Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Simulation of thermal effects on the flow field in a pilot-scale kiln

    By B. DANIEL MARJAVAARA, I. A. SOFIA LARSSON, ANNA-LENA LJUNG

    One way to upgrade iron ore is to process it into pellets. The pelletizing process is multifaceted, involving complex fluid dynamics with highly turbulent, high-temperature flow in intricate geometrie

  • SME
    Improvement on mathematical model for studying coal?s propensity for spontaneous combustion

    By Xingang Wang

    Spontaneous combustion is one of the most important safety issues in the global coal industry. It is considered to be a trigger for explosions in underground mines, especially for gassy mines. This th

    Jan 1, 2014

  • SME
    The Elk River MCHM spill; A case study on managing environmental risks

    By Meredith Scaggs, Emily Sarver, Lucas Rojas Mendoza

    "Early on Jan. 9, 2014, approximately 37,800 L (10,000 gal) of crude 4-methylcyclohexanemethanol (MCHM) leaked from a storage tank sitting on the bank of the Elk River near Charleston, WV (WVDEP, 2014

    Jan 1, 2014

  • SME
    Data Transport over Leaky Feeder Systems Using Internet-Protocol-Enabled Land Mobile Radios

    By C. Sunderman, R. Jacksha

    "Mine monitoring through various sensors is a vital component of successful miner safety and health programs. Data from environmental, geotechnical, infrastructure and other types of sensors are incre

    Dec 1, 2018

  • SME
    What happened to my gold? Questions to ask

    By C. Roos

    Traditionally within the mining industry, the main functional process flow for resource and reserve evaluation proceeds from geologists who build the geological model, to resource estimation geologist

    Jan 1, 2014

  • SME
    Is openpit production scheduling "easier" than its underground counterpart?

    By A. Newman, A. Brickey

    Although some of the prevalence of openpit production scheduling software can be explained by the predominance of openpit mining throughout the world, other factors have led to a lag in corresponding

    Jan 1, 2014

  • SME
    Is openpit production scheduling "easier" than its underground counterpart? (510581b7-6ca0-4114-a855-daf260fcdb74)

    By A. Newman, A. Brickey

    A pesar de que parte del predominio de software de programación de producción a cielo abierto se puede explicar por la preponderancia de la minería a cielo abierto en todo el mundo, hay otros factores

    Jan 1, 2014

  • SME
    What happened to my gold? Questions to ask (88fbd98e-c145-4e97-8580-5590d2b64813)

    By C. Roos

    Tradicionalmente en la industria minera, el flujo principal del proceso funcional para la evaluación de recursos y reservas procede de geólogos que elaboran el modelo geológico, de allí a los geólogos

    Jan 1, 2014

  • SME
    Practical Semiautomatic Stope Design And Cutoff Grade Calculation Method

    An incremental-analysis-based stope design and cutoff grade calculation method was developed for an underground metal mine project. Traditional stope design methods are typically very time consuming a

    Jan 1, 2012

  • SME
    A preliminary evaluation of a through-the-earth (TTE) communications system at an underground coal mine in eastern Kentucky

    By E.C. Jong

    Resumen ¦ Un sistema de comunicaciones “a través del suelo” (TTE) comercial y disponible fue evaluado en una mina de carbón subterránea en la zona Este del Estado de Kentucky. Este estudio de campo fu

    Apr 1, 2016

  • SME
    Residual diesel range organics in process waters from laboratory fine coal flotation tests (7edfe308-966e-40bd-b7f1-bfecd1e71bed)

    By J. Morris, R. Sellaro

    El petrodiesel es un colector común para la flotación de carbón, pero la partición de compuestos orgánicos de diesel (DRO por sus siglas en inglés) en corrientes de proceso no ha sido ampliamente estu

    Jan 1, 2014

  • SME
    A preliminary evaluation of a through-the-earth (TTE) communications system at an underground coal mine in eastern Kentucky

    "A commercially available through-the-earth (TTE) communications system was evaluated at an underground coal mine in eastern Kentucky. This field study was conducted as part of a larger multisite eval

    Apr 1, 2016

  • SME
    Residual diesel range organics in process waters from laboratory fine coal flotation tests (cf0c922c-3ef1-4110-a5ac-c4a4d4e8705b)

    By J. Morris, R. Sellaro

    Petro-diesel is a common collector for coal flotation, but the partitioning of diesel range organics (DROs) in process streams has not been widely studied. Preliminary research suggested that under no

    Jan 1, 2014

  • SME
    Nonlinear Finite Element Analysis Of Blade-Formation Interactions In Excavation

    By O. F. Brown

    Excavation and loading are primary operations in the surface mine production chain, constituting a significant component of production costs. This makes excavation and loading important cost centers t

    Jan 1, 2012

  • SME
    Refining Automated Modeling Of Operational Data By Identifying The Most Important Input Factors

    By Siddhartha Agarwal

    The mining industry collects a significant amount of operational data. However, gleaning useful information from the terabytes of data is difficult, and not just because of the sheer volume of the dat

    Jan 1, 2011

  • SME
    Geopolitics and the strategic risks to mining

    By Andrew C. Katen

    The mining industry faces increasing geopolitical risk in the coming decades. Constraints such as resource nationalism, corruption and social license could grow to outweigh fundamental limitations li

    Mar 1, 2014

  • SME
    Sustainable development; From environmental compliance to a shared value

    By The SME Sustainable Development Committee

    The evolution of sustainable development in mining is recognized as a key contributor to sustainable development (SD), which is defined as the ability of current generations to meet their needs withou

    May 1, 2013

  • SME
    A high-precision road network construction method based on deep learning for unmanned vehicles in openpit mines

    By Qinghua Gu, BUQING XUE, XUEXIAN LI, JIANGSHAN SONG, Qian Wang

    Updating the openpit vehicle transportation network has the problem of being time consuming and low precision. To address this problem, a high-precision road network model construction method for unma

  • SME
    Development, Testing and Proposed Application of Multiple Passive Source Tracers for Underground Mine Ventilation Systems (Mınıng engıneerıng FEBRUARY 2018)

    By E. Jong, E. Watkins

    "The application of passive tracer gas sources in underground mines is particularly useful for long-term tracer studies as well as for studies conducted in permissible areas of underground coal mines.

    Jan 2, 2018

  • SME
    Numerical analysis of the time-dependent behavior of immediate roof in a hypothetical one-entry mine

    By B. Mishra

    This paper presents a rock mechanics investigation of the time-dependent behavior of the rock immediately surrounding the excavation in a hypothetical one-entry coal mine based on the geology of the I

    Mar 1, 2014