Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Emergency Repairs to Beach Interceptor TunnelBy David Jurich, Joseph N. McDivitt
INTRODUCTION South Coast Water District (SCWD) operates the Beach Interceptor Sewer Tunnel(BIST) in South Laguna, Orange County, California between Monarch Beach and Aliso Beach (Figure 1). The 10,
Jan 1, 2007
-
Fractal Characteristics of Temporal-Spatial Distribution of Acoustic Emission during Coal BurstsBy Ting Ren, Lihai Tan, Alex Remennikov, Xiaohan Yang, Xueqiu He
"Due to recent coal bursts in Australian coalmines, research of coal bursts has attracted intensive interest from mining researchers and engineers worldwide. Previous research has shown that the sudde
Jan 1, 2019
-
The Interplay of Face Support Pressure and Soil Permeability on Face Stability in EPB TunnelingBy Dimitrios Litsas, Michael Kavvadas, Panagiotis Sitarenios
"The paper discusses the results of 3D finite element analyses to investigate the effect of face support pressure and soil permeability on face stability conditions in EPB tunnelling. Two main types o
Jan 1, 2016
-
The Genesis And Occurrence Of Tertiary Phosphorites In The Southeastern United States (af9093ee-f3c1-4dab-963a-088eb4b6b17b)By Michael E. Zellars
The distribution of phosphate in Pliocene-Miocene deposits of the Southeastern United States was controlled by the prevailing geologic setting. For each basin a unique set of conditions in terms of re
Jan 1, 1978
-
Evaluation of Large Tunnels in Poor Ground—Alternative Tunnel Concepts for the Transbay Downtown Rail Extension ProjectBy David Hopkins, Steve Klein, Bradford Townsend, Ed Sum, Derek Penrice
INTRODUCTION The Transbay-Caltrain Downtown Extension (DTX) Project involves the construction of an approximately 1.5-mile rail line that will extend Caltrain commuter service and the future Calif
Jan 1, 2007
-
Critical Review Of Numerical Stress Analysis Tools For Deep Coal Longwall Panels Under Strong Strata - Preprint 09-011By M. K. Larson
Proper employment of numerical stress analysis design tools is based on the demonstrated ability of a model to capture key elements of the geologic site model and accurately simulate how these element
Jan 1, 2009
-
Using An Integrated Model For Maintenance Strategy Selection Of Load-Haul-Dump EquipmentBy A. Yazadni-Chamzini
Maintenance strategy selection plays a significant role in mining design. The nature of maintenance strategy selection is a complex multi-criteria decision making (MCDM) problem including both tangibl
Jan 1, 2012
-
Workshop Attendees Compare Ore Modeling and Mine Planning Software SystemsBy Betty Gibbs
The Ore Body Modeling and Mine Planning Worshop, sponsored by the Society for Mining, Metallurgy, and Exploration, Inc. (SME), was held Feb. 22-24, 1991 before the SME Annual Meeting and Exhibit in De
Jan 1, 1991
-
The Crossrail ExperienceBy Bill Tucker, Mike Black
"PROJECT OVERVIEW Crossrail, Europe’s largest construction project, will increase London’s transportation capacity by 10% when it opens in 2018. The Crossrail scheme is a combination of surface and un
Jan 1, 2016
-
Applying Human Factors Engineering To Mining SystemsBy Craig Hartley
? A helper stands beside a continuous miner as the operator is at the controls. The operator means to push the stop button but hits the drum rotation start button by mistake. The drum begins to turn a
Jan 1, 1983
-
Some Aspects Of The Hydrodynamics And Polymer Conformation In Polyacrylamide Flocculation Of Chromite OreBy D. R. Spears
As part of its mission to develop technology to assure a continuing supply of minerals, the US Bureau of Mines has investigated the flocculation of a Stillwater, MT, chromite ore. The ore was floccula
Jan 1, 1992
-
Improved Belt Loading And The Effect On Face Production Through Moderation Of Sectional Feeder Discharge Rates (51a24299-8227-404e-b9a0-642d104f66d1)By T. H. Combs
Increased productivity in the U.S. underground coal industry has taxed pre-existing conveyor belt haulage systems. The usual remedies are costly and can disrupt production. A reduction in the belt fee
Jan 1, 1993
-
A Generalized Rail Haulage Simulation ModelBy Richard L. Sanford
The generalized rail haulage simulator described in this paper is an outgrowth of the need to expand a previously developed single level simulator to permit analysis of production problems where inter
Jan 1, 1974
-
Tunneling In Saprolites -- Soil Or Rock?By Brenda Myers-Bohlke, Tor L. Brekke
INTRODUCTION In recent years several cities in the Eastern United States have constructed subway systems in deeply weathered igneous and metamorphic rocks. Portions of these transit tunnels and sha
Jan 1, 1985
-
Rapid Monitoring Of Coal Refuse EmbankmentsBy Lawrence H. Roth
Past failures of coal refuse embankments have resulted in intensified efforts in inspections of coal refuse sites by the Mining. Enforcement, and Safety Administration (MESA). MESA inspections however
Jan 1, 1980
-
Rapporteur?s Report Session III: Exposure To Grunerite (Amosite) Asbestos: Historical Perspectives Of The Health EffectsThe development of information concerning mesothelioma in South Africa started with the 1959 finding of Dr. J. Christopher Wagner of cases of mesothelioma in persons living in the vicinity or working
Jan 1, 2008
-
New Technology In Shaft Sinking The Craig Project (881ea9c2-d5ae-480c-bdfb-c660ed52f398)By W. R. Dengler
Dynatec Mining Limited contracted to sink a lS00 metre (4960 ft.) concrete lined shaft for Falconbridge Nickel Mines in Sudbury, Ontario, Canada. The shaft is 6.3 metres (20.S ft.) in diameter inside
Jan 1, 1992
-
Responsible Mine ClosureBy M. Javier
"The impact of mine closure is perceived through a veil of compliance to human laws and regulations rather than the laws and equilibrium of nature. This perception motivates present research. Understa
Jan 1, 2015
-
Origins Of Clay Minerals In The Molycorp Mine Goathill North Rock Pile, Questa, NmBy V. McLemore, N. Dunbar, K. Donahue
There are three principle lines of evidence that indicate the clay minerals found in the Goathill North (GHN) rock pile at the Molycorp mine are predominantly a product of hydrothermal alteration, not
Jan 1, 2007
-
Analytical Behavior of a Tunnel with Rock Bolts and Shotcrete During an Extreme Fire Event - NAT2022By Dean Newman, Michael Behrens, Mark Trim, Justin Arifin
Road tunnels in recent infrastructure projects in Sydney, Australia, are designed to have a fire resistance level of either a 4-hour cellulosic fire or a 2-hour hydrocarbon fire. Where permanent groun
Dec 1, 2022