Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Development of Slurry Wall Technique and Equipment and CSM Cutter Soil Mixing for Open Cut Tunnels

    By W. G. Brunner

    The slurry wall technique has undergone an evolution from its invention to its today’s status. In the early stages slurry walls were built with cable grab, later on with much stronger hydraulic grab a

    Jan 1, 2007

  • SME
    A Deviation-Minimization Approach to Short-Term Underground Mine Schedule Optimization - Mining, Metallurgy & Exploration (2023)

    By Andrea Brickey, RICHARD AMOAKO, Akshay Chowdu

    Production forecasts derived from the medium-term schedule represent the best path forward for underground mining operations to achieve corporate and operational goals. Unforeseen circumstances, such

    Sep 6, 2023

  • SME
    Safe Slot Hole Excavation With A New Boxhole Boring Machine - Introduction

    By W. Burger

    In underground mines worldwide, a large number of short and small diameter slot holes need to be excavated. Herrenknecht has developed and built a new boxholeboring machine based on the well-proven Mi

    Jan 1, 2012

  • SME
    The North American Tunnel Method—Lessons Learned

    By Don Phelps, John Hawley, David P. Field

    In recent years observational techniques of tunneling have become increasingly popular methods to facilitate complex underground infrastructure projects. The traditional design and construction manage

    Jan 1, 2005

  • SME
    Pre-Excavation Grouting Through Water Bearing Zone Under High Pressure Under Extreme Flow Conditions

    By Adam Shang Robert Fu

    The Yung-Chung-Tunnel in Taiwan, constructed for the Taiwan-East Railway Bureau, collapsed during construction when a water bearing, fractured marble zone was intersected. The inflow was approximately

    Jan 1, 2007

  • SME
    Bringing the Entrepreneurial Mindset into Mining Engineering Education (Mining, Metallurgy & Exploration)

    By Rudrajit Mitra, Erik Hulthén, TOBIAS HARTMANN, ELISABETH CLAUSEN, Aarti Sörensen

    There has been an ongoing debate on how to transform engineering education to better prepare students for today`s professional world that is characterized by increasingly complex problems and challeng

    May 25, 2022

  • SME
    Drainage Problems Of The Chicagoland Area

    By Ben Sosewitz

    The subject of rapid excavation tunneling is one that is extremely important to the people in the Metropolitan area of Chicago. My personal observation is that it is also extremely important to the ur

    Jan 1, 1997

  • SME
    An Active Proximity Warning System For Surface And Underground Mining Applications

    By W. H. Schiffbauer

    NIOSH has developed an active proximity warning system called HASARD (Hazardous Area Signaling and Ranging Device) for warning workers as they approach known dangerous areas around heavy mining equipm

    Jan 1, 2001

  • SME
    Reliability of the Non‑linear Modeling in Predicting the Size Distribution of the Grinding Products Under Different Operating Conditions - Mining, Metallurgy & Exploration (2023)

    By Konstantinos Komnitsas, Evangelos Petrakis, Emmanouil Varouchakis

    During the modeling of grinding systems, population balance modeling (PBM) which considers a constant breakage rate has been widely used over the past years. However, in some cases, PBM exhibited some

    Jun 24, 2023

  • SME
    Onsite Assembly And HARD Rock Tunneling At The Jinping-II Hydropower Station Power Tunnel Project

    By Stephen M. Smading

    Unique onsite assembly of a 12.43 m Main Beam TBM and back-up system was completed on September 18, 2008 in the remote mountains of the Sichuan province of China. The equipment was assembled onsite, w

  • SME
    Preliminary Evaluation Of The Effect Of Coal Cleaning On Trace Element Removal

    By Charles T. Ford

    In 1971, Bituminous Coal Research, Inc~ established a program to provide the coal industry with the necessary information and technical capability to investigate and evaluate potential problems concer

    Jan 1, 1977

  • SME
    Analysis of the Hydro-fracture Potential Around Water Tunnels in Rock

    By Emad Iskander

    The seepage forces generated around pressurized water tunnels in rock are investigated using the analysis tools of geomechanics. The theoretical background of the two-phase material behavior is explai

    Jan 1, 2008

  • SME
    Construction of the Wolf Creek Upper Narrows Tunnel Waterproof Membrane—A Comparison of Tunnel Projects Utilizing the Application of Spray-on Waterproof Membrane

    By L. L. Lacerda, A. J. Blair

    The Wolf Creek Upper Narrows Tunnel (Upper Narrows Tunnel) is one of the first major highway tunnel in the United States implementing the use of spray-on membrane for purposes of constructing a double

    Jan 1, 2005

  • SME
    Inco Limited's Soroako Nickel Project: A Case Study In Financing Large Overseas Mining Projects (90f1f7fb-faea-49e7-947a-96a2f9952c7b)

    By Robert T. DeGavre

    I have been asked by the Society of Mining Engineers to present a paper on Inco Limited's Indonesian nickel project as a case study in the financing of large overseas mining projects. I welcome t

    Jan 1, 1978

  • SME
    Automation in Segmental Tunnel Lining Design: Case Study of the Northside Interceptor Tunnel Project (NSIT) - NAT2024

    By Irwan Halim, Bhoshaga Mitrran Ravi Chandran, Kevin Huynh

    Tunnel segmental lining design constitutes a significant iterative process where modeling and numerical analysis are factors in deciding the number of segments, their dimensions, gasket placements, as

    Jun 23, 2024

  • SME
    Maximizing Value By Protecting Your Intellectual Property Assets ? Introduction

    By S. E. Chetlin

    In the mid-1970?s, the market value of tangible assets of S&P 500 companies far outstripped the value of intangible assets, including intellectual property (e.g., 83% tangible assets v. 17% intangible

    Jan 1, 2012

  • SME
    Status Of A Reclaimed Mine Site In Colorado After 10 Growing Seasons – Preprint 97-54

    By J. J. Gusek

    Several final pits in the Seneca No. 1 Surface Coal Mine were abandoned in the 1960's without king reclaimed. In addition, a progressive landslide aggravated by the abandoned mine land conditions

    Feb 24, 1997

  • SME
    Lake Mead intake No. 3: TBM tunneling at high pressure

    By Erika Moonin, Jim Nickerson, Claudio Cimiotti, Roberto Bono

    "In response to the severe drought on the Colorado River basin and in order to preserve existing water capacity to the Las Vegas Valley, the Southern Nevada Water Authority contracted a new deep-water

    Jan 1, 2015

  • SME
    Analysis of heat loss mechanisms for mobile tent-type refuge alternatives - SME Transactions 2016

    By P. T. Bissert, D. S. Yantek, L. Yan, M. D. Klein

    Federal regulations require that refuge alternatives (RAs) be located within 305 m (1,000 ft) of the working face and spaced at one-hour travel distances in the outby area in underground coal mines, i

    Jan 1, 2016

  • SME
    Anaconda Converts From Autogenous To Steel Grinding At The C.E. Weed Concentrator, Butte, Montana

    By A. D. Rovig

    Metallurgical evaluation of autogenous grinding of Anaconda's Berkeley Pit ores indicated that tonnage throughput increases, at a finer flotation feed size, were possible by converting autogenaus

    Jan 1, 1974