Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    High Pressure Sulfuric Acid/Oxygen Leaching of Platinum Group Metals Bearing Ni-Cu Mattes

    High Pressure Sulfuric Acid/Oxygen Leaching of Platinum Group Metals Bearing Ni-Cu Mattes The processing of platinum bearing Ni-Cu ores for the extraction of platinum group metals (PGMs) involves com

    Sep 13, 2010

  • AUSIMM
    The practical characterisation of ferrosilicon for dense medium applications

    By W Blair, J Bosman

    The measurement of ferrosilicon rheology and characterisation of the parameters that have a direct influence on medium rheology provide the basis for evaluating, comparing and selecting an appropriate

    Jul 24, 2017

  • AUSIMM
    Comparison of Discretised Population Balance (DPB) and Finite Element Method (FEM) Methodologies for Modelling Batch Gibbsite Precipitation

    Comparison of Discretised Population Balance (DPB) and Finite Element Method (FEM) Methodologies for Modelling Batch Gibbsite Precipitation

    Sep 13, 2010

  • AUSIMM
    Grey River Gold Dredge Project

    Grey River Gold Mining Ltd commenced dredging alluvial flats in the Grey River Valley in 1989. Previous drilli

    Jan 1, 1990

  • AUSIMM
    Methods for Improving the Flotation Recovery of the Coarse Fraction of a Nickel Ore

    Methods for Improving the Flotation Recovery of the Coarse Fraction of a Nickel Ore

    Sep 13, 2010

  • AUSIMM
    Foliation Thickness and Mica Grain Size: Two New Ways to Subdivide the Otago Schist, Zew Zealand

    At a regional scale, the Otago Schist has been divided into textural zones, metamorphic zones, structural transposition zones, and terranes and lithologic associations. Each of these subdivisions reve

    Jan 1, 2001

  • AUSIMM
    Risk and Alternate Dispute Resolution Options for Mining Companies Operating in South East Asia (Including a Case Study)

    By K Broadley

    Risk and dispute resolution are linked. Dispute resolution techniques are brought to bear on a dispute - which is an outcome of a risk being wholly or partially realised. There has been an increasing

    Jan 1, 1999

  • AUSIMM
    Clinoptilolite as a Low-Cost Solution to Remove Heavy Metals from Water in Mining and Mineral Processing Industry

    Clinoptilolite as a Low-Cost Solution to Remove Heavy Metals from Water in Mining and Mineral Processing Industry

    Sep 13, 2010

  • AUSIMM
    The Fouling of Activated Carbon - A Study Based on Macraes Gold Mine

    Maintaining high carbon activity is vital to the efficiency of any Carbon-In-Leach or Carbon-In-Pulp process. Reduced activity can lead to longer residence times or gold losses in the tails. Regenerat

    Jan 1, 1993

  • AUSIMM
    Systems and Protocols of Geological Information Management at Telfer Gold Mine, Western Australia

    By G R. Howard, G Back

    Management of information systems for data collection is essential to maintain data integrity and continuity, and manage loss control on a large world-class mine such as Telfer Gold Mine. This paper a

    Jan 1, 2000

  • AUSIMM
    Leachwell Versus Fire Assay: Comments from Assay Quality Assurance at Tarmoola Gold Mine

    A fundamental component of grade control at Tarmoola Mine has been the monitoring of assaying through quality assurance programs. The programs have concentrated on issues related to accuracy and preci

    Jan 1, 2000

  • AUSIMM
    Study on Rational Process Flow Sheet for Beneficiating Low-Grade Cu, Mo, Bi, S, W Polymetallic Ore

    Study on Rational Process Flow Sheet for Beneficiating Low-Grade Cu, Mo, Bi, S, W Polymetallic Ore

    Sep 13, 2010

  • AUSIMM
    Copper Recovery from Printed Circuit Board by Carbonisation

    Copper Recovery from Printed Circuit Board by Carbonisation

    Sep 13, 2010

  • AUSIMM
    Tectonic Setting of Stratiform Ore Deposits Buried in Sedimentary Cover of the Pacific Ocean

    Five types of mineral resource were known in the sedimentary cover of the oceans and seas floors prior to the 1980s: 1. hydrocarbon fields including some very large zones of oil and gas accumulation;

    Jan 1, 1995

  • AUSIMM
    The Formation of Banded Epithermal Quartz Veins at the Golden Cross Mine, Waihi, New Zealand

    By G B. Arehart, S J. Mathews, J L. Mauk

    The banded nature of the quartz veins which form the Empire lode at the Golden Cross mine, is perhaps their most striking feature. Petrographic studies show that significant differences occur between

    Jan 1, 1995

  • AUSIMM
    An Environmental Evaluation of the Geochemical Properties of Kaiata Mudstone and Brunner Coal Measures, Cypress and Stockton Mines, West Coast, NZ

    By D Craw, P Lindsay, B Peake

    The geochemical properties of Kaiata Mudstone and Brunner Coal Measures are evaluated in order to determine their suitability for placement at the proposed Cypress and existing Stockton mines. Correct

    Jan 1, 2004

  • AUSIMM
    Mining Practices and their Effect on Mobile Equipment Costs

    By R Lethlean

    The mining industry in its drive to optimise equipment use and minimise cost simply to remain profitable in an uncertain commodity market needs to develop a greater understanding of equipment capabili

    Jan 1, 1998

  • AUSIMM
    The Cleaning of Buller Coals

    By P J. Minehan

    The investigation of the potential of the Webb/Baynes block of the Buller coalfield for anode carbon manufacture has generated much information on the physical beneficiation characteristics of the Bul

    Jan 1, 1983

  • AUSIMM
    Dynamics of Three Phase Contact Line Motion in Liquid-Liquid-Solid Systems - Impact of Surface Roughness

    Dynamics of Three Phase Contact Line Motion in Liquid-Liquid-Solid Systems - Impact of Surface Roughness

    Sep 13, 2010

  • AUSIMM
    Stacking and Reclaiming Facilities at the Thiess Bros Pty Ltd, South Blackwater Coal Mine from Conception to Operation

    By R Hoskings

    Conceptual studies of the run of mine stockpiling and reclaiming requirements commenced in 1975. Final selection of equipment was made in 1978 and the equipment was commissioned in June, 1979. Equipm

    Jan 1, 1980