Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Large Diameter Shafts - Youghiogheny Reservoir BridgeBy Paul J. Lewis
Estimation of the axial side shear resistance of drilled shaft rock sockets is directly related to the unconfined compressive strength of the bedrock. Commonly, the mean unconfined compressive strengt
Jan 1, 2005
-
Soil Improvement Technique to Mitigate Extreme Settlements on Deep Compressible Deposits in the Bogota ValleyBy Roger A. Archabal, Omar A. Conte, Gustavo Langoni
This international case study focuses on the rigorous geotechnical interaction and results of a soil improvement program utilized to mitigate consolidation settlements of over 1.5 m [5.0 ft]. The extr
Jan 1, 2018
-
The Final Piece of the Puzzle: Re-Design Of Grouted Closures for a Dam Cutoff WallBy Daniel P. Stare, Lucian P. Spiteri, Christopher M. Hallahan, James C. Myers
Buckeye Lake Dam was substantially remediated between 2015 and 2018 as a result of unacceptable dam safety performance. A permanent seepage cutoff, consisting primarily of a soil mixed cutoff wall (SM
Jan 1, 2019
-
Bearing Capacity Of Precast Nodular Piles In Tianjin Soft Clayey SoilBy Xu Youzai
Static loading teets of five nodular piles and four non-nodular piles were performed in Tianjin soft clayey soil in which measurements of axial force and movements were made. Distribution of shaft res
Jan 1, 1991
-
Army Corps of Engineers Seepage Control Cutoffs for Dam and Levees Engineering Manual (EM)By David B. Paul
"ABSTRACTThe US Army Corps of Engineers (USACE) has 704 dams in their inventory and over 100,000 miles of levees with a capital value of over $150 billion. Currently, there are 319 dams that are class
Jan 1, 2014
-
Industry Practice Standards And DFI Practice Guidelines For Structural Slurry Walls - First Edition - Title ? Table Of Contents - Part I Industry Practice Standards - 1. Classification Of Slurry Wall PanelsThere are many ways to classify structural slurry wall elements, but the DFI committee chooses to limit these descriptions to three functional requirements, namely: design function, plan configuration
Jan 1, 2005
-
Dynamic Monitoring Program Results Indicator Pile Tests -I-880 - IntroductionBy D. Michael Holloway
The realignment of Interstate 880 replaces the double-decked (Cypress) viaduct collapsed in Oakland, California during the 1989 Loma Prieta Earthquake. The California Department of Transportation (CAL
Jan 1, 1996
-
The Historical Evolution Of Piling And Deep Foundations And Prospects For The Future. (6f8f1933-2bde-4a96-8f8f-131aa6e7971f)By W. G. K. Fleming
The general history of piling is traced up to the present time with regard to the evolution of methods and materials. The processes have been strongly influenced by developments in basic equipment and
Jan 1, 1999
-
Secant Pile Shoring - Developments In Design And ConstructionBy Eric S. Lindquist
High groundwater levels combined with variable soil and rock profiles present challenges to the design and construction of deep excavation support systems. Increasingly, secant piling techniques are t
Jan 1, 2011
-
Estimation Of Settlements Of Piles In GroupBy Kazimierz Gwizdala
In the paper the method for estimation of settlement of vertically loaded piles in a group is presented. The method is generally based on the hybrid procedure with non-linear solution for single piles
Jan 1, 2002
-
Continuous Grouting In Embedding Of Sheet PilesBy Jouko L. Lehtonen
Sheet pile walls can be sealed watertightly using various methods. The objective of this paper is to introduce a new innovation comprising the use of continuous cement grouting during embedding. The m
Jan 1, 2006
-
Evolution Of Piling Design And Techniques In Mudstone At Manchester AirportBy Colin Curtis
In recent years, Manchester Airport has undergone expansion including the construction of a second runway, a new terminal building (Terminal 3) and extensions to the existing Terminal 1. Manchester is
Jan 1, 2001
-
Case History: Deep Soil-Cement Mixing At The I-90/I-93NB Interchange On The Central Artery/Tunnel Project, Contract C09A7 At Fort Point Channel Site, Boston, MA - SynopsisBy Robert Jakiel
The following paper is being presented to provide an understanding of the Deep Soil-Cement Mixing (DMM) performed at Contract C09A7 at the Fort Point Channel Site (FPC), for the I-90/I-93 Interchange
Jan 1, 2000
-
Disconnected Piled Raft Foundations Performance (DCPRF) With CushionBy Saeed Salehi Malekshah
In hybrid foundation system or piled raft foundation (PRF), the raft has adequate bearing capacity and piles are usually required to ensure overall stability of foundation and also to act as settlemen
Jan 1, 2011
-
The Effect Of Vertical Pile Loading On Subsequent Lateral BehaviourBy A. Lyndon
Vertical and lateral load tests were carried out on two 13 m deep bored cast-in-place instrumented piles, socketed into weathered sandstone. The first pile, 1200 mm in diameter, was loaded vertically
Jan 1, 1989
-
Time-Dependent Bond Regain In Driven Piles In Permafrost ? SynopsisBy B. Ladanyi
The design philosophies for piles in unfrozen and frozen soils are compared, and their similarities and differences are underlined. It is shown that in frozen soils, the long term behavior of a pile i
Jan 1, 2010
-
Simbat : High Strain Dynamic Test Of PilesBy Dominique Vié
Standards methods covers the procedures for testing deep foundation to determine the force and velocity response to an impact of a pile driving hammer or similar device. The results of analysis genera
Jan 1, 2002
-
Pile Foundation Solutions in the Deep Quaternary Sediments of Botany BayBy Paul A. O’Brien, Gary A. Chapman, Thomas G. Cuniowski
"The new Amcor B9 paper mill in Botany, NSW, Australia, involved the design and construction of a new paper mill founded within the Botany Basin Sediments. There were numerous design and construction
Jan 1, 1900
-
Effects Of Helical Anchor Geometry On Long-Term Performance Of Small Wind Tower Foundations Subject To Dynamic LoadsBy Amy B. Cerato
The application of this study is to use helical anchors as a foundation system for small wind tower (1 ? 10 kW) guyed cables. Helical anchors are currently used to anchor guyed cables of telecommunic
Jan 1, 2008
-
Interlocking Caisson WallsBy William E. Lardner
Interlocking caisson walls developed from conventional "soldier pile and lagging" shoring. In the latter, the soldier piles receive directly most of the soil load. Natural arches form in the soil behi
Jan 1, 1987