Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Complex Piling Works At London Blackfriars Station
By Jamie D. McEwan
To cater for the future introduction of 12 car trains, London Blackfriars railway station is being extended from the north end to span across the River Thames. Following the demolition of existing bui
Jan 1, 2011
-
Underpinning Support Pipeline Compressor Station Founded On Timber Piles Potter, Ontario - DFI Conference, Toronto, Oct 1997 - Underpinning Support - Pipeline Compressor Station - Background
By Brian Isherwood
TransCanada Pipelines, Calgary (TCPL) is one of North America's leading transporters of natural gas through its energy transmission business. TransCanada also operates significant complementary b
Jan 1, 1997
-
What Has Been Learned About Drilled Shafts From The Osterberg Load Test - Summary
By Jorj O. Osterberg
The Osterberg (O-Cell) Method makes it possible to separate the side shear resistance (skin friction) from end bearing. The O-Cell is placed on or near the bottom of a drilled shaft and after the conc
Jan 1, 1999
-
Comparison of Pile Foundations and Ground Improvement for Reduction of Seismic Displacements for a Wastewater Treatment Plant
By Andrew Port, Ali Ghandeharioon
Nonlinear seismic deformation analyses using the finite difference program FLAC were performed for a wastewater treatment plant to estimate foundation displacement and performance of two proposed tric
Jan 1, 2018
-
Evaluation Of A New P-y Analysis Tool For Lateral Analysis Of Drilled Shafts Using Load Tests In Nevada
By David H. Sanders, Ramin Motamed, Fahim M. Bhuiyan, Raj V. Siddharthan
Large-diameter drilled shafts (DS) are a critical part of a seismic-resistant system, and therefore it is important to be able to accurately model lateral resistance. To undertake the lateral load ana
-
Top-Loaded Bidirectional Test, a New Approach to Deep Foundations Load Testing
By Patrick J. Hannigan, Frank Rausche, Rozbeh B. Moghaddam
The Top-Loaded Bi-Directional Test (“TLBT”) is a new method to apply bi-directional loads to a deep foundation element with the loading source located above the foundation head. In the TLBT reusable l
Sep 8, 2021
-
Deep Excavations And Foundations For Locks ? Synopsis
By B. H. Moore
Foundation and excavation problems associated with lock construction projects vary widely. Each lock requires a different foundation to respond to a unique geologic setting. The range of heights and f
Jan 1, 2010
-
Open Well Caissons Of A 1917 Railroad Bridge: How 19th Century Construction Can Influence 21st Century Construction (f1b0a5f2-b1b8-41d4-bbfb-fab6f395e7a0)
By Alan D. Fisher
Amtrak made a decision to replace an aging bascule bridge with a vertical lift bridge for their crossing of the Thames River in New London, Connecticut. The new lift bridge occupies the same alignmen
Jan 1, 2008
-
Are Specifications for Deep Foundation Concrete Up-To-Date?
By Karsten Beckhaus
"Abstract Tremie concrete for special geotechnical works needs special properties, especially during the casting process. Today’s execution standards for bored piles and diaphragm walls, EN 1536 and E
Jan 1, 2014
-
Axial Pile Displacement Evaluations From Seismic Piezocone Data And Back-Analysis Of Load Tests
By Fawad S. Niazi
Ever since the use of the cone penetration test (CPT) in geotechnical practice, attempts have been made to correlate CPT parameters with pile capacity components of unit end bearing (qb) and unit shaf
Jan 1, 2011
-
Westlink Projects – Geotechnical Challenges During The Execution Phase
By Robert Thurner, Albin Norrman, Sami U. Raja
The West Link is a double track railway project currently under construction in Gothenburg, Sweden. The project includes the construction of 8 kms of track, 6 kms of which will be in tunnels. Beside s
May 1, 2022
-
Keynote Lecture: Axial Design And Lateral Design - Deep Foundations
By Mike Neill, O&apos
? Bypass soft soils near the surface ? Resist uplift loads ? Resist lateral loads ? Bypass scourable soils ? Bypass liquefyable soils ? Mitigate movement of expansive or frozen soils ? "Tu
Jan 1, 1998
-
Newfoundland Transshipment Project: Design-Build Construction Of Oil Tanker Wharf Using Permanent Steel Jackets. - Summary:
By Alun J. Davies
This paper describes a design-build project for the construction of a tanker wharf for 150,000 dwt vessels. The tankers deliver oil from offshore oil fields to a Transshipment terminal on the south co
Jan 1, 2000
-
Augered Cast-In-Place (ACIP) And Drilled Displacement (DD) Pile Quality Control ? Introduction
By Rudolph P. Frizzi
Quality control is essential for augered cast-in-place (ACIP) piles (also known as continuous flight auger (CFA) piles outside the United States) and drilled displacement (DD) piles since the pile is
Jan 1, 2004
-
Experiences From The Italian High Speed Rail Network AV Construction
By Vincent Jue
In December 2009, the Italian High Speed Rail Network AV began running over the full 1000 km system length from Turin, at the foothills of the Alps to Salerno, on the seacoast south of the volcano Mt.
Jan 1, 2010
-
The Silver Spring Transit Center: Design And Construction Of Drilled Shafts In An Urban Environment
By James E. Parkes
The Silver Spring Transit Center is a new three-level transit center that will include bus loops for County, Metro and intercity buses, parking, and retail space. It replaces an existing bus station
Jan 1, 2011
-
Drilled Piers In The Piedmont - Introduction
By Stanley A. Schwartz
In the Piedmont, heavily loaded structures are generally supported by either drilled piers or one of several pile types. The choice of drilled piers or piles is typically one of comparative costs. The
Jan 1, 1988
-
New Technologies For Quality Control Of Augered Cast-In-Place Piles
By Tracy Brettmann
In recent years the Augered Cast-In-Place (ACIP) Pile industry has seen a substantial increase in the quality control options available to Contractors, Engineers, and Owners. Quality control methods r
Jan 1, 2000
-
Deep Diaphragm Walls And Bored Piles For Subway Construction At The Amsterdam Central Station
By Wolf-R. Under
For improvement of urban traffic infrastructure, the City of Amsterdam is currently constructing the 9.5 km long North-South Metro line passing through the central districts of Amsterdam. Focal secti
Jan 1, 2006
-
Quality Control For Installation Of Augered Cast-In-Place Piles
By Francis J. Arland
The installation of augered cast-in-place (ACIP) piles requires careful quality control to assure a successful pile installation. Unlike steel, pre-stressed concrete or other types of driven piles, wh
Jan 1, 1997