Mooring Bridge Caissons During Construction Using Jetted-In Driven Plate AnchorsBy Osama A. Safaqah
Driven plate anchors can be used to hold in place large bridge caissons during floating construction. Their small size and simple method of installation make them a very cost effective alternative to
Jan 1, 2013
-
Understanding The Vibratory Pile Driver/Extractor: A Field Man's Perspective - 1. What Is A Vibro Driver/Extractor And How Does It Work?By John L. White
The vibro driver/extractor is a machine that grips to a pile and vibrates it up and down. When the vibrating pile is lowered into the ground, all soil around the pile begins to vibrate. A vibrating pi
Jan 1, 1990
-
Bridge Pier Remediation, New London CTBy Walter Kaeck
In a recent upgrade of their system, Amtrak converted a bascule type draw bridge over the Thames River to a vertical lift structure supported by the existing piers. During the bridge replacement, sign
Jan 1, 2009
-
Retaining Wall Installation Beneath An Existing StructureBy Kenton W. Braun
Concourse B at the Anchorage, Alaska International Airport is currently being renovated while retaining the original building structure and foundations. Part of the renovation includes the installati
Jan 1, 2008
-
Application of Non-Destructive Testing to Drilled ShaftsTechnically speaking, the concept of NDT sounds like the "magic bullet" when faced with a questionable drilled shaft. All the Contractor or Engineer needs to do is select an NDT method, apply it, unde
Jan 1, 2004
-
Open Cell Sheet Pile® Dock In Remote Alaska Provides Innovative And Cost-Effective SolutionBy Dempsey S. Thieman
Innovative marine bulkhead design and construction techniques were used in the fast-track design and construction of a high-capacity, deep-water dock in the highly seismic region of Alaska?s Aleutian
Jan 1, 2008
-
Laboratory Mixing and Testing for Controlled Waste Disposal SiteBy Tomohiro Yamasaki
"At the pre-construction foundations of the controlled waste disposal site built at the Port of Kinuura, the clayey soil account for the most, and with lesser amounts of sand compaction piles and sand
Jan 1, 2015
-
Improvements in Deep Compaction Using Vibratory Pile Hammers (a877ad8a-6d27-4e33-a419-f0edb9bac870)By Dennis Nottingham
"Increased interest in seismic soil liquefaction and preventative soil stabilization sets the stage for improved deep compaction methods using pile driving techniques. In 1971, L.B. Foster Company per
Jan 1, 2005
-
Vibrations Caused by Pile Driving (bb4f9935-841f-4be3-bb1b-f95875d26e25)By K. Rainer Massarsch
"Part 1 of 2 By K. Rainer Massarsch, Geo Engineering AB, Stockholm, SwedenINTRODUCTIONConstruction activities, such as driving of piles and sheet piles, soil compaction or excavation generate noise an
Jan 1, 2004
-
Keynotes: Axial Capacity Of Drilled Foundations In Soft Rocks And Intermediate Geomaterials - Presentation NotesBy Michael W. Neill, O&apos
This presentation addresses some of the problems encountered in estimating the capacity of drilled shafts and augered, cast-in-place piles in soft rock. Methods to quantify side and base resistance ar
Jan 1, 2001
-
Construction of 10’ Diameter Shafts for the Olmsted Approach Walls ProjectBy Thomas G. Tavernaro, Jeffrey A. Schaefer
"The $106 million Olmsted Approach Walls Project, completed in the spring of 2004 by Massman Construction Co., Kansas City, MO, is one phase of a new $1.4 billion Corps of Engineers locks and dam faci
Jan 1, 2006
-
Stone Column Treatment and Elaborate Load Tests Verification for Improving Subsoil Conditions on a Large-Scale Residential Development ProjectBy Vijaya Bhushan Rao, Jason Redgers
A substantial lifestyle destination in the United Arab Emirates, in the Emirate of Abu Dhabi comprising of 1315 villas, town houses and non-residential leisure facilities is built over an area of 280
Sep 8, 2021
-
A Case Study Of Deep Shaft Excavation In River Channel Soil Deposit In KolkataBy Kaustuv Bhattacharya, Manish Kumar, Nirbhay Singh, Prodyot Kr. Ray, Praveen Soin
This paper highlights salient features of an excavation 38 m (Length) by 10 m (Width) by 24 m (Depth) carried out in Central Kolkata. Secant pile wall (SPW) formed using a combination of alternating 1
Sep 1, 2022
-
Building a High-Rise Adjacent to Transit Tunnels in San Francisco (6bdbc52a-94a2-4c48-ba21-cc4450dc649d)By Lori A. Simpson, Linda H. Liang
A high-rise building, consisting of two tower structures occupying the entire site, is in construction in San Francisco. The North Tower will consist of 12 and 35 stories above a one-level basement. T
Jan 1, 2017
-
Monitoring Auger Cast in Place Pile Construction and Testing in Hard Clay (c1a730a8-7e87-4cd7-85b2-336e4f7995da)By Onur Guvener, Kalaiarasi Vembu, C. Vipulanandan
"Installation procedure and the quality of the material used in the construction have significant effects on the behavior of the Auger Cast in Place (ACIP) piles. In this study, Installation and curin
Jan 1, 2017
-
Building A High-Rise Adjacent To Transit Tunnels In San FranciscoBy Lori A. Simpson
A high-rise building, consisting of two tower structures occupying the entire site, is in construction in San Francisco. The North Tower will consist of 12 and 35 stories above a one-level basement.
-
Interpretation of Seismic Response Data from Full Scale Helical Pile TestsBy A. B. Cerato, M. K. ElSawy, A. Elgamal
"Helical piles are gaining popularity as foundations for new construction as well as retrofitting option for deficient foundations. More recently, large diameter helical piles are used to support stru
Jan 1, 2017
-
Pile Foundation Response to Ground Vibration from Rock BlastingBy Anthony T. C. Goh, Zhiye Zhao, Laddu B. Jayasinghe, Hongyuan Zhou, Yilin Gui
"Ground vibrations from blasting are undesirable and they are very short in duration with high principal frequencies and high amplitude. Structural response to that kind of excitations may differ sign
Jan 1, 1900
-
Analysis of Pile Interaction under Lateral Cyclic Load in Cohesiooless SoilBy Sudip Basack
"The topic of pile foundation subjected to lateral cyclic load is an age-old problem confronted by Geotechnical Engineers. The environment prevalent in ocean and shorelines necessitates the piles supp
Jan 1, 2005
-
Failure Analysis and Strengthening of Tailing Pond Embankment by Prefabricated Vertical Drains and GeogridBy Anup Kumar Mandal, Sanjoy Chowdhury, Biswajit Das
"Tailing pond of an iron ore mine necessitated raising the height of its embankment to create additional storage capacity. The tailing pond is located in eastern India and raising the height of embank
Jan 1, 2015