Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Economic Geology ResearchBy Thomas W. Mitcham
A program of geological research in support of mineral exploration efforts is outlined. Specific goals are stated, approaches to accomplish their attainment are described, and the type of useful resul
Jan 1, 1968
-
A Quick Method For Making Initial Cost Estimates Of Slurry PipelinesBy E. J. Wasp
The transportation of mine products incurs a cost which can have a significant bearing on the competitive position of the manufactured product. Clearly, the engineer who is responsible for selecting a
Jan 1, 1969
-
Tunneling Success at Denver’s Platte to Park Hill Project is a Team EffortBy William Gleason
"The city of Denver, CO has experienced extreme growth in the past decade, with the population of the city topping more than 700,000 people in 2018. The current storm water drainage system was put in
Jan 9, 2018
-
Rehabilitation of an 1880s Limestone Block Tunnel Below an Active Railroad CorridorBy Anna Eleria, Joseph Welna, Jim Herber, Nathan Campeau
Constructed by stonemasons over 120 years ago, a portion of the Trout Brook Storm Sewer Interceptor (TBI) owned and operated by the Capitol Region Watershed District in Saint Paul, Minnesota, needed r
Jun 13, 2021
-
A Mathematical Model For A Refining Process Centromin's Plant Of Zinc ? IntroductionBy Diómedes Sarmiento
Centromin is a Mining Company owned by the peruvian government. It's considered as one of the major mining and metallurgical center in Latin America. The main operations of the Company are: Mi
Jan 1, 1979
-
Cost Competitively Design Elements At Pegasus' Zortman-Landusky Gold Operations - A Case HistoryBy Carson Rife, Michael L. Clark
INTRODUCTION Zortman Mining Inc. is a wholly owned subsidiary of Pegasus Gold Corporation of Spokane, Washington. Pegasus has been producing gold and silver from the Zortman and Landusky mines sin
Jan 1, 1987
-
Tunnels - The Owners' ProblemsBy T. J. Jr. Corwin
This paper will cover the problems confronting an owner when planning and estimating the cost of a proposed tunnel. Three factors are known: the length, size and the time allocated for the completion
Jan 1, 1974
-
Unique Umbilical Launch of a Slurry TBM in LA - RETC2023By Nick Karlin
Dragados USA is constructing the LA Effluent Outfall Tunnel, a 7-mile, 18 ft internal diameter effluent discharge tunnel, utilizing a 21.6 ft (6.585 m) Herrenknecht Mixshield TBM. This paper highlight
Jun 13, 2023
-
A Unified Rock Classification For Drilling And BoringBy G. V. Krishnan, L. Adler
A rock classification for drilling and boring is presented covering most equipment types and providing an estimation of the key parameters for operation, such as thrust and speed, and of performance s
Jan 1, 1983
-
Wall Movement Monitoring Using High-Resolution Target Movement Monitoring SystemBy S. Watkins, D. Apel, B. Gray, R. Moss
Currently, there are several techniques and technologies available which are used by mining industry in its attempts to remotely monitor the ground movements both at surface and underground mines. The
Jan 1, 2007
-
A New Model for Characterizing the Cobble and Boulder Fraction for Soft Ground TunnelingBy Glen Frank, David R. Chapman
Determining the number of boulders and cobbles that will be encountered in the tunnel envelope is one of the most difficult problems confronting the geotechnical engineer in the design of tunnels in g
Jan 1, 2005
-
A Review Of Pyrometallurgical Treatment Of Electronic ScrapBy S. A. Shuey, P. Taylor
The recycling of electronic waste (e-waste) tends to be a rather complex undertaking when considering the intimate bonding of materials in the average printed circuit board. The development of a recyc
Jan 1, 2004
-
Tailings Dam Performance From USCOLD Incident Survey Data (3f33a05f-8713-4bcd-8e50-5c9208622bdd)By C. Strachan
This paper presents an evaluation of tailings dam incidents from the 1994 USCOLD Tailings Dam Committee report. Comparisons are also made with water storage dam incidents from USCOLD reports and rece
Jan 1, 1999
-
Topsoil-Subsoil Requirements To Restore North Dakota Mined Land To Original Productivity (f9bf7e44-59cd-4926-aa63-755a7805e403)By J. F. Power
Returning the original soil material to the surface of smoothed mine spoils is n practical means of restoring agricultural productivity. Research has established that high-sodium spoils in North Dakot
Jan 1, 1978
-
Equilibrium Adsorption Studies Of Polysaccharides On Talc: The Effect Of Molecular Weight, Charge, And The Influence Of Metal CationsBy P. Harris, G. Groenmeyer, L. Parolis
The effect of molecular weight, charge and the presence of the cations Ca2+, Mg2+and K+ on the adsorption of carboxymethyl cellulose on pure talc obtained from Balmat, New York have been investigated.
Jan 1, 2004
-
A Field Assessment Of An SIUC Innovative Spray System For Continuous MinersBy Y. P. Chugh
During late 2010, a scientifically founded water spray system was developed for continuous miners (CM) (Patent Pending) that reduces respirable dust exposure for miner operator by about 30%. It includ
Jan 1, 2012
-
Installation Of 0.84 M (33 In) Cyclones On The Primary Grinding Circuit At Cyprus Sierrita CorporationBy L. N. Hill
The classifiers on the primary grinding circuit at Cyprus Sierrita have been upgraded from 0.66 m (26 in) diameter hydrocyclones to 0.84 m (33 in) diameter hydrocyclones. This has resulted in a 4.3 %
Jan 1, 1994
-
Discussion – Classification effects in wet ball milling circuits – by R. E. McIvor Technical Papers, MINING ENGINEERING, Vol. 40, No. 8 August 1988, pp. 815-820By K. Holmberg, D. Herriot
This paper by Mr Mclvor is yet another contribution to the eternal controversy surrounding the benefits, or otherwise, of high circulating loads in closed circuit grinding. Throughout the paper it is
Jan 1, 1989
-
Fog Mesh Studies For Fog RemovalBy A. Martikainen
Field tests concerning a fog mesh method for fog removal are discussed. The first tests were performed at the Pyhäsalmi Mine, Finland. As this study gave promising results, further studies were compl
Jan 1, 2007
-
Weeks Island Replacement FacilityBy William R. Nash
The scope of work for the fast track construction of the Weeks Island Replacement Facility, Weeks Island, Louisiana included the design and construction of two salt mines. Mine #1 - An interim undergr
Jan 1, 1987