Search Documents

  • NIOSH
    OFR-99-75 Study Of Worker Acceptance And Attitudes Toward Mining Equipment Modifications

    By Maurice E. Bailey

    The purpose of this study is to determine worker acceptance of modified mine equipment at various intervals during a twelve month period. A survey instrument was administered to the workers by two exp

    Jan 1, 1975

  • CIM
    Maintenance management control through utilization of a computerized system at the Key Lake project

    By T. Warren, R. Pender

    "Significant strides have been made during the past decade to integrate the traditionally separate administrative functions of financial management, materials management and maintenance management.In

    Jan 1, 1990

  • AUSIMM
    A Study of Mine Subsidence at Two Collieries in the Southern Coalfield, New South Wales

    Urban development to the south of Sydney is approaching areas of current and proposed coal mining. Already some structures and residential areas are affected by mining subsidence.Subsidence resulting

    Jan 1, 1980

  • ISEE
    Journal: Junction Chamber Blasting November 22,1999

    By Edward Walter

    Rock excavation for tunneling projects occurs on a regular basis in the Cleveland area. These tunnels are being constructed to increase the capacity of the sanitary sewer system. Controlled blasting m

    Jan 1, 2001

  • AIME
    Methods of Increasing Gas Penetration Through Sinter Layers

    By Johannes Moeljono, Werner Wenzel, Heinrich Wilhelm Gudenhau

    As an important mechanism for increasing production of the suction-draft-sinter process, it has been shown that gas permeability through the sinter layer plays an important role. Methods to increase p

    Jan 1, 1974

  • SME
    Support Of The Leipzig City—Tunnel Extension Using A Tie-Back Supported Freeze Wall

    By Helmut Hass, Michael B. Gilbert

    The extension of the commuter railway system (S-Bahn) in Leipzig, Germany willrequire the construction of an underground line crossing the downtown area of thecity to tie the Bavarian Station in the S

    Jan 1, 2007

  • SAIMM
    The interaction of rock mass properties and the project specific boundary conditions as basis for the design of deep excavation pits

    By R. Katzenbach, M. Vogler, U. Adamietz

    Abstract The design of deep excavation pits in rock mass is dependent as well on the mechanical properties of the rock mass as for example the orientation and the type of discontinuities like bed

    Jan 1, 2003

  • NIOSH
    Demonstration Of Remote Mine Seal Construction

    By M. A. Trevits, T. A. Gray, L. M. Crayne, P. Glogowski

    Mine seals can he remotely constructed in underground coal mines through vertical boreholes when direct access to a fire is impossible or considered to he too dangerous. This method has great merit be

  • SME
    The Menominee Iron District

    By Alexander N. Winchell

    "Location: The Menominee district has been described geologically in several units, because the known iron-bearing formations of the larger region are not a really connected. From the commercial and m

    Jan 1, 1920

  • AIME
    Extra-Mural Service, Engineering Societies Library

    IN the extra-mural service being built up by the Engineer-ing Societies Library as its finances permit, an occasional large total charge is incurred for exceptionally protracted services. A western st

    Jan 3, 1928

  • CIM
    Coarse Gold Recovery Using Flotation in a Fluidized Bed

    By Eric Bain Wasmund, Lance Christodoulou, Julio Jairo Carmona Franco, María Fernanda Castillo, Jose Concha

    "A number of technologies are in practice for selectively removing coarse gold from conventional grinding circuits. These circuits are often designed so that the grinding mill output is size classifie

    Jan 1, 2015

  • AUSIMM
    Good Delay Timing-Prerequisite of Efficient Bench Blasts

    Variations in delay timing can have a marked influence on blasting effectiveness and, hence, on total production costs. In single-row bench blasts, delay firing is invariably more effective than simul

    Jan 1, 1977

  • SME
    Extensible Conveyor Systems For Long Tunnels Without Intermediate Access

    By Dean Workman

    Long extensible conveyor systems are an important option for efficient tunnel excavation where intermediate access is impractical. The conveyor system designed for the Pula Subbaiah Veligonda Tunnel

  • SAIMM
    Precipitation Of Rhodium From A Copper Sulphate Leach Solution In The Selenium/Tellurium Removal Section Of Abase Metal Refinery ? Synopsis

    By C. Lottering

    Copper sulphate solutions are produced during the pressure leaching of first-stage leach residue in a typical base metal refinery process. Apart from impurities such as selenium and tellurium, this le

    Jan 1, 2012

  • NIOSH
    IC 7185 Inspection And Testing Of Mine-Type Electrical Equipment For Permissibility ? Introduction

    By L. C. IlsLey

    The theory and practice followed by the Bureau of ones in the investigation of electrical equipment4/ made for service in massy mines are of particular interest not only to manufacturers but also to t

    Jan 1, 1941

  • SME
    Microcomputers In The Mining Industry - A Case Study

    By Michael D. Loy

    This paper examines the computerization steps of United Coal Company of Bristol, Virginia. OVERVIEW Producing close to 7,000,000 tons per year, United Coal Company is one of the most interesti

    Jan 1, 1985

  • AUSIMM
    The Development of Brown Coal Char as a New Metallurgical Fuel

    By Kennedy G. L, Evans D. G

    The development of the carbonization of brown coal briquettes to produce a hard char suitable for use in place of imported hard coke has continued in Victoria, and an experimental carbonization plant

    Jan 1, 1960

  • NIOSH
    Design Parameters Of Roof Support Systems For Pre-Driven Longwall Recovery Rooms

    By T. M. Barczak, S. C. Tadolini

    Reduction in the recovery time required and improvements in safety during a longwall face move have compelled coal mine operators to examine and use pre-driven longwall recovery rooms. The recovery e

  • AUSIMM
    The 2,600 Feet Level Exploratory Drive North at North Broken Hill Limited

    CONTENTSIntroductionNorthern ExplorationDrive ConceptionGeneralDriving CrewDrive Cross Section and Track DetailsVentilation by Electrically Driven FanTemperatures and HumidityFan PerformanceRock Drill

    Jan 1, 1946

  • SME
    Major Issues In Subsidence Regulation

    By Gregory R. Gorrell

    The legal issues surrounding the regulation of subsidence are among the major concerns facing the underground mining industry today. Whether subsidence occurs almost immediately as a result of longwal

    Jan 1, 1986