Construction of High Road Embankment over Thick Soft Silty Clay- A Case StudyBy R. Radhakrishnan, C. Gunasekaran
"Calicut Bypass Phase-II project included construction of 7 m high embankment over soft compressible clays up to 18 m in thickness. Approx 1.5 km length of road out of a total 5 km length consisted of
Jan 1, 2015
-
Construction of I-90 Highway Tunnels Under Boston’s South Station Rail Yard by Box JackingBy Peter van Dijk, Gary Almeraris, Philip Rice
This paper describes the Contractor’s value engineering design and the construction of the Interstate I-90 highway tunnel sections under the South Station railroad yard in Boston, MA for the Central A
Jan 1, 2001
-
Construction of Large Drilled Shafts the 2nd Annual Mike O'neill LectureBy Dan Brown
Improvements in construction equipment and techniques in recent years have made possible the use of drilled shaft foundations in diameters and lengths not previously considered practical or feasible.
May 11, 2007
-
Construction Of Large Drilled Shafts The 2nd Annual Mike O?Neill LectureBy Dan Brown
Improvements in construction equipment and techniques in recent years have made possible the use of drilled shaft foundations in diameters and lengths not previously considered practical or feasible.
Jan 1, 2013
-
Construction Of Large Underground Openings And Use Of Grouts ? SynopsisBy E. Mongilardi
The construction of large underground openings through cohesionless or weak cohesive soils and under the water table in particular, often requires a ground improvement to be done from the surface or a
Jan 1, 2010
-
Construction Of Long Tubular Column Foundations Under Deep Water ? SynopsisBy C. L. Liao
The chief experiences for constructing deep tubular columns foundation under deep water are as follows: 1. P.C. tubular columns were sunk inside the caisson. 2. P.O. tubular columns of 3.6 M. diameter
Jan 1, 2010
-
Construction Of Longueuil "Centre" 4.0 M Diameter Interceptor In The Montreal AreaBy Rudy Scarabelli, John R. Wagner
At one time explosives were the only economical means of rock tunnel excavation. Except in relatively long tunnels in the right rock explosives are still the cheapest means of rock excavation where th
Jan 1, 1987
-
Construction Of Louisville Water Company?s Riverbank Filtration Tunnel And Pump Station ProjectBy S. Holtermann
Through the process of Riverbank Filtration (RBF), the Louisville Water Company plans to obtain a higher quality source of water for their B.E. Payne Water Treatment Plant (WTP) by means of four colle
-
Construction of Nine Shafts for the Manhattan Section of the New York City Water Tunnel No. 3By Yifan Ding, Shemek Oginski, Patrick Finn
The Manhattan section of the New York Water Tunnel No. 3 constructed by the Schiavone/Shea/Frontier-Kemper Joint Venture is a $668 million project. The contract includes a tunnel drive of 8.85 km (29,
Jan 1, 2007
-
Construction of Oroville Dam - A Material Handling ChallengeBy Robert Walker
The win theme of this session is Unique Material Handing Systems. The theme was selected because of two major factors. 1. Accomplishments of unique character manage to attract interest regardless o
Jan 1, 1970
-
Construction of Ottawa’s Combined Sewage Storage Tunnel (CSST) - RETC2021By Alejandro Sanz Garrote, Juergen Laubbichler, Fernando Triana Gracian, Paz Navarro Gancedo-Rodriguez, Andreas Feiersinger
The Combined Sewage Storage Tunnel (CSST) is part of the Ottawa River Action Plan and will greatly reduce the frequency of sewage overflows into the Ottawa River during storms. The project consists of
Jun 13, 2021
-
Construction Of Pacific Gas And Electric Company's Kerckhoff-2 Underground Hydro-Electric Project 1980-1983By Earl M. Woodward
INTRODUCTION Kerckhoff-2 is a 140 MW underground hydro-electric project designed and owned by Pacific Gas and Electric Company and constructed between May, 1980 and May, 1983 by Auburn Constructors
Jan 1, 1983
-
Construction Of Permanent Intruded Plugs At South Deep Gold MineBy D. A. Bruce
The paper describes the construction of 5 plugs to resist high water heads at depth within the South Deep Gold Mine, Randfontein, South Africa. A total of 20 segments were involved to create these plu
Jan 1, 2006
-
Construction Of Pile Foundation For Railway ViaductsBy M. D. Khattar
The paper describes the salient construction features of the Pile foundation work for the Railway viaducts in Algeria. Six viaducts were constructed for execution of the Railway line between Aintemouc
Jan 1, 1989
-
Construction of Portals for Adits at Stillwater Mining Company’s East Boulder ProjectBy Hendrick A. D. Kirsten, A. Clayr Alexander
Stillwater Mining Company is currently developing a second underground palladium and platinum mine approximately 21 km (13 miles) west of their existing Nye operation in the Bear tooth Mountains of so
Jan 1, 2001
-
Construction of prime coking coal washeries in IndiaBy Bali. D. D., S. Chattopadhyay
"The planning and construction of prime coking coal beneficiation plants in the nationalized mines in India are reviewed. Flow schemes, construction practice, materials consumption, and costs are deta
Jan 1, 1986
-
Construction of Reinforced Concrete Chimney at Yallourn Briquetting WorksThe principal dirnensions of the chimney were fixed as follows: Height from formation to coping, 328 ft. 8 in.; inside diameter concrete shell, 13 ft. Gin.; inside diameter of the 4~-in. brick lining.
Jan 1, 1924
-
Construction of Sherritt's ConcentratorsBy J. A. MacLellan
"CONSTRUCI'ION OF SHERRITT'S CONCENTRATORSSherritt Gordon is operating two mills north of the 56th parallel, and is presently engaged in building a third. The author was closely involved in the design
Jan 1, 1972
-
Construction Of Shin-Kanmon Tunnel On Sanyo ShinkansenBy Kazuo Magata, Hirohiko Fujita, Masazumi Tashiro, Yoshiaki Sato, Yoshio Shinoda
The Shinkansen of the Japanese National Railways (JNR) presently in operation between Tokyo and Hakata, approximately 1,000 km, was constructed at three stages: between Tokyo and Shin-Osaka opening in
Jan 1, 1976
-
Construction of TBM-Mined Segments of the Sister Grove Outfall Pipeline - RETC2023By Ricky Chipka, Roshan Thapa, Richard Yovichin, Greg Rogoff, Patrick Niemuth
A 4.5-mile-long, 96-inch-diameter outfall pipeline was constructed between North Texas Municipal Water District’s proposed Sister Grove Regional Water Resource Recovery Facility and the Stiff Creek Di
Jun 13, 2023