Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Which Hoist- Drum or Friction Type?By J K. Irwin
The authors discuss the application of drum and friction hoists under modern conditions and give four examples of friction hoists proposed for various applications. The paper concludes with a summary
Jan 1, 1964
-
Mako Single Stage Sag Mill Comminution Circuit Design, Commissioning and Ramp-UpBy P. Scinto, P. Hudson
"Modern day ore bodies are becoming increasingly harder, more abrasive and lower grade. The Mako deposit is located in Senegal and consists predominantly of primary mafic and felsic lithology that are
Jan 1, 2019
-
Designing For Paste ThickeningBy Tim Edwards, Richard Triglavcanin, Ian Arbuthnot, Darren Colwell, Brad Garraway, Ken Roberts
"In the mineral processing industries, there is an increasing need to design thickeners which are able to produce high density underflows usually referred to as “paste”.The behaviour of a flocculated
Jan 1, 2005
-
Cone Crusher Operaitonal VariablesBy A. J. Magerowski
Energy consumption is a main component of operational costs for the comminution of mineral bearing ores. Reduction of energy consumption has continually been addressed by mill operators and equipment
Jan 1, 1986
-
Commissioning and Operating Experience with Gekko’s Gold Ore Treatment PlantsBy Tim Hughes, Steve Gannon, Jennifer Abols
"In the past year, two very innovative gold ore processing plants have been designed, built and commissioned by Gekko Systems Pty Ltd. The first plant in Vietnam utilizes conventional crushing and bal
Jan 1, 2007
-
Milling Operations at Omai Gold MinesBy Eric Konigsmann
"Omai Gold Mines is a large scale open pit gold mining operation located in central Guyana, South America with a 12,000 tonne per day milling facility. Mill operations were initiated in December 1992
Jan 1, 1994
-
Some Approaches in Improved Fine Particle Flotation and SeparationBy Mohamed Ourriban, Yongjun Peng, Qi Liu, Denis Cotnoir
"In the flotation of fine particles, there are two difficulties in general: low recovery of valuable minerals and high recovery of gangue minerals. The low recovery of fine valuable minerals is attrib
Jan 1, 2006
-
The Nanisivik MillBy A. C. T. Bigg
"The mineral potential of the Nanisivik area was discovered as far back as 1910 when a prospector of the Geological Survey of Canada, on an expedition under Captain J. G.Bernier, recorded a deposit of
Jan 1, 1980
-
Sub-aqueous Inpit Deposition of Uranium Tailings at Key LakeBy Trevor Hamm, Nick Holl
"Cameco Corporation is operator of the world's richest uranium project, the Key Lake mine/mill complex, located within the Athabasca region of Northern Saskatchewan. Mineable resources from the Key La
Jan 1, 1998
-
A Comparison of the Energy Requirements of an HPGR / Stirred Mill Circuit and Conventional Grinding Circuits for the Comminution of Mesaba OreBy Steve Wilson, Bern Klein, Jeff Drozdiak, Stefan Nadolski, Andrew Bamber
"In the adaptation of high pressure grinding rolls (HPGRs) to hard-rock mining applications, circuit development has mainly focused on placing HPGRs in the role of tertiary crusher in the preparation
Jan 1, 2010
-
Design and Materials Selection of Autoclaves and Auxiliary EquipmentBy P. Cheung, J. Gulyas, R. Clary
Over the past 50 years, the use of autoclaves in the metallurgical industry has evolved from final metal recovery (hydrogen reduction) and purification (sulphide precipitate oxidation) to treating who
Jan 1, 2004
-
Optimization of the Grinding Circuit of the Tata Steel Ijmuiden Pelletizing PlantBy Willemijn Husslage
Tata Steel Group At a glance ? Part of the Tata Group ?Tata Steel Group: ?Fortune 500 company ?Top 10 global steel producer ?Annual crude steel capacity of 28 million tonnes ?More than 80,000
May 1, 2011
-
Parameters for Cyclone SelectionBy Norman A. Jull
"Factors which affect the separation achieved in a hydrocyclone are discussed and illustrated with graphs of some mathematical relationships.Definitions of separation and sharpness include comment on
Jan 1, 1972
-
Modifications to Improve LHD-Type VehiclesBy J. P. Morgan, D. B. Stewart
"AbstractLoad-haul-dump machines equipped with. a torque converter and hydraulic pumps have been field tested by means of an engine monitoring instrumentation package. It was found that owing to paras
Jan 1, 1977
-
Raising a Blind Shaft Between Two Submarine Coal Seams (297edc53-3f33-4275-8620-82ccd0512a9f)By Jos. Kalbhenn
MR. G. G. BOWSER: Mr. Kalbhenn's paper is an excellent one and is a concise description of a very interesting piece of work. It is well known that a great deal of preliminary study was given to
Jan 1, 1944
-
Namew Lake Mill ProjectBy K. Hoover, G. Labarre, S. Rantanen
"As part of the Namew Lake project a mill was constructed to treat 1900 tpd of ore grading approximately 0.90% CU and 2.45% Ni to produce copper and nickel concentrates.Nickel occurs mainly as pentlan
Jan 1, 1990
-
The Schaft Creek Porphyry Cu-Mo-Au DepositBy James Scott
Outline Deposit Overview and Brief History ?Geologic Setting ?Local Geology ?Petrography ?Geochemistry ?Mineralization ?Geochronology ?Conclusions Deposit Overview ?Porphyry Cu-Mo-Au ?Disco
May 1, 2006
-
How One Sell-Side Analyst Values Mining StocksBy Greg Barnes
Agenda ? The Mining Stock Life Cycle ? Current Environment ? Valuation ? Golds ? Valuation ? Base Metals ? Case Study ? Quebrada Blanca Hypogene Commodity Investment Cycle ? Macro-Economic Indi
May 1, 2010
-
Design and Operation of the Key Lake Uranium MillBy M. Neven, R. A. Steane, E. Lam
"The Key Lake uranium mill is located in Northern Saskatchewan. It treats a high grade, complex uranium and metal sulphide ore. The plant and process are in many respects unique, because commercial tr
Jan 1, 1986
-
Changes in grade, volume and contained gold during the mining life-cycle of gold placer depositsBy J. D. Bliss, G. J. Orris, W. O. Menzie
"Analysis of gold placer data from gold placers throughout the world suggests that gold grades and volumes cannot be used to distinguish between most types of gold placers. Only the alluvial plain and
Jan 1, 1987