Minimising The Environmental Impact Of Construction Dewatering
By Peter Jackson
The dewatering of the large construction pits required for major infrastructure projects often has a significant impact on the environment. This is particularly so in urban areas and where groundwater
Jan 1, 2000
-
Instrumented Rock-Socketed Drilled Piers Hamilton General Hospital ? Introduction
By R. G. Horvath
In the Hamilton area, and in many other areas of Ontario and around the world, large diameter drilled pier (caisson) foundations are frequently selected as the most appropriate foundation system for h
Jan 1, 1987
-
New Focus: Environmental Impact Reduction of Proper Slurry Waste Management
By Zachary Q. Maassen
The purpose of this paper is to highlight the environmental benefits of properly managing slurry waste as it is generated on site. The following projects will be used to illustrate the importance of p
Jan 1, 2018
-
Design Of The Marine Foundation For The Skyway Project Of The San Francisco Oakland Bay Bridge
By Gerry Houlahan
The east span of the 3.5 km long SF-Oakland Bay Bridge is supported by different types of foundations along its span. Starting from the west, its first 460 m section comprising twin concrete box-girde
Jan 1, 2005
-
Design Of Deep Foundations Over Shallow Mine Workings
By Tianfei Liao
Extensive site investigations revealed that abandoned shallow mine workings exist under a site planned for construction of a major new facility. Since the mine voids were susceptible to collapse, they
Jan 1, 2009
-
Downtown Seattle Transit Project - International District Station
By Richard K. Sandaas
Start Date: April 4, 1988 Completion Date: Dec. 29, 1989 Contractor: SCI Contractors Past and present transportation centers will come together at International District Station, located at th
Jan 1, 1990
-
Pile Load Testing At JFK International Airport - Synopsis
By J. Moskowitz
Construction of the new JFK International Airport Light Rail System (LRS) began in 1998 with a pre-construction load test program. This $1.2 billion design-build project consists of approximately 13 k
Jan 1, 2000
-
First Quality Tissue Plant, Lock Haven, Pennsylvania: A Case Study Of Drilled Displacement Dewaal Piles ? Introduction
By Gordon King
The site of the First Quality Tissue plant is located on a previous paper production facility in Lock Haven, Pennsylvania. The new development, which included the construction of a tissue machine buil
Jan 1, 2004
-
Securing Rail Infrastructure in Romania
By Andreas Brandner
"At the beginning of 2007 the Austrian contractor PORR was awarded with remediation works for a 48-km long part of the railway line from Campina to Predeal – part of the Trans European main Corridors
Jan 1, 2017
-
Evaluation Of Achievable Column Diameter In Jet Grouting
By Chu E. Ho
Key variables that govern the jet cutting process are examined based on fundamental theories of jet hydrodynamics and soil mechanics. Under normal conditions of jet grouting operations, lift speed and
Jan 1, 2006
-
Cape Wind Offshore Wind Farm – Electrical Service Platform – Substructure Jacket Design
By S. Chilka, I. Maloney, J. Brady
"The purpose of this project was to design the Electrical Service Platform (ESP) for the Cape Wind Offshore Wind Farm. The ESP structure comprises two primary parts: the topside platform housing the e
Jan 1, 2017
-
New York City - A Review Of Various Foundation Problems And Solutions - Synopsis
By Mel Febesh
Working in New York City has become the graveyard of many Foundation Contractors. Varying subsurface conditions require Foundation Contractors to be aware of the conditions at each particular site and
Jan 1, 2000
-
Design Of Drilled Pier In Expansive Soils
By G. T. Hong
A numerical model for use in design is developed to predict the stresses and axial and bending displacements in a drilled pier in expansive soils. The prediction is based on the horizontal swelling p
Jan 1, 2007
-
Dynamic Pile Monitoring For Offshore Pile Acceptance
By Scott Webster
Dynamic pile Monitoring Services (DMS) have been used for testing of offshore piles for several decades. However, most of this testing was to measure hammer performance and pile stresses rather than
Jan 1, 2010
-
Ground Improvement Using Stone Columns To Mitigate Liquefaction Potential Of Fine Sand By Wet Top Feed Vibro Replacement Method – A Case Study
By Parameswaran V. S, Anshuman Singh
This is a case study on ground improvement using Stone columns at Kokrajhar in Assam which comes under seismic Zone V as per IS: 1893. The strata at site comprised of mostly fine sands with low SPTN v
Nov 1, 2022
-
Design And Performance Evaluation Of Bored Piles In Sand
By Ashutosh S. Dhar
Cast-in-place piles were examined in this paper from the viewpoints of construction quality, axial capacity, and load-displacement responses. The results of ten 450 mm diameter (18? f) bored piles, in
Jan 1, 2006
-
Special Foundation Technique For The Intersection Of Two Canals Near Magdeburg, Germany - Summary:
By Wolfgang G. Brunner
The closing of the gap in the European waterway- net is one of the big and challenging traffic projects following the German reunification. The water canals in the North German plain connect the Rhine
Jan 1, 2000
-
Analysis Of Driving Stress Measured In The RC Long Pile
By Yu Zhenquan
At the construction site of Bao Shan Iron &. Steel Mill in Shanghai, lots of RC driven piles with length of 50 to 60m were applied. The most unfavourable distribution of stress along the pile shaft wa
Jan 1, 1991
-
Deep Soil Mixing Utilizing Multi-Auger Equipment And Procedures - General - Background Information
By Robert Jakiel
The following paper is being presented to provide a basic understanding of the equipment and procedures used in multi-auger deep soil mixing as part of the program for the Deep Foundations Institute (
Jan 1, 2001
-
Operator Independent Installation Of Lime Cement (L/C) Columns
By Tobias Hansson
The quality of Lime Cement (L/C) columns is to a great extent dependent on the installation procedure. At a site in the south of Sweden, the client reported problems with the installed columns. To eva
Jan 1, 2000