Search Documents

  • NIOSH
    OFR-17(2)-77 Conceptual Design Of An Automated Longwall Mining System - Phase II - State Of The Art Survey

    To develop a conceptual design for an automated longwall mining system, one should know what has been done, what is being done today and what is being planned for tomorrow. The bibliography referenced

    Jan 1, 1975

  • CIM
    Anaconda Mining Inc.’s Point Rousse Project Cyanide Destruction System Development Study

    By Neri Roux, Chris Budgell, Allan Cramm, Leo Cheung

    "Anaconda Mining Inc. is investigating potential improvements and expansions to their operating plant located on the Baie Verte Peninsula in Newfoundland. An extensive batch and continuous bench scale

    Jan 1, 2017

  • IIMP
    Planta de beneficio mixta: flotación-cianuración en la mina Calpa

    Ante la baja recuperación del oro encontrado en la mina Calpa, perteneciente al Consorcio Minero del Perú S.A, el objeto del presente texto señala los experimentos, conclusiones y recomendaciones que

    Jul 20, 1957

  • AUSIMM
    Greenland Group Deformation and the Structural Controls oif Gold Mineralisation Within the Reefton Goldfield: From the General Gordon to the Golden Lead

    Deposits of the Reefton Goldfield, West Coast, New Zealand, are hosted on N-NE striking, upright folds of the Greenland Group. High-grade quartz lodes are hosted on axial planar shears, typically have

    Jan 1, 2001

  • NIOSH
    IC 9433 Backfilling Materials And Methods For Stress Transfer Modification In Deep Longwall Coal Mines

    By Charles V. Jude

    This U.S. Bureau of Mines report presents a review and evaluation of existing and new backfilling materials and methods for their applicability to the problem of gate road stress reduction in deep ret

    Jan 1, 1995

  • SAIMM
    Cracking A Hard Nut: An Overview Of Lonmin?s Operations Directed At Smelting Of UG2-Rich Concentrate Blends

    Keywords: Pyrometallurgy, furnace, Lonmin, platinum, PGM, UG2 Lonmin, earlier than any other primary platinum producer, had to deal with the concentrating and smelting of UG2-rich ores and concent

    Jan 1, 2011

  • NIOSH
  • NIOSH
    IC 7173 Technical Research By The Bureau Of Mines In Oil And Gas Production, Refining, And Utilization ? Introduction

    By H. C. Miller

    Several agencies of the Federal Government are engaged in research and fact finding relative to petroleum and natural gas, and others are concerned with carrying out the provisions of specific laws th

    Jan 1, 1941

  • SME
    The Modular Python Processing Plant ? Designed For Underground Preconcentration

    By T. R. Hughes

    How do you fit a processing plant underground with minimal change to mine infrastructure and yet maintain economic recovery, operability and maintainability? By combining fine crushing, continuous-gra

    Jan 1, 2010

  • IIMP
    Mecanización en mediana minería ¿Una necesidad?. El sistema de minería sin rieles en la mina Hércules

    By Carlos España Ch

    El presente texto plantea la mecanización en la mediana minería como método de trabajo para el tratamiento de minerales y trabajos auxiliares. La ejecución de esta mecanización es de acuerdo al tipo d

    Oct 14, 1980

  • SME
    The Evolution Of Drill Bit And Chuck Isolators To Reduce Roof Bolting Machine Drilling Noise

    By R. Michael

    Among underground coal miners, hearing loss remains one of the most common occupational illnesses. In response, the National Institute for Occupational Safety and Health (NIOSH) conducts research to r

    Jan 1, 2010

  • AIME
    The Preparation Of Brown Iron-Ores.

    By H. S. Geismer

    INTRODUCTION. THERE are three general methods available for obtaining commercial brown iron-ore : hand-screening; washing; and washing and concentrating. Hand-screening has produced a large tonnage

    Aug 1, 1911

  • CIM
    Amulet Flotation Mill Practice

    By W. G. Hubler

    It has been within only the last two or three years that enough progress has been made in preferential flotation to warrant metallurgists in recommending the installation of commercial-sized plants fo

    Jan 1, 1931

  • AIME
    Boston Paper - The Russell Process in its Practical Application and Economic Results. Compiled from Mr. Russell's Notes

    By Ellsworth Daggett

    In the first paper on the Russell process presented by Mr. Stetefeldt, in May, 1884 (Transactions, xiii.), the process was treated from a purely theoretical standpoint.. 111 his second paper of Octobe

    Jan 1, 1888

  • SME
    Putting Computational Fluid Dynamics To Work On Mining And Metals Projects

    By D. M. Lane, J. M. Berkoe

    Engineers and Owners share a common desire to build reliable, efficient plants on schedule at reasonable costs. This paper describes one tool that Bechtel finds can integrate these objectives by “pu

    Jan 1, 2000

  • SME
    Second Avenue Subway—Tunneling Beneath Manhattan

    By Geoffrey Fosbrook, Donald Phillips, Anil Parikh

    The Second Avenue Subway is a $16.8 billion project planned by the Metropolitan Transportation Authority (MTA) in New York City. It will reduce overcrowding and delays on the Lexington Avenue Line, im

    Jan 1, 2005

  • CIM
    Shaft Sinking at Rouyn Merger Gold Mine

    By L. J. Cunningham

    Introduction The property of Rouyn Merger Gold Mines, Limited, is in Rouyn and Joannès townships, Western Quebec, seven miles east of the town of Rouyn. Traversing it is the east-west trending Cadi

    Jan 1, 1948

  • CIM
    Balmer's in-pit coal conveyor: Improving haulage efficiency

    By C. H. van Eendenburg

    "Installation of a 3.6 km long raw coal conveyor in the Balmer open pit was undertaken to improve over-all haulage efficiency. This paper covers the rationale behind this project, system design and co

    Jan 1, 1990

  • AUSIMM
    Mining Ventures and Environmental Changes

    A consideration of mining ventures and the changes of an environmental nature that occur. The paper is introduced with a general statement claiming recognition that mining ventures are important to hu

    Jan 1, 1981

  • AUSIMM
    Performance of the Coal Mine Openings and Pillars in Anisotropic Stress Field

    The stability of parallel underground coal mine galleries and pillars have been investigated using two- and three-dimensional (3D) numerical stress analysis. Anisotropic horizontal in situ stresses an

    Dec 6, 2010