Search Documents

  • SME
    Application of Derrick high frequency fine screening technologies in Kelsey Jig zircon tailings recovery (DuPont, Starke, Florida)

    By C. P. Kelley, T. J. McKeon

    Several recent developments in fine screening technology have been implemented at the DuPont Starke, Florida plant allowing enhanced zircon recoveries while minimizing operator requirements and total

    Jan 1, 2005

  • NIOSH
    IC 9141 Diesels In Underground Mines - Proceedings: Bureau Of Mines Technology Transfer Seminar, Louisville, KY, April 21, 1987, And Denver, CO, April 23, 1987

    The goal of the Bureau of Mines diesel engine research program is to reduce exhaust emissions and minimize the risk of fires and explosions caused by the use of diesel- powered equipment in undergroun

    Jan 1, 1987

  • NIOSH
    MLA 7-83 - Mineral Investigation Of The Lost Creek Rare II Area (No. 5089), Shasta County, California ? Summary

    By Harry W. Campbell

    A Bureau of Mines investigation identified no mineral deposits in the Lost Creek RARE II area. Sand and gravel has been mined from alluvial flood plain deposits just outside the RARE II boundary. An o

    Jan 1, 1983

  • AIME
    Conveyor Vs Track Haulage

    By R. U. Jackson

    FACED with rising costs, the mining industry is looking to new methods and equipment to supply the relief necessary for profitable operation. Conveyor transportation is rapidly taking a superior posit

    Jan 1, 1952

  • SME
    Silicosis : An Ancient Malady in a Modern Setting

    By R. C. Burtan

    Long before recorded history, man began to dig into the earth's crust in a never ending search for useful materials. It is well known that more than half of the earth's crust is composed of

    Jan 7, 1984

  • SME
    Planning and Design of the A3 Hindhead Tunnel, Surrey, United Kingdom

    By Tom Ireland, Tony Rock

    The proposed 1.83km long twin bore A3 Hindhead road tunnel planned for contruction in 2008 is being delivered under a Highways Agency Early Contractor Involvement (ECI) contract. The proposed cons

    Jan 1, 2007

  • SME
    Cost value of High-angle conveying – 2011

    By Joseph A. Dos Santos

    "The subject of this writing was first published in 1998 with the emphasis on the hardware cost comparison. Other costs, such as the required land area and spatial volume, were mentioned but not empha

    Sep 1, 2016

  • NIOSH
    OFR-31-75 Dust Collecting System For Auger Head Miners In Low Coal - Objective

    By E. C. Foster

    The project objective of this contract is to design, develop, and demonstrate a dust collecting system for auger head miners, used in coal seams 40 inches or less in height, which will reduce respirab

    Jan 1, 1974

  • SAIMM
    Investigation of the geomechanical criteria for safe and efficient crown pillar extraction beneath stabilised rock rockfill at the Crusader Mine

    By J. Whitford

    The established crown pillar extraction method at Gold Fields Australia Ltd.’s Crusader Mine, leads to the significant dilution and poor recovery of ore due to caving of the overlying loose rockfill.

    Jan 1, 2003

  • IIMP
    Controles en la estabilidad de taludes en minas a cielo abierto

    By José S. Lazarte Delgado

    Debido a que la variación del ángulo del talud en un solo grado equivale a la remoción de varios millones de toneladas de material estéril, se ha previsto que el diseño de taludes debe ser explotado y

    Nov 20, 1978

  • ISEE
    A Hydrodynamics-Based Approach for Predicting the Blast Damage Zone in Drifting as Demonstrated using Concrete Block Data

    "Rock falls involving a relatively small amount of material are a leading cause ofinjuries in underground mines in the United States. A contributing factor is unwantedblast damage and over-break. A go

    Jan 1, 2009

  • SAIMM
    A stochastic simulation framework for truck and shovel selection and sizing in open pit mines

    By S. Frimpong, S. R. Dindarloo

    Material handling in open pit mining accounts for about 50% of production costs. The selection and deployment of efficient, safe, and economic loading and haulage systems is thus critical to the produ

    Jan 1, 2015

  • IOM3
    Nickeliferous sediments and sediment-associated nickel ores at Kambalda, Western Australia

    By H. L. Paterson, R. R. Keays, M. J. Donaldson, D. J. Boyack, M. F. Smith, J. J. Gresham

    "Albite-rich sedimentary rocks that contain abundant Fe sulphides occur in the lower portion of the ultramafic sequence at Kambalda and their broadly antipathetic relationship to most of the nickel or

    Jan 1, 1984

  • NIOSH
    RI 4937 Investigation Of Iron Sulfide Deposits In South-Central Aitkin County And Carlton County. Minn. ? Summary

    By James Pennington

    [The Mining and Metallurgical Divisions of the Bureau of Mines, Region V, conducted an investigation in 1950-51 of the iron sulfide deposits in Aitkin and Carlton Counties, Minn. Twelve diamond-core-d

    Jan 1, 1953

  • AUSIMM
    Real time LHD dispatch optimisation with ratio targets at Newcrest’s Cadia Valley Operations

    By S N. Donaldson, B L. Hollis, K Wynn, L Potts, M Evans

    A real-time load-haul-dump (LHD) dispatch optimisation tool has been deployed at Panel Cave 1 and Panel Cave 2 at Newcrest’s Cadia Valley Operations. The tool, known as ORB, is the first known success

    Mar 15, 2021

  • AUSIMM
    Technology of Electrolytic Reduction of Alumina by the Hall-Heroult Process: I. A Voltage Analysis Under Conditions of Varying Alumina Concentration

    Experimental results are presented for the anode overvoltage as a function of current density for different alumina concentrations in an alumina reduction cell. Voltage changes due to the electrolyte

    Jan 1, 1965

  • CIM
    A Geomorphic Approach for the Design of Drainage Systems on Reclaimed Mine Areas

    By Anil K. Beersing

    Effective drainage systems are required for reclamation of mine-disturbed areas to control surface water runoff and avoid excessive erosion. For the conventional structural design approach, armouring

    Apr 1, 2005

  • AUSIMM
    Simplifying the Ore Handling System through the Use of Current Technology at Chuquicamata Underground Mine Project

    By P Paredes, T Leaño, D Gajardo, C Tramón, S Peñaloza

    The definition of an ore handling system and its consequent layout design is of crucial importance in cave mining projects. It not only represents the main driver in the production capacity and reliab

    May 9, 2016

  • SME
    Solid Cast Polymer Tunnel Segments: The Corrosion Resistant Solution for Sanitary Sewer Tunnels

    By Richard A. Cubeta

    Precast concrete segments have been used in sanitary sewer tunnel design for decades. Federal mandates (reduction in heavy metals and I & I), and system design changes (increased retention times) and

    Jan 1, 2008

  • SAIMM
    Preliminary assessment of rockfall hazard based on GIS data

    By V. Labiouse, M. Jaboyedoff

    GIS documents are of great interest for a quick and low-cost determination of areas endangered by rockfalls. They allow (i) the detection of potential instabilities from steep slopes and cliff areas,

    Jan 1, 2003