Search Documents

  • AUSIMM
    Land Rehabilitation at Golden Cross, Eight Years After Mine Closure

    By D Crequer

    Land rehabilitation at Golden Cross is reviewed, 8 years after mine closure in 1997/98, from the perspectives of a Peer Reviewer (land rehabilitation) and a Regional Council Officer (Resource Consents

    Jan 1, 2006

  • DFI
    Wanapum Dam Repaired Using Post-Tensioning Anchors

    By Rick Deschamps, Brian Barkauskas, Aled Hughes, Abigail Stein

    In central Washington, six miles south of the small town of Vantage, the flow of the Columbia River is harnessed by the Wanapum Dam which is part of the Priest Rapids Hydroelectric Project owned and o

    Jan 1, 2018

  • SME
    Evaluation of Post-blast Re-entry Times Based on Gas Monitoring of Return Air Mining, Metallurgy and Exploration

    By L. Yuan, J. H. Rowland, D. Bahrami, R. Thomas

    Blasting is the main method of production in many non-coal underground mining operations and produces multiple toxic gases as a result. The Mine Safety and Health Administration (MSHA) requires mine o

  • NIOSH
    RI 3946 Exploration of Bishop Cap Fluorspar Project Don Ana, N. Mex.

    By Forest J. Sur

    "This report describes an exploratory project conducted by the Bureau of Mines on a fluorite deposit near Vado, N. Mex. Results of trenching are given. Together with analyses made upon samples of the

    Sep 1, 1946

  • AUSIMM
    The Kulumadau Epithermal Breccia-hosted Gold Deposit, Woodlark Island, Papua New Guinea

    By L Spencer, H Zwingmann, I Graham, D Cendon, B Kelly, D Burkett, F Lau, P Lennox

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Kulumadau deposit represents an intermediate-sulfidation epithermal gold deposit (3.8 M

    Mar 18, 2015

  • CIM
    Application Practice of Bottom Blowing Continuous Converting to Replace Copper P-S Converter

    By Hongfei Li, JianLong Wang

    This paper introduces the technical characteristics, transformation scheme and production practice of the project in which Copper P-S Converter was replaced by Bottom Blowing Continuous converting for

    Jan 1, 2019

  • DFI
    Settlement Of Tall Buildings Supported On Deep Foundations In Southeast Florida, USA

    By Rudolph P. Frizzi

    This paper presents different deep foundation systems and associated settlement records for high-rise building projects in the coastal areas of southeastern Florida. An introduction to the sedimentary

    Jan 1, 2003

  • AUSIMM
    Physical and Mechanical Characterisation of Paste Backfill by Laboratory and In-Situ Testing (6467738c-7044-43a0-9a73-ca12bdc18202)

    By Bidwell TJ, Servant S

    Paste back-fill technology is gaining rapid acceptance in the Canadian mining industry. The authors were able to work on four different mining sites employing paste technology in their operation. In

    Jan 1, 1998

  • NIOSH
    RI 6145 Low-Temperature Phase Equilibria Of Helium-Bearing Natural Gases: Hansford Gas

    By Lowell Stroud

    This report is the third in a series presenting equilibrium vapor-liquid data for helium-bearing natural gases. The first two reports contained phase data for the gases processed for helium at the Bur

    Jan 1, 1963

  • NIOSH
    IC 8138 Review Of Major Proposed Processes For Recovering Manganese From United States Resources (In Three Parts) 1. Pyrometallurgical Processes

    By Lindsay D. Norman

    Eleven major pyrometallurgical processes and operations suggested for recovering manganese from domestic resources are described. These include seven pyrometallurgical processes that usually yield a f

    Jan 1, 1962

  • NIOSH
    Bulletin 104 Extraction and Recovery of Radium, Uranium and Vanadium from Carnotite

    By Charles L. Parsons, R. B. Moore, S. C. Lind, O. C. SCHAEFER

    Early in 1912, from information received by the Bureau of Mines, it became evident that quantities of valuable radium-bearing ore from Colorado were being exported for manufacture in foreign coun- tri

    Jan 1, 1915

  • NIOSH
    OFR-40(1)-81 Coal Mine Equipment Population Characterization And Protective Structure Status - Volume I

    By Gary R. Gavan

    This report presents the results of a research project that gathered detailed information on the composition of the population of mobile equipment used in U.S. coal mines. A computerized data bank con

    Jan 1, 1978

  • SAIMM
    Shaft Sinking Scheduling/Planning - Introduction (545beb62-d4f4-42b2-aefa-514c1419aba6)

    By P. N. Lategan

    Mining companies are challenged with increased difficulty in delivering capital projects on schedule and within budget. In 2005, PricewaterhouseCoopers global review of major capital projects in the m

    Jan 1, 2009

  • DFI
    Analysis of Plugging Effect for Open-Ended Piles in Sandy Soil

    By Sangseom Jeong, Moonkyung Chung, Junyoung Ko

    "Abstract The plugging effect of open-ended piles in sandy soil is analyzed by full-scale field test and plugging measurement. PLR (plug length ratio) measurement data from 144 field cases are analyze

    Jan 1, 2014

  • SME
    New Developments In Underground Mining Machinery

    By John H. Clark

    This paper outlines new technological improvements in underground trackless equipment for the metal mining industry with emphasis on maintenance related developments for Load Haul Dump machines. Also

    Jan 1, 1983

  • CIM
    The Benson Lake Mine - Operating Practice

    By J. D. Wilkins

    "Ore outcrops were first discovered in the area in 1911. Following various periods of exploration by private interests and Cominco Limited, the Coast Copper Company, Limited property was brought into

    Jan 1, 1971

  • SME
    Construction of the Plymouth Tunnel by SEM Based on a Permanent Shotcrete Liner for The Purple Line Project in Maryland: A Case Study - RETC2021

    By Nicholas Tabor, Norbert Fuegenschuh, Richard Taylor, Jean-Marc Wehrli

    The Plymouth Tunnel forms part of the 16-mile long route of the Purple Line Light Rail Project promoted by the Maryland Transit Administration. The tunnel is approximately 1,220 feet in length with a

    Jun 13, 2021

  • ISEE
    Expanded Rock Blast Modeling Capabilities of DMC_Blast, Including Buffer Blasting

    By Dale S. Preece, J Paul Tidman, Stephen H. Chung

    "A discrete element computer program named DMC-BLAST (Distinct Motion code) has been under. development since 1987 for modeling rock blasting (Preece & Taylor, 1989). This program employsexplicit time

    Jan 1, 1997

  • NIOSH
    RI 6126 Use Of A Large-Diameter Reactor In Synthesizing Pipeline Gas And Gasoline By The Hot-Gas-Recycle Process

    By A. J. Forney

    The hot-gas-recycle process, for the hydrogenation of carbon monoxide, was investigated in a 12-inch-diameter reactor. Initially because the distribution of gas was poor, hotspots developed in the cat

    Jan 1, 1962

  • DFI
    The Challenges Of Construction In Karstic Limestone: Three Major Case Histories

    By Donald A. Bruce

    The construction of major structures in karstic limestone terrains poses difficult problems to designer and contractor alike. This reflects the inherent variability of such conditions, and also the si

    Jan 1, 2002