Search Documents

  • NIOSH
    OFR-79-82 Bound Liquid Ion Exchange Membranes For The Extraction Of Cobalt From Lateritic Leach Solutions

    By Larry D. Nichols

    Poroplastic membranes containing ion exchange liquids were studied for separating cobalt from nickel-containing solutions similar to ammoniacal laterite leaches. The driving force for cobalt transport

    Jan 1, 1982

  • IOM3
    Strata-bound pyritic copper mineralization on a fore-arc setting in northwestern India: a Proterozoic Besshi-type deposit

    By A. D. Mukherjee, H. N. Bhattacharya

    Middle Proterozoic sulphide ore mineralisation occurs in isolated blocks of the NE-SW trending Delhi fold belt composed of Delhi Supergroup rocks. The Ajari-Basantgarh-Pipela belt forms part of the lo

    Jun 19, 1905

  • SME
    Summersville Raw Water Intake

    By Douglas Banks

    Construction for the new 2.5 MGPD raw water intake project commenced December 2002. The project, initially designed as a 12' Ø concrete lined intake shaft,145' deep, with two offset 24" lake

    Jan 1, 2005

  • AIME
    Mining Geologist's Service to the Mineral Industry

    By Reno H. Sales

    Since leaving school my efforts have been geared to the task of making geology useful to the mining industry. The responsibility of the economic geologist or mining geologist of today has grown to be

    Jan 1, 1942

  • AIME
    Mining Geologist's Service to the Mineral Industry

    By Sales, Reno

    Since leaving school my efforts have been geared to the task of making geology useful to the mining industry. The responsibility of the economic geologist or mining geologist of today has grown to be

    Jan 1, 1942

  • CIM
    The Submarine Coalfield of Sydney, N.S.

    By Sydney C. Mifflen

    COAL MINING, with its some 15,000 employees, is directly responsible for the livelihood of one-fifth of the population of the Province of Nova Scotia and indirectly so for that of possibly another fif

    Jan 1, 1941

  • TMS
    Characterization of Refractories in Gasification Systems Using Post Mortem Analysis and Thermodynamics

    By Kwong. Kyei-Sing

    Gasification is a process that converts a carbon feedstock into synthesis gas (CO+H2). Slagging gasifiers operate at high temperature and pressure and in a corrosive-wear environment from the slag. Cr

    Jan 1, 2010

  • ISEE
    Underwater Blasting: A Summary

    By Joshua Taylor Drake

    This report answers specific questions concerning underwater blasting considerations, and blasting safety. The blasting considerations discussed consist of basic blasting principles, and new variables

    Jan 1, 2015

  • SME
    Technical Note - SO2 abatement in a 440-kW pilot-scale combustor —limestone injection tests

    By G. H. Lewis, C. L. Krcil, N. S. Harding, D. E. Havekotte

    Introduction Limestone injection work was completed in a 440-kW (1.5-million Btu per hour) pilot-scale combustor in preparation for a 50,000-kg/h (110,000-lb per hour) industrial steam boiler limes

    Jan 12, 1986

  • AUSIMM
    Pipe Flow Stability of Concentrated Coal-Water Suspensions in the Presence of an Electric Field

    Pipe Flow Stability of Concentrated Coal-Water Suspensions in the Presence of an Electric Field

    Sep 13, 2010

  • SAIMM
    Underwind And Overwind Protection Systems With Enhanced Self-Sufficiency (030db833-15eb-45bc-a368-bd664b61eafa)

    By N. D. L. Burger

    Underwind and overwind protection system concepts for mine hoist shafts were developed in conjunction with and for the Safety in Mines Research Advisory Committee (SIMRAC). End-of-wind operation of mi

    Jan 1, 2004

  • SME
    Travelling In China

    By F. Habashi

    The changes that took place in China between 1984 and 2004 are remarkable. Visits were made to universities, research institutes, metallurgical industry, and many cultural centers within five trips du

    Jan 1, 2007

  • SAIMM
    Alternative Electrolyte Compositions For Aluminium Electrolysis

    By S. Rolseth, J. Thonstad

    The traditional electrolyte for aluminium electrolysis is based on molten cryolite (Na3AlF6), acting as solvent for the raw material, alumina (Al2O3). Over the years there has been a trend to increase

    Jan 1, 2004

  • SME
    Column Flotation Of Desliming Cyclone Overflow For The Riverside Coal Preparation Plant

    By S. K. Nicol

    The results of column flotation tests conducted on a bulk sample of ultrafines discarded from the fine coal desliming cyclones at the Riverside coal preparation plant of Theiss Dampier Mitsui Coal Lim

    Jan 1, 1987

  • CIM
    Changes in Hydro-Mechanical Monitoring Parameters During Construction of a Deep Geological Repository

    By A. K. Verma

    This paper provides a brief overview of evolution of deformations, stresses, and pore pressures due to different excavation stages during construction of an URL. Excavation of a rockmass develops a da

    Jun 1, 2012

  • AUSIMM
    Mount Morgan Practice in Recording and Estimating Ore Tonnages and Values

    THE irregularity of the Mount Morgan ore body presents problems other than those for mining only. For irregularity of outline is coupled with irregularity of grade, and the ore varies so rapidly from

    Jan 1, 1910

  • NIOSH
    IC 8174 Mining Methods And Costs, Deep Creek Zinc-Lead Mine, Goldfield Consolidated Mines Co., Stevens County, Wash.

    By Galen G. Waddell

    The Deep Creek zinc and lead mine afforded an excellent example of a relatively small underground mine operation that approached the low mining costs of large, highly mechanized mines, An open stope m

    Jan 1, 1963

  • SAIMM
    Developing a Mining Plan for Restarting the Operation at Uis Mine

    By J. H. Maritz, Uludag. S.

    "*Paper written on project work carried out in partial fulfilment of B.Eng(Mining Engineering) degreeAfriTin Mining Limited plans to reopen the Uis tin mine in Namibia and establish a pilot processing

    Jul 1, 2019

  • NIOSH
    IC 8182 Sandstone As Dimension Stone

    By Oliver Bowles

    Sandstone, a widely distributed siliceous sedimentary rock, is the third most popular building stone in the United States. It is formed by the breaking down of preexisting rocks by weathering, subsequ

    Jan 1, 1963

  • SAIMM
    Construction Of A Concrete Plug In South Deep?s Main Shaft To Seal Off A Major Water Intersection

    By M. F. Wells

    The method used to salvage South Deep?s Main Shaft after it was flooded by an inrush of water at about 450 m below collar on 1 May1996 is described. The individual techniques employed in the salvage w

    Jan 1, 1999