Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
A Cyclone Furnace for Slag FumingLaboratory scale equipment was developed to recover zinc as oxide fume from granulated lead blast furnace slag. The cyclone furnace process is characterised by high treatment rates combined with conti
Jan 1, 1964
-
The Use of Cost Indices to Update Historical Mine CostsThe application of cost updating with the aid of cost indices is reviewed with particular regard to the mining industry. Examples of applicable cost index series are included with values given for t
Jan 1, 1990
-
Dipmeter Interpretation of Intra-Latrobe Group Fluvial Sand Bodies, Basker/manta Block, Gippsland BasinBy Rayner B
Five wells have been drilled in the Basker/Manta Block of VIC/P19, Gippsland Basin, resulting in sub-economic Intra-Latrobe Group oil and gas discoveries at Basker-1 and Manta-1. A total of 21 indiv
Jan 1, 1992
-
Preconditioning E48 Cave Extension Adjacent to an Active CaveBy J Samosir, L Snyman
Northparkes was the first mine in Australia to use block cave mining method which relies on gravity and natural rock stresses to fragment and recover the ore. It was also the first hard rock mine to u
May 9, 2016
-
Flotation of Phosphate Gangue from Magnetite Fines - Non-Ionic Surfactant as Atrac Collector ModifierFlotation of Phosphate Gangue from Magnetite Fines - Non-Ionic Surfactant as Atrac Collector Modifier
Sep 13, 2010
-
Geological Features and Origin of Gold Deposits Occurring within the Jiamosi Precambrian Massif, Northeast ChinaBy G Liu
Seventy-nine gold deposits and prospects have been discovered in theJiamusi region of northeast China, and constitute one of the most important gold metallogenic belts in China. All these endogenic go
Jan 1, 1995
-
Managing Geotechnical Risk Through Non-Destructive Rock Reinforcement Testing Trialled at the George Fisher Mine, Mt IsaCorrosion affects the performance of rock support and reinforcement at various underground mines, including the George Fisher Mine, where recent studies showed that this risk to mining operations is g
Nov 25, 2010
-
Reducing Crest Loss at Barrick Cowal Gold MineBy R Battison, R Duggan, S Esen, K Henley, P Dare-Bryan
Increased catch bench crest loss has been observed in recent years at Barrick’s Cowal Gold Mine situated in central New South Wales, Australia. A project was initiated to diagnose the cause of the cre
Aug 24, 2015
-
The Development of a Procedure for the Inspection of Unlined Rock Service TunnelsBy D Lees, D Gilchrist
Sydney has hundreds of kilometres of sewer tunnels. Many of these are over 50 years old and some have been in service for more than 100 years. The tunnels are predominantly constructed in Hawkesbury S
Sep 17, 2014
-
An Analysis of the Performance of Multi-Stage Grinding and Cyclone Classification CircuitsBy Lynch A. J
A method has been developed for the prediction of the performance of multi-stage grinding-cyclone classification circuits of any degree of complexity on any ore for a wide range of operating condition
Jan 1, 1965
-
Geological Parameters Controlling the Improvement of Manufactured Sand Using Vertical Shaft Impact Crushers Instead of Cone CrushersGeological Parameters Controlling the Improvement of Manufactured Sand Using Vertical Shaft Impact Crushers Instead of Cone Crushers Natural sand is a limited resource. In Sweden the total use of nat
Sep 13, 2010
-
Application of Mine Records to Reduce Project Risk During the Evaluation of Historical GoldfieldsBy W B. Edgar, I M. Platten, C A. J Towsey, B W. Cuffley
The evaluation of historical goldfields has been common over the past 15 years, reflecting changing economic conditions, improvements in knowledge and technology and lack of greenfield sites. Many gol
Jan 1, 2009
-
The Action of Soda on Aluminosilicate RefractoriesThe corrosion of aluminosilicate refractories by soda from three different sources has been studied by microscopic methods. Sodium sulphate from oil ash, sodium chloride used in glazing structural cla
Jan 1, 1964
-
Mine Planning and Risk Management Associated with the Breakthrough of the Telfer Sublevel Cave into the Active Telfer Open PitThe Telfer main dome open pit is operated by Newcrest Mining Limited at a current production rate of 50 Mt/a from a pit dimension compromising 2 km strike length, 1 km width and 250 m depth. As part o
May 1, 2010
-
Cooling Pathways for Deep Australian Longwall Coal Mines of the FutureBy B Belle, M Biffi
Cooling of coal mines in the Bowen Basin, characterised by steep geothermal gradient, is presently achieved mostly through rental surface bulk air cooling in summer months. This paper argues that futu
Jul 1, 2013
-
Application of Multi-Slicing Highwall Mining System with Stowing at Surface Coal Mine in ThailandThe Electricity Generating Authority of Thailand (EGAT) Mae Moh coal mine is an open-cut coal mine in Thailand that produces about 16 Mt of lignite annually to generate 2400 MW of electricity. The sur
Dec 6, 2010
-
Genesis of the Mount Isa Base Metal DepositNeither the copper orebodies nor the zinc-lead-silver orebodies at Mount Isa were formed syntectonically as has been claimed for the last 20 and 10 years respectively. Both orebody types were cogeneti
Jan 1, 2000
-
The Halloysite Clays of Northland, New ZealandBy R B. Evans, M G. Townsend
In Northland, New Zealand, localised large deposits of halloysite clay have been produced by in-situ alteration of rhyolite volcanics of Pliocene or Pleistocene age, which were erupted through pre-Pli
Jan 1, 1990
-
Potential for Revegetating Base-Metal Tailings at the Tui Mine Site, Te Aroha, New ZealandBy P E. H Gregg, D Horne, R B. Stewart, N Bolan
The Tui mine site is situated on the NW flank of Mt. Te Aroha, at approximately 400 m altitude. During underground mining operations two lead-copper-zinc ore bodies were exploited and processed on sit
Jan 1, 1995
-
Mineralisation and Structural Setting of the Rise and Shine Shear Zone, Otago Schist: Comparisons to the Macraes DepositBy D Craw, L Cox, R J. Norris
The Rise and Shine Shear Zone is a mineralised low-angle deformation zone traceable for at least 7 km through biotite zone schist of the Dunstan Range, central Otago. The zone is commonly believed to
Jan 1, 2005