Search Documents

  • DFI
    Installation Of Augerpiles In Low Headroom And Restricted Access Conditions

    By Jim Steding

    L.G. Barcus and Sons, Inc. recently completed a three-phase project for the expansion of Presbyterian Hospital in Albuquerque, New Mexico for McCarthy Construction Co., the Construction Manager for th

    Jan 1, 2003

  • SME-ICGCM
    Managing A New Technology - An Update Of The UK Rockbolting Story

    By L. R. Stace

    Arguably, one of the most significant technological breakthroughs that had been experienced during the period when British Coal was the major coalmine operating company in the UK, the use of rockbolts

    Jan 1, 1996

  • NIOSH
    RI 4593 Investig. of Magnet Cove Rutile Deposit, Hot Springs Co. Ark

    By Donald F. Reed

    In the latter half of 1948 the Bureau of Mines investigated the Magnet Cove Rutile Co.'s prerty in northern Hot Spring County, Ark. This work was supplemental to the work done by the Bureau on the sa

    Dec 1, 1949

  • AUSIMM
    Pilot Plant Testing in Mineral Process Plant Design

    By Dunlop GA

    Pilot Plant confirmatory testing of the treatment route developed in the Metallurgical Laboratory is an essential factor in the development of complex ore bodies. Objectives should be well defined t

    Jan 1, 1990

  • SAIMM
    SAIMM Base Metals Conference, Namibia, July 2007 - The Minerals Industry And Syndicated Research

    By P G. Gaylard

    The minerals Industry carries out over US$ 2 billion of R&D annually. The R&D is performed at three levels ? in house research facilities; on a one-on-one basis with a research provider; as syndicated

    Jan 1, 2007

  • SME
    De Beers, Sandvik Team Up On Underground Automation

    De Beers? Finsch diamond mine began operation in the 1960s as a surface project using the latest technology available. During the 1990s, the operation, located about 160 km (100 miles) west of Kimber

    Jan 1, 2008

  • SME
    Transporting A TBM Through A Large City On The East Side CSO Tunnel Project In Portland, OR

    By Niels Kofoed

    Upon completion of the 6,200 m (20,340 lineal ft; lft) North Tunnel drive for the Portland East Side Combined Sewer Overflow (CSO) Tunnel project in Portland, OR, the slurry tunnel boring machine (TBM

    Jan 1, 2011

  • IIMP
    Prospección, exploración y desarrollo del yacimiento de Cuajone

    By Oscar Concha

    El presente texto describe la exploración, geología, controles estructurales, mineralización y los tipos de alteración hidrotermal del yacimiento minero Cuajone, situado al sur de la Cordillera Occide

    Apr 26, 1999

  • SAIMM
    Service delivery strategy for mining systems

    By U. Kumar

    Product designed characteristics like reliability and maintainability affect maintenance cost, service performance, and therefore product support strategy must be defined during design stage in terms

    Jan 1, 2003

  • SME
    Design of Precast Segmental Tunnel Lining in a Design‑Build Environment - RETC2021

    By David Mast, Irwan Halim, Seung Han Kim

    Nowadays more infrastructure tunnel projects are procured using design-build method. In this environment, the Owner’s engineer would typically provide performance requirements for the design-builder,

    Jun 13, 2021

  • NIOSH
    OFR-164-82 Engineering Evaluation Of Radon Daughter Removal Techniques

    By Donald B. Lindsay

    This report presents the findings of an investigation into the characteristics of a number of techniques for cleaning ambient air with special emphasis on their applicability to the removal of the sho

    Jan 1, 1978

  • SAIMM
    The History And Development Of The Pyrometallurgical Processes At Evraz Highveld Steel & Vanadium ? Synopsis

    By W. S. Steinberg

    In 1963, the full-scale engineering study for the development of an iron, steel, and vanadium plant was initiated. This was the birth of Evraz Highveld and its process flow as it is known today. Highv

    Jan 1, 2011

  • NIOSH
    RI 7078 Investigation Of Flame Propagation Characteristics In Layered Gas Mixtures

    By Israel Liebman

    The Bureau of Mines conducted an investigation to determine those factors that are significant in affecting the velocity of flames propagating along the boundary separating gaseous fuel and air. In ad

    Jan 1, 1968

  • AIME
    Reservoir Engineering – General - New Single-Well Test for Determining Vertical Permeability

    By W. A. Burns

    Vertical flow is an important mechanism in many petroleum reservoirs. Yet no adequate method has heretofore been proposed for determining the in-situ vertical permeability in a reasonable length of ti

    Jan 1, 1970

  • NIOSH
    OFR-1-80 Underground Disposal Of Retorted Oil Shale For The Paraho Retorting Process

    By H. W. Earnest

    This report covers the results of a two-phase study to determine the feasibility of underground disposal of retorted oil shale. Two mining methods, chamber and pillar mining and sublevel stoping, were

    Jan 1, 1978

  • SME-ICGCM
    Failure mechanisms in ultra-close seam mining

    By Yingxin Zhou

    Virtually every coal seam in Appalachia will at some time be subject to multi-seam interaction (Wu et al, 1987). Many such problems result from seams which lie in close proximity or have split and lie

    Jan 1, 1989

  • CIM
    The Western Canada Sedimentary Basin Area

    "AbstractThe Sedimentary Basin area of Western Canada, which lies between the Precambrian Shield and the Cordilleran mountain area, covers approximately 800,000 square miles. Sediments ranging in age

    Jan 1, 1950

  • CIM
    Application of Mass Blast Principle for Stope Blasting in Deep Mines

    ?? Intro ?? Mass blast principle ?? LaRonde evolution toward mass blast ?? Overview ?? Mining method ?? Longitudinal ?? LaRonde evolution (2002 to today) ?? Drill and blast design ?? Consumpti

    Feb 1, 2008

  • CIM
    Rare Earth Metal Production Using Infinium Pure Oxygen Anodes™

    By Adam Powell, Matthew Earlam

    INFINIUM, Inc. is scaling up a new molten salt electrolysis process for producing rare earth metals. Instead of conventional carbon anodes, this process uses Pure Oxygen Anodes™ which employ a stabili

    Jan 1, 2014

  • NIOSH
    RI 9408 - Bending Fatigue Test 1 on a 2-Inch 6x25 Fiber Core Wire Rope

    By W. M. McKewan

    The U.S. Bureau of Mines has established a wire rope research laboratory to examine the factors that affect the life of wire rope. A 2-in-diameter 6x25 fiber core rope was degraded on a bending fatigu

    Jan 1, 2010