Frustum Confining Vessel (FCV) For Investigation of Deep Foundation PerformanceBy Abolfazl Eslami, Masoud Zare, Ali Asadi, Ali Abrang
"Physical small scale models for study of deep foundations can be performed in simple chambers (1g), calibration chambers (CC), and centrifuge apparatus (ng) which involve some limitations and difficu
Jan 1, 2015
-
Cement-Bentonite Slurry Cut Off Wall Maxent Lagoon Levee Rehabilitation Orleans Parish, Louisiana - SummaryBy Edmund J. Cardoza
The paper describes the design, construction and quality control aspects of the installation of a cement-bentonite (CB) cut off wall to impede seepage through a flood control dike. Special emphasis is
Jan 1, 1992
-
Shoring And Caissons At The Air Canada Centre/Raptors StadiumBy Dawn C. Tattle
[ ] Panoramic View of Completed Facade Supports The following case history describes the installation of earth retention systems, historical facade supports and structural caissons by Anchor Shor
Jan 1, 1997
-
Simulation of Brittle Failure of Cement Treated Soil Using Smoothed Particle HydrodynamicsBy Tomohide Takeyama, Yuki Yoshida, Masaki Kitazume
"Abstract A series of centrifuge model tests was conducted to investigate the failure pattern and stability of cement treated clay ground having an unsupported vertical slope. The model ground was sub
Jan 1, 2014
-
Use Of Nondestructive Testing To Evaluate Defects In Drilled Shafts: Status Of FHWA Research - BackgroundBy Clyde Baker
Drilled shafts for many situations offer an economical alternative to driven piles. The Federal Highway Administration (FHWA) has spent considerable time and money in research and developing design an
Jan 1, 1989
-
Drilled Pier Foundation with Ground Improvement Using Cement Deep Soil Mixing for Highway BridgesBy Shahriar Vahdani, Andy Herlache, Andrew Bro, Wei-Yu Chen
"The Presidio Parkway Project will reconstruct approximately 1.6 miles of highway, including seven bridges, three cut-and-cover tunnels, and an undercrossing connecting the Golden Gate Bridge to the C
Jan 1, 2014
-
Inspector?s Guide To Augered Cast-In-Place Piles - Second Edition - Title ? Table Of Contents - 1.0 GeneralThis manual is limited to Augered Cast-in-Place (ACIP) piles constructed using a hollow stem continuous flight auger. 1.1SCOPE AND LIMITATIONS The intent of this manual is to provide guidelines
Jan 1, 2010
-
Inspector?s Guide to Augered Cast-in-Place PilesBy Matthew E. Meyer
The intent of this manual is to provide guidelines for observing and documenting the installation of ACIP piles. The manual may also serve as a guide for the training of inspection personnel. It is ex
Jan 1, 2010
-
Design Of The Drilled Shaft Foundations For The Cooper River BridgeBy Liang Shen
The Cooper River Bridge, the longest cable-stayed bridge in North America, replaces two existing bridges along U.S. Highway 17 and connects the City of Charleston and the town of Mount Pleasant, South
Jan 1, 2013
-
Drilling And Dewatering In An Urban Environmentprivate - Project Description And LocationBy Joel Moskowitz
In 1990, the United States General Services Administration (GSA) issued a contract for design and construction of a new federal court building in New York City. Mueser Rutledge Consulting Engineers (M
Jan 1, 1996
-
Drilled Shaft Difficulties and a Micropile SolutionBy Jeff Jackson, Paul Axtell, David Graham
The Montana Department of Transportation recently awarded a contract to construct a replacement bridge across the Clark Fork River in Heron, MT. Both abutments and both intermediate bridge bents were
Jan 1, 2018
-
Presentation #1 - Deep Foundation Inspection And Integrity Testing - Introduction - Why Use Drilled Shafts?By Bernard Hertlein
¦ Drilled shafts resist scour seismic loads better than groups of driven piles ¦ Drilled shaft construction creates less noise and vibration than driving piles ¦ Drilled shafts permit direct obser
Jan 1, 2001
-
Assessment Of The Risk Of Pile Driving To Juvenile Fish - The ProblemBy James J. Anderson
In this talk I will report on an effort to reassess the risk of pile driving to juvenile salmonids migrating through Puget Sound. The study was motivated by the concern of the construction industry th
Jan 1, 1990
-
Guidelines for Selecting Cutoff Wall SystemsBy Mary Ellen Large
This publication of Deep Foundations Institute (DFI) is intended to provide project owners, design engineers and construction professionals with guidelines for selecting cutoff wall and barrier system
Jan 1, 2021
-
Investigation and Design for Large Drilled Shaft Foundations in Southwest ArizonaBy John C. Tosh, Peter M. Kandaris, Sheldon John
Geologic, geotechnical and hydrologic studies were performed for the design of 115 deep, large diameter drilled shaft reinforced concrete foundations (6 to 12 feet) to support tall steel monopoles for
Sep 8, 2021
-
Pile Load Testing Of Helical Piles And Driven Steel Piles In Anchorage, AlaskaBy Mohammed Sakr
The use of helical piles for permanent foundation applications has become a practical and feasible alternative to the traditional cast-in-place concrete or driven steel piles. Research and development
Jan 1, 2009
-
Fraser Heights Bridge – Comparison between PDA Tests and Pile Capacity Estimation MethodsBy Ali Azizian, Brian Hall
"Driven piles were selected to support the Fraser Heights Bridge bents. Piles were a key component of the top-down construction approach, which was adopted for minimizing potential impacts on an envir
Jan 1, 2016
-
Development Of Design Practice For Piles In Stiff Glacial TillBy Kenneth Gavin
Design practice for piles installed in Irish glacial till has developed in an ad-hoc manner, based on the results of un-instrumented load tests. This had led to designers using similar design paramete
Jan 1, 2009
-
Threading Piles Past Underground Assets In Central LondonBy Alexander Nikolic
The paper presents the foundation design and construction of a landmark urban redevelopment scheme in central London, UK. The scheme comprises the new Tottenham Court Road Underground station, Crossra
Jan 1, 2011
-
Refurbishment Of A Piled Commercial Building With A Single Level Basement For A 70% Increase In Floor AreaBy Henry H. Tayler, Eric Sturel
1 Triton Square was originally a six-storey building with a one-level basement located within a commercial development near Euston, London. It was designed and constructed in the 1990s and the foundat
May 1, 2022