Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SAIMM
    An experimental damage model for predicting the nonlinear behavior of rock

    By S. -H. Chang, C. -I. Lee, Y. -K. Lee

    Based on results from triaxial compressive tests, an experimental damage model to simulate post-peak behaviours as well as nonlinear behaviours before peak strength was developed. In order to consider

    Jan 1, 2003

  • SAIMM
    First Cycle Experience Of A Business Process Re-Engineering Programme At Shabanie Mine

    By C. Musingwini

    In the past ten to fifteen years, many organizations have applied business process re-engineering (BPR) to significantly improve their business competitiveness or stave off closures. The mining indust

    Jan 1, 2005

  • SAIMM
    Electronic Delay Detonators - A Unique Solution To Pertinent Mining Problems (VOLUME 105 )

    By R. Banda

    This paper describes the decision to implement and then the implementation itself, through trials, of electronic ?Smartdets? over previously used shock tubes. It concludes that Mufulira Mine has becom

    Jan 1, 2005

  • SAIMM
    3.2 Lotz - Sampling For Cyanide In Metallurgical Processes

    By Peter W. Lotz

    Contents of: ?Sampling for Cyanide in Metallurgical Processes? ?Sampling at process level of operation ?Sampling at environmental level ?Sample stability and integrity issues ?each citing possi

    Jan 1, 2005

  • SAIMM
    Technical Risk Assessment Techniques And Practice In Mineral Resource Management With Special Reference To The Junior And Small-Scale Mining Sectors

    By J. E. McGill

    The junior and small-scale mining sectors in South Africa play an important role in the livelihoods of numerous communities. Mining presents an opportunity, in the post-1994 democratic era, for many i

    Jan 1, 2006

  • SAIMM
    The Application Of Multi-Parametric Block Models To The Mining Process (63e50f28-b646-4a6d-8d50-bd8beecc9a2a)

    The development of 3D multi-parametric models facilitate the provision of resource information well in advance of the mining face. Using the model, one can evaluate mining areas not only for grade and

    Jan 1, 2007

  • SAIMM
    Technological Change Yields Beneficial Process Improvement For Low Carbon Ferrochrome At Zimbabwe Alloys

    By N. R. Shoko, J. Chirasha

    Zimbabwe Alloys has been producing Low Carbon Ferrochrome since 1953. A number of operational and technical advances have been made since then. Some of these advances improved production significantly

    Jan 1, 2004

  • SAIMM
    Flotation Stabilization And Optimization

    By A. Singh

    The control of flotation plants is by no means trivial. Flotation is one of the most interactive minerals? processing operations. The interactive nature of flotation circuits results in oscillations o

    Jan 1, 2003

  • SAIMM
    An Investigation Of Impact Breakage Of Rocks Using The Split Hopkinson Pressure Bar

    By L. Bbosa

    Paper written on project work carried out in partial fulfilment of BSc (Hons) (Eng) (Mechanical) degree Discrete element methods (DEM) are being used to provide detailed impact histories of the par

    Jan 1, 2006

  • SAIMM
    Quantifying The Differences In Hangingwall Conditions

    By M. Grodner

    Underground excavations exhibit different hangingwall conditions in response to varying geotechnical and mining situations. These differences need to be quantified so as to accurately determine the ef

    Jan 1, 2000

  • SAIMM
    Seismic Monitoring Of A Simulated Rockburst On A Wall Of An Underground Tunnel

    By A. M. Milev

    A simulated rockburst was conducted underground at Kopanang Mine, previously called Vaal Reefs No. 9 Shaft. The rockburst was simulated by means of a large blast detonated in solid rock close to a cro

    Jan 1, 2001

  • SAIMM
    A weathering model for the northern KwaZulu-Natal coastal dune cordon, South Africa

    By C. Ware, R. Uken, G. Whitmore

    The coastal dune cordon of northern KwaZulu-Natal is among the highest in the world reaching heights in excess of 180 m and up to 2 km in width. It comprises a complex system of Quaternary stacked dun

    Jan 1, 2003

  • SAIMM
    The Development And Implementation Of The Lonmin Mechanized Breast Mining (5e0f07f6-c4e0-42f3-af0a-2aaa336e9e56)

    By R. G. B. Pickering

    Over the last few years Lonmin Platinum and Sandvik have embarked on a unique partnership of collaboration through a systematic approach to developing equipment to mechanize and automate narrow reef p

    Jan 1, 2007

  • SAIMM
    The Influence Of Rockpass Excavation And Operation On The Structural Design Of Box Fronts

    By S. Achilleoudes

    This paper describes the various factors that contribute to the maximum design pressures acting on box fronts and how these factors influence the mass and economy of box front steelwork. The influence

    Jan 1, 2005

  • SAIMM
    Bord And Pillar Applications On The Platinum Mine: T-Cut Mining Method

    By C. C. Oosthuizen

    Paper written on project work carried out in partial fulfilment of Technikon Practical Training Frank shaft is mining both Merensky reef and UG2 reef. The Merensky orebody is almost depleted and th

    Jan 1, 2005

  • SAIMM
    The Safe Use Of Shock-Tube And Detonating Cord Systems In Shaft Sinking - A Global Trend

    By L. P. Lamprecht

    Traditionally, South African shaft sinking operations have used electric detonators for the initiation of blastholes. Globally, the trend in shaft sinking is to use the shock tube and detonating cord

    Jan 1, 1999

  • SAIMM
    The Behaviour Of Coke In Submerged Arc Furnace Smelting Of Ferromanganese

    By S. Kamalpour

    It has been observed that the productivity of ferromanganese furnaces, and the stability of metal and slag compositions, vary considerably according to the type of coke used as reductant. However, the

    Jan 1, 2004

  • SAIMM
    Investigations Into The Effect Of Discontinuities On The Strength Of Coal Pillars

    The major proportion of South African coal is extracted by the bord-and-pillar mining method which requires that the overlying strata be supported by pillars of coal. The stability of the pillars is a

    Jan 1, 1997

  • SAIMM
    Shear-flow coupling properties of a rock joint and its modelling by Geographic Information System (GIS)

    By Y. Mitani, F. Vallier, T. Esaki

    Shear-flow coupling tests are conducted using an original apparatus, and a shear-flow coupling model using Geographic Information System (GIS) is developed in order to evaluate shear-flow coupling pro

    Jan 1, 2003

  • SAIMM
    Cut-off grade determination for the maximum value of a small Wits-type gold mining operation

    Work undertaken in the field of cut-off grade optimization has not advanced much beyond the work undertaken by Lane in 1988. His definitive work is based on the calculus of the Net Present Value crite

    Jan 1, 2003