Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Design and Construction of the Bored, Two-Pass Niagara Water Diversion Tunnel

    By Russel Delmar

    Construction of Ontario Power Generation?s 12.8-m diameter, 10.4-km long water diversion tunnel in Niagara Falls, Ontario, is underway. The tunnel is being excavated by means of a 14.44-m diameter ope

    Jan 1, 2008

  • SME
    Railroad Crossing by Microtunneling: MTBM Successfully Mines Side-by-Side Twin Tunnels Six Feet Below Railroad - West Elizabeth Avenue Storm Drainage Project, Linden, New Jersey

    By Keith Schaeffer

    This paper presents a history of the planning, engineering and construction completed for the railroad tunnel crossing part of the West Elizabeth Avenue Storm Drainage Project, undertaken to relieve f

    Jan 1, 2008

  • SME
    Henderson No. 2 Shaft -The Sinking And Equipping Of A Large Diameter Concrete Shaft

    By Allan G. Provost

    Shaft construction is assuming ever increasing importance when new mining enterprises are considered. The reasons for this increased emphasis is the much greater depths at which many new ore-bodies ar

    Jan 1, 1972

  • SME
    A New Gold Mill For Nevada - Introduction

    By Robert E. Baker

    Cortez Gold Mines, the United States' third largest primary producer of gold, commenced continuous operations on January 10, 1969. The decision to proceed to production was made in March of 1968

    Jan 1, 1969

  • SME
    A Review Of Environmental Monitoring Systems In Underground Mines

    By John N. Murphy

    The environmental status of underground mining operations is critical to the health and safety of the miners; particularly in a large mine, the multitude of interacting parameters that can favorably o

    Jan 1, 1977

  • SME
    Empowering Community Engagements: Knowledge and Sustainable Management of Critical Raw Materials - SME Annual Meeting 2025

    By Leena Suopajärvi, Karin Käär, Marcin Szumny, Jari Joutsenvaara, Md Ariful Islam, Helmut Mischo, Georg Meissner, Ossi Kotavaara, Catalina Vrabie

    This study outlines implemented tactics and results for community empowerment through participation in questionnaire surveys, educational programs, and discussion on sustainable sourcing from new crit

    Feb 1, 2025

  • SME
    The ABCs of Mine-to-Mill and Metal Price Cycles

    By T. BoBo

    "In the 1990’s metal prices were trending in a long term decline and the usual cost cutting exercises were adopted. Cuts to research and development made innovation difficult and the outlook was grim.

    Jan 1, 2017

  • SME
    Recovery of Valuable Elements from Chinese Coal By-Products

    By M. Fan, Z. Long

    "This paper presents some studies on recovering valuable elements from Chinese coal by-products, including coal combustion fly ash, stone coal ash, and coal flotation tailings. Both commercialized tec

    Jan 1, 2017

  • SME
    2022 MPD Student Poster Contest – Winning Abstracts

    By Qingqing Huang, Mohammad Rezaee

    The Mineral & Metallurgical Processing Division (MPD) of the Society for Mining, Metallurgy & Exploration held the 12th MPD Student Poster Contest on March 2, 2022, during the MINEXCHANGE 2022 SME Ann

    Nov 22, 2022

  • SME
    Hindsight Is 20/20?Reverse Engineering Tunnel Risk Analyses

    By Lee W. Abramson

    Performing risk analyses on tunnel projects has become common place and on many projects it is required from an owner or regulatory perspective. After the project is planned, designed and constructed,

  • SME
    Mining 1986

    By J. D. Morgan

    Introduction In 1986, the US economy passed the $4 trillion mark. However, the value of domestically processed materials of mineral origin fell slightly to $240 billion. The value of metals produced

    Jan 5, 1987

  • SME
    Successful Tunneling for Water Tunnel No. 3, New York City, New York

    By Thomas P. Kwiatkowski, Joginder S. Bhore, Christopher D. Orlandi, Jose Velez

    Three case histories of successful TBM tunneling for New York City Water Tunnel No. 3 are presented. The tunnels, costing about one billion dollars total, are the 5-milelong, 18'-11" OD Brooklyn

    Jan 1, 2007

  • SME
    Influence Of Nanoscale Roughness On Surface Wettability

    By S. C. Brown

    A number of studies have suggested that microscale asperities enhance bubble-particle attachment efficiency; however, in practice the roughening of particulate surfaces can also lead to a decrease in

    Jan 1, 2003

  • SME
    Tunneling in the Cooper Marl of Charleston, South Carolina

    By Michael J. Robison, Wojciech F. Klecan, Robert L. Horner

    Since 1928, nearly 64 km (40 mi) of tunnel have been excavated within the relatively soft Cooper Group, more commonly known as the “Cooper Marl,” for water supply and transporting wastewater in the Ch

    Jan 1, 2001

  • SME
    The Contribution of the on-line Coal Analysers to the Sustainability of Greek Lignite Mining Sector

    By M. Galetakis, C. Roumpos

    A sustainable coal industry needs to achieve a number objectives concerning mainly with superior utilisation of deposits and improved environmental performance. Modern quality control systems, which a

    Jan 1, 2005

  • SME
    Simulation Of The Industrial Separation Of Rare Earth Elements By Solvent Extraction

    By C. Bazin

    The separation of rare earth elements is a complex process that is industrially carried out using liquid/liquid extraction. Detailed flow sheets of solvent extraction plants for the separation of rar

    Feb 27, 2013

  • SME
    Optimization Of An Iron Ore Flotation System

    By M. E. Volin

    Reagent control for optimum concentrate yield was studied by laboratory batch flotation tests simulating the Groveland plant flotation circuit in which a rougher concentrate is cleaned twice. The reag

    Jan 1, 1965

  • SME
    EPB Tunneling in Canada

    By Laura McNally

    In 2006 McNally International Inc. in a Joint Venture partnership with Aecon Constructors was the successful bidder on two York Region Tunnel Projects: Bathurst Collector/Langstaff Trunk Sewers; and Y

    Jan 1, 2008

  • SME
    Maintenance Contract on Cat 785 Trucks Works Well at Round Mountain

    By J. B. Rasmussen

    As part of a purchase of a fleet of Caterpillar 785 trucks, Round Mountain Gold Corp., Cashman Equipment Co. and Caterpillar Inc. entered into a four-year contract for the major maintenance of the fle

    Jan 1, 1991

  • SME
    An Examination Of The Relationship Between WLM Exposure And Dose

    By V. A. Leach, J. R. Johnson

    The calculation of the dose to the bronchial epithelium, lungs and other body tissues from exposures to airborne radon and thoron daughters requires a knowledge of the pattern of deposition in the res

    Jan 1, 1981