Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    pH Control of Mattagami Lake and Orchan Mines Effluents

    By K. G. Stowe

    "1. Introduction Mattagami Lake Mines and Orchan Mines operate zinc copper mines adjacent to one another near Matagami, Quebec, situated approximately 300 kilometres north-east of Rouyn-Noranda. (Note

    Jan 1, 1979

  • CIM
    PGM Ore Processing at Impala’s UG-2 Concentrator in Rustenburg, South Africa.

    By Eugene Nel, Johan Theron, Chris Martin, Hans Raabe

    "Impala Platinum Limited is the world’s second largest platinum producer, producing more than 1.7 million ounces of the precious metal last year, much of this from the UG-2 reef located in the Bushvel

    Jan 1, 2004

  • CIM
    Estimation Errors for Gold Inventory in Large Carbon-In-Leach Tanks

    By Jr. Blanchette, Claude Bazin, Paul Blatter

    "Reporting of the gold production during a month implies to estimate the mass of gold that is processed by a mill, recovered as dorés, lost to the tailings and the change of gold inventory within the

    Jan 1, 2011

  • CIM
    Technological Advances in Telecommunications for Mines

    By Patrick M. Y. Waye

    As mines utilise more automation in mining operations to improve efficiency and safety, a corresponding increasing demand is placed on the transport of information. Some of the recent technological ad

    May 1, 2001

  • CIM
    Latest Fire Protection Innovations for Large-Scale Mining Equipment

    By Don A. Toth

    Until recently, the fire protection systems used to protect mining equipment were based on generically designed, off the- shelf concepts. These systems were reliant on single agent approaches and were

    Apr 1, 2005

  • CIM
    Lead Circuit Flotation at the Red Dog Mine

    By M. J. Fairweather, Keith Lee, Naseem Mian

    "The initial metallurgical response of the lead flotation circuit at Cominco Alaska's Red Dog Mine was substantially below feasibility expectations. A program of diagnostic mineralogical analysis poin

    Jan 1, 1997

  • CIM
    Case Studies with the Falcon Concentrator

    By G. Naud, J. Robitaille, M. Buonvino, A. Veltmeyer, A. R. Laplante

    "A B6 Falcon concentrator was tested on several systems: a synthetic magnetite-silica ore, a massive sulphide gold-copper ore, a fine gold-pyrite-silica flotation tail, and a high grade gold ore in a

    Jan 1, 1993

  • CIM
    Hydraulic Calculation of Gravity Transportation pipeline System of Cemented Coal Gangue Backfilling in Suncun Coal Mine, China

    By Q. Zhang

    The necessary capability of the gravity transportation pipeline system for cemented coal gangue backfilling at the Suncun Coal Mine, China, is about 74.4 m3?h-1 according to mining production and work

    May 1, 2007

  • CIM
    Geometallurgical Modeling - The New Approach to Plant Design and Production Forecasting/Planning, and Mine/Mill Optimization

    By Dave Bulled, Chris Bennett, Glenn Kosick, Glenn Dobby

    "Mining companies around the world are embracing geometallurgical modeling at a rapid rate, as senior executives realize that inputs must be properly measured if the output is to be managed effectivel

    Jan 1, 2004

  • CIM
    The Coarse Particle Recovery Process (4291cbe3-857c-4d99-bb64-06edaaa4dc85)

    By Gregg S. Hill, Bert J. Huls

    "This paper on coarse particle recovery (CPR) summarizes a process to capture coarse particles that are not recoverable by regular flotation. Several porphyry copper operations in the world operate an

    Jan 1, 2005

  • CIM
    Data Acquisition from an Industrial Zinc Flotation Circuit

    By A. Wright, P. Lacombe, R. del Villar, D. Hodouin, C. Sepulveda

    "The data acquisition from industrial plants is a fundamental step for process modelling in process optimization, process analysis and automatic control.The introduction, some years ago, of modern dis

    Jan 1, 1991

  • CIM
    Processing of Refractory Sulphides at Mantos de Oro, Chile

    By John G. Peacey, Leoncio Sevilla G., Ford. Kevan J. R., Erling Villalobos C.

    "Kinross Gold Corporation’s Mantos de Oro (MDO) gold/silver mine in northern Chile currently processes 15,000 tpd of oxide ores through a mill, whole ore cyanide leach plant followed by a Merrill-Crow

    Jan 1, 2009

  • CIM
    Detection of Kaiser Effect in Marbles Under Tensile Stresses

    By Xie Qiang

    It is known that the stress state inside rock discs under Brazilian tests is neither simple compression nor tension, but a complex combination of both stress types, as well as for a beam subjected to

    May 1, 2009

  • CIM
    Improved Production Forecasting through Geometallurgical Modeling at Iron Ore Company of Canada

    By Dave Bulled, Jim Thompson, Tim Leriche, Mark Blake, Troy Wilkie

    "A commitment to a core testing, plant modeling and reconciling technique has shown substantial economic benefits to IOC in terms of accurate production forecasting, smoother operation of the mill, im

    Jan 1, 2009

  • CIM
    Study of Relationship between Pyrochlore Matrix Composition and Surface Chemistry Effects on Collector Adsorption

    By B. Hart, J. Marois

    "Scanning electron microscopy coupled with energy dispersive X-ray spectroscopy (SEM–EDX), and Time of flight secondary ion mass spectroscopy (TOF-SIMS)were used to analyze pyrochlore grains from Niob

    Jan 1, 2013

  • CIM
    Commercial Aspects of Gold Applications : From Materials Science to Chemical Science

    By Christopher W. Corti

    A major aim of the GOLD 2003 conference, is to promote new gold related science and technology with a view to developing new useful industrial applications for gold. Current industrial uses have provi

    Oct 1, 2003

  • CIM
    Process Engineering in Froth Flotation

    By A. Vien, A. J. Neale, B. C. Flintoff, R. P. Edwards

    Froth flotation is one of the most widely used and effective processes for mineral beneficiation. First introduced in 1911, flotation technology has seen many developments over the past 80+ years. Inn

    Jan 1, 1994

  • CIM
    A review of dry cover placement on extremely weak, compressible tailings

    By A. T. Jakubick, A. MacG. Robertson

    This paper reviews key issues related to the placement of dry (soil) covers on extremely weak, compressible fine tailings. The design and construction of soil covers on such tailings often presents a

    Jan 1, 2000

  • CIM
    Optimization and Increasing Throughput at Jacobina

    By Alexandra Kozak, Rodrigo Costa, Bob Fukuhara

    "The Jacobina project in Bahia, Brazil commenced operations in 2004 with a design capacity of 4,200 tpd. A project development plan to increase plant capacity to 6,500 tpd will be discussed. The proje

    Jan 1, 2008

  • CIM
    Experiences in the Installation and Commissioning of Semi-Autogenous Grinding Circuits

    By M. J. Allan

    "The paper describes the author's experiences in the startup of autogenous and semiautogenous grinding circuits gained over the last twenty years on both large and small grinding circuits. Typical pha

    Jan 1, 1992