    Make a Good Impression

    By Sandra Penttinen

    There are several ways to get a positive reaction from abutters to blasting projects. When you need to enter structures to conduct a blast-blast inspection, the impression you make on the structure ow

    Jan 1, 2005

  • ISEE
    Advantages in Using Real-Time Blasting Simulation in Surface Blast Planning and Grade Control

    By Peter Dare-Bryan, Will Hunt, Lee Julian

    It is well-known that blasting has an economic effect on grade control activities. However, until recently, methods did not exist for measuring the grade control value change caused by the blast. Rule

    Feb 6, 2023

  • ISEE
    Use of a Scaled Concrete Model to Determine the Origins of Air Overpressure

    By N. Skopak, W. Birch, A. Douglas, C. Johnson

    Determining the origins of air overpressure has been a long-debated topic within the explosives engineering community. Historically, it has been accepted that the initial face movement gave rise to ai

    Jan 1, 2024

  • ISEE
    BURST BLASTING: Solution to a Particular Blasting Problem

    By Wilfrid Comeau

    Vibrograms, which last significantly longer than the actual blast (say 10 to 15 cycles or more), may be signalling an elastic response, which is not uniquely blast related. For example, geophones moun

    Jan 1, 2007

  • ISEE
    Journal: Safety Talk, Managing the Blast Site (The Known Unknowns)

    By William Reisz

    Managing the blast site at almost any operation can be a daunting task. There are so many details that must be observed, understood, and acted upon. It goes without saying that there are no two locati

    Jan 1, 2014

  • ISEE
    Fragmentation Techniques to Produce Armor Stone Blocks for Marine Structure

    By Y Nagendra, A. Ravi Kumar

    A breakwater is a construction for protecting the marine structures like port, harbor, or anchorage-basin and berthed marine vessels from the destructive influence of the sea waves. The breakwater is

    Jan 1, 2005

  • ISEE
    Analyzing and Modeling Presplit Vibration Attenuation to Improve Mine Productivity

    By Tyler Rockley, J. P. Remi Proulx, Ruilin Yang

    A highwall blast vibration project was carried out to quantify the level of blast vibrations produced from a trim blast in soft rock and a combined production and trim blast in hard rock. Combining pr

    Feb 1, 2020

  • ISEE
    Improved Blasting Economics at an Uzbekistan Copper Mine

    By Viktor Aranovich, Thomas E. Brown

    The Almalyk Integrated Mining and Metallurgical Plant is located near Tashkant in Uzbekistan and is one of the former Soviet Union's largest copper producers. Almalyk consumes about 10,000 metric tonn

    Jan 1, 1998

  • ISEE
    Safety in Manufacture of Explosives, Process Hazards and Process Control Measures for Safety

    Explosive manufacture, handling and transportation is hazardous and special precautions should be taken while manufacture, handling and transportation. Various regulations and rules defined in explosi

    Jan 1, 2007

  • ISEE
    Application of blast control plugs and their positive results on airblast and surface fragmentation

    By Lynn Long

    We have seen many new developments in the explosive and blasting accessory category, but one of the most useful items is the blast control plug. Blast control plugs are cone shaped units that are plac

    Jan 1, 1996

  • ISEE
    GEM (Geologic Element Motion) Blast Heave Modeling Sensitivity Studies of Explosive Formulations and Energy Partitioning

    By D. S. Preece, S. Silling, A. Bhuiyan, C. M. Lownds

    GEM (Geologic Element Motion) is a Discrete Element Method (DEM) capability for blast-induced heave simulation with a very fast computational algorithm that can efficiently treat many different elemen

    Jan 1, 2024

  • ISEE
    Problem Boulders, Big and Bigger

    By Jerry Wallace

    Two recent-release boulders posed serious threats to public transportation and utilities in Washington State. Both required challenging drilling and blasting solutions.

    Jan 1, 1997

  • ISEE
    Electronic Initiation Applications at Barrick Goldstrike's Meikle Mine

    By Ray Slavin, Remi Proulx

    The Meikle Mine is a mature underground gold mine utilizing primary and secondary longhole open stoping method with delayed backfill. Combined production with the newly developed Rodeo Mine is 4700 to

    Jan 1, 2004

  • ISEE
    Journal: 100 Years / Petroleum By Sir Beverton Redwood London: Charles Griffin & Company, Limited 1906 Copyright

    By Robert Hopler

    Torpedoing Wells. – On the completion of the drilling, or when the production is found to decrease, it is usual to “torpedo” the well to increase the flow. This process was patented in 1862 by Colonel

    Jan 1, 2007

  • ISEE
    Experimental Studies to Investigate Pressure Loading on Target Plates

    By T Duff

    This paper describes results from small scale tests conducted to determine the distribution of pressure on target plates when subjected to loading due to the detonation of a buried mine in various med

    Jan 1, 2014

  • ISEE
    Journal: Old South Pole Demolition

    By John Horgan, Ethan Marcoux

    Explosives have been used to demolish many unsafe structures around the world. However, it is unlikely any demolition job has ever involved destroying buildings already buried 40 feet (12 meters) into

    Jan 1, 2015

  • ISEE
    Flyrock Control - By Chance or Design

    By Adrian J. Moore, Alan B. Richards

    Responsible blasting requires that rock throw be controlled to ensure that no danger will result to people and property. This paper describes the development and testing of empirical field calibrated

    Jan 1, 2004

  • ISEE
    Assessment of Blast Energy Usage and Induced Rock Damage in a Hard Rock Blasting

    By M. S. Dotto

    The knowledge of the explosive/ rock mass interaction process is important in predicting blast performance. It includes understanding rock properties, energy usage, and attenuation in the rock mass. T

    Feb 1, 2020

  • ISEE
    Fragmentation Improvement Through the Application of Explosive Charge in the Stemming for the Reduction of Oversize in High Hardness Rock

    By Gustavo Huerta Valer, Jorge Cárdenas Miranda, Johan Salas Flores

    One of the challenges of mining is the optimization of the blasting process, which has an important impact downstream in the processing of crushed ore in the plant, that is why mining companies ensure

    Feb 6, 2023

  • ISEE
    Use of Electronic detonators to control blast vibrations – a cautionary tale

    By S. Hosein, W. Birch, C. Johnson

    The widespread adoption of electronic detonators has given rise to the development of linear superposition to control the environmental impact on both third-party properties and residents resulting fr