper discusses the prediction of subsidence over partial extraction systems in thick coal seams. A model based on empirical techniques using influence functions is developed to calculate the sur
Jan 1, 2002
-
The history of mine ventilation in the United KingdomBy J R. Leeming
Mines require ventilation to ensure an adequate atmosphere for the sustenance of life, and to dilute, render harmless and remove contaminants.This paper describes the developments in the United Kingdo
Aug 28, 2017
-
A Review of the Theory and Application of Multi-Criteria Decision Analysis Techniques in Mine PlanningMine planning includes equipment selection as a subprocess because aging equipment must be replaced to maintain or improve productivity levels. The criteria used for decision-making in mine planning a
Dec 6, 2010
-
Cobalt, copper tailings and the circular economy – a case study from the Capricorn Copper Mine, north-west Queensland minerals provinceBy L Nicholls, A Parbhakar-Fox
Reprocessing Queensland’s historical copper tailings for critical minerals is an opportunity to circularise the state’s mining industry by converting waste liabilities into assets. Mine waste valorisa
Aug 2, 2023
-
A National Code for Reporting Coal Resources and ReservesIn November 1986 the Australian Minerals and Energy Council (AMEC) endorsed an "Australian Code for Reporting Identified Coal Resources and Reserves" for use by the Federal and all State Governments
Jan 1, 1987
-
A Day in the Life of a Mine Worker in 2025By V Srinivasan, P Knights, C T. Farrelly
By 2025, with the widespread industry adoption of remote operation centres and advanced analytics, mining companies will find themselves making better, more informed decisions across the value chain.
Jan 1, 2008
-
Managing Community Relationships and Corporate Reputation - A Stakeholder PerspectiveBy S McEachern, J Lowe
An important issue currently facing the mining industry in Australia is the management and cost to the industry and other stakeholders of entry into and exit from towns and their communities. These co
Jan 1, 2006
-
The basics of grinding circuit optimisationBy A Giblett, B Putland
This paper provides a simple guiding framework for grinding circuit optimisation, focussing on common themes in past optimisation success stories, the conditions for success and techniques that can be
Aug 29, 2018
-
Propagation of the South Wedge - Drill and BlastBy R Cunningham, P Duniam
Late in 2005 it became apparent that cave propagation at the Northparkes Mine was not progressing as planned. By mid-2006 sufficient Reserves were identified to warrant an extensive drill and blast pr
Jan 1, 2007
-
Predictive maintenance modelling for bearing-based equipmentBy Y Xie, D Willingham
Predictive maintenance (also known as ‘condition/health monitoring’) refers to the intelligent monitoring of equipment to avoid future failures. In contrast to conventional preventive maintenance, the
Jul 24, 2017
-
Delivery of Effective Plant ShutdownsDelivery of effective plant shutdowns is primary to the business success of mining and processing plant operations. This paper sets out a methodology that starts with understanding the business object
Jan 1, 2004
-
Coal Pillar Design Criteria for Surface ProtectionLarge areas of ground are permanently supported on coal pillars, both in extensive old workings and current drivages in active mining operations. Continued growth of civil infrastructure is resulting
Jan 1, 2005