Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Optimization of flotation plant performance using micro-price analysis

    By A. Noble

    "Froth flotation circuits are widely used throughout the mineral processing industry for the concentration of fine particles. It had been estimated that nearly 2 Gt (2.2 billion st) of ores are treate

    Feb 1, 2017

  • SME
    Numerical Modelling In Mining Geomechanics

    By A. J. Basu

    Geotechnical design plays a key role in mine design. I A proper geotechnical design provides a safe working environment and facilitates efficient mining operation. There are mainly three design approa

    Jan 1, 1996

  • SME
    Floor Bolting For Control Of Mine Floor Heave (fc60805a-0d80-4a84-b600-b1023fffe3cf)

    By J. C. Stankus

    Many coal seams are associated with soft floor strata and during mine development if coal pillars are not properly designed, floor heave occurs and causes interruption of coal production. In the sever

    Jan 1, 1993

  • SME
    Drone-based Applications For Tailings Dam Monitoring - SME Annual Meeting 2023

    By J. A. G. Llerena, J. Sattarvand

    Tailings dam failures have been occurring in recent years. They are considered more vulnerable than hydraulic dams due to the lack of regulations on specific design criteria, and stability requirement

    Feb 1, 2023

  • SME
    Bechtel’s Electrode Cap Limits Acid Mist in Electrowinning

    By J. A. Murray

    Maintaining satisfactory air quality in electrowinning tankhouses is problematic and costly, particularly as plant operating current densities have increased. Conventional approaches have not proved c

    Jan 1, 1996

  • SME
    Homestake Mining Company, Ruby Hill Mine: A Case Study On How To Streamline The NEPA Process During Mine Permitting Using Properly Designed And Executed Natural Resource Baseline Studies

    By C. L. Wilsey, K. M. Oakes, W. J. Reich, M. J. Protani

    The time frame required to complete the National Environmental Policy Act (NEPA) process for a new mine, or for the expansion of an existing mine, can range between 9 months to 24 months, or more. Th

    Jan 1, 2001

  • SME
    Making Iron Directly From Concentrate by Gaseous Reduction - Mining, Metallurgy & Exploration (2023)

    By H. Y. Sohn

    Considering the two most important issues the ironmaking industry faces today, i.e., energy consumption and greenhouse gas emissions, it would be advantageous to utilize the concentrate-size raw mater

    May 12, 2023

  • SME
    Underground Mining Systems and Equipment

    By Fred D. Wright, Stefan H. Boshkov

    12.1-BASIC AND PARAMETRIC CRITERIA IN THE SELECTION, DESIGN AND DEVELOPMENT OF UNDERGROUND MINING SYSTEMS STEFAN H. BOSHKOV AND FRED D. WRIGHT The criteria governing the selection of an undergro

    Jan 1, 1973

  • SME
    Development Of A Hydrometallurgical Path To Recovery Of Critical Materials From Spent Lithium Ion Battery Black Mass - SME Annual Meeting 2022

    By J. R. Klaehn, M. Shi, T. E. Lister, L. A. Diaz, J. S. McNally

    Since 2019, approximately two dozen international battery recycling companies have been operating at the commercial or pilot scale [1]. However, current process capacity does not exceed 100,000 tons o

    Mar 2, 2022

  • SME
    Global Mining: Priorities in a Politically Challenging World

    By James P. Cooney

    What is required for the mining industry to grow and prosper in a politically challenging world? The answer to this can be summarized as “the industry’s three priorities.” The first priority is g

    Jan 1, 1996

  • SME
    Three-Dimensional Modeling of Fugitive Dust Dispersion in Idealized Openpit Mines

    By K. V. Raj, T. Bhowmick

    "The control of fugitive dust in high-latitude openpit mines is challenging due to unique atmospheric phenomena resulting in complicated flow regimes as well as atmospheric inversion due to the lack o

    Jan 1, 2015

  • SME
    Mineralogical Characterization Of Products From A Smelting Reduction Ironmaking Pilot Plant

    By J. W. Cash

    The mineralogy and textures of cyclone dust, sludge, and occasional build-ups in the American Iron and Steel Institute (AISI) direct iron making pilot plant at Universal, Pennsylvania have been studie

    Jan 1, 1995

  • SME
    Upgrading Technical Skills In Developing Country Mines

    By R. Elias

    Botswana is a mining-dominated sub-Saharan country. Workforces are characterised by poorly educated operators and front line supervisors, with equipment and management to 1st World standards. Poor com

    Jan 1, 2000

  • SME
    Well Design For In-Situ Leaching

    By S. G. Axen

    Design of wells for in-situ leaching is based on individual mining operation and ore deposit requirements. Major design considerations are well flowrate, depth, fluid composition, expected well life,

    Jan 1, 1988

  • SME
    Comparison of Underground Coal and Trona Mine Seismicity

    By W. G. Pariseau

    "BACKGROUND Strata mechanics of three underground coal mines in central Utah were recently studied using a specialized finite element technique [1, 2, 3, 4]. The purpose of these studies was to examin

    Jan 1, 2017

  • SME
    Four Defining Dimensions of a Gold Company

    By Wayne W. Murdy

    Peru is a mineral hot spot in the world today. Newmont is in the exploratory phase of this mining cycle, a phase full of optimism and expectations. But exploration is high risk. There will be succes

    Jan 1, 1996

  • SME
    Case Study Of Efforts To Reduce Costs And Increase Production At A Mid-Sized International Mining Company

    By M. V. T. Da Silva, J. C. Harrison

    Eldorado Gold Corporation of Vancouver, B.C. owns and operates three gold mines. The São Bento underground gold mine in Minas Gerais State, Brazil produced 105,907 ounces in1997. The La Colorada and

    Jan 1, 1999

  • SME
    Computerized Critical Path Scheduling Of Longwall Moves

    By Dale K. Nash

    The authors have developed a com¬puter-assisted critical path planning and scheduling model to help reduce time required to move longwall mining units. The model includes time constraints and limited

    Jan 1, 1983

  • SME
    Jackleg drill injuries

    By C. C. Clark, D. J. Benton, J. B. Seymour, L. A. Martin

    "The U.S. National Institute for Occupational Safety and Health (NIOSH) is conducting research on jackleg use and related accidents in underground metal mines. This paper provides an analysis and over

    Aug 1, 2016

  • SME
    Extracting Value from Simulation Models: Feasibility Grade Control

    By M. E. Rossi

    This paper discusses the use of Conditional Simulation (CS) models to provide mill feed grade profiles for different time periods. The conventional approach of classifying block estimates as ore or wa

    Jan 1, 2019