Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Removal of phosphorus and gangue minerals from iron ore by a combined approach of alkaline drying and reverse flotationBy A Batnasan, K Haga, A Shibayama, K Higuchi, H Takeuchi
High silica (SiO2), alumina (Al2O3), and phosphorus (P) contents in iron ore adversely affect the quality of iron products. The removal of those impurities from iron ore is an essential point in furth
Sep 18, 2023
-
Mathematical Approach for Better Mine Waste Rock Dumping ManagementBy Y Li, D J. Williams, E Topal
A mine waste rock dump does not have any intrinsic value, yet is an inevitable structure in surface mining operations. Since the purpose of mining is to maximise profit, possible expenditure reduction
Jul 10, 2012
-
Mining Reconciliation in Long Hole Open Stopes at George Fisher MineBy J J. Grobler
The George Fisher Underground Mine at Mount Isa applies the long hole open stoping methodology. During the reconciliation process of transverse stopes in the George Fisher North mine it was identified
Mar 21, 2011
-
Reducing the Energy Required in Grinding Clinker to Cement – Some Case StudiesBy H Benzer
Grinding clinker to finished cement consumes more energy than any other comminution process. World production of cement in 2009 was 2840 million tonnes and the energy required for comminution was 40-6
Aug 8, 2011
-
Influence of Distorted Blasthole Patterns on Fragmentation as well as Roughness of, and Blast Damage behind, Remaining Bench Face in Model-scale BlastingBy P Moser, R Ivanova, F Ouchterlony
This paper describes model-scale bench blasts on mortar blocks with distorted drill hole patterns, done in 2013–2014 at the Montanuniversitaet Leoben. The main aim of the project is to see if the frag
Aug 24, 2015
-
Modelling the Initial Pit Design - The First Step for Project ValuationBy R Wolff
One critical factor in open pit mining projects is the estimation of the recoverable reserves. The reason for this is that at the valuation stage there is a lack of information about future metal pric
Jan 1, 2006
-
The Kermadec Arc, New Zealand - A Ten-Year Odyssey of Discovery Along the World's Most Hydrothermally Active Intraoceanic ArcResearch cruises dedicated to seafloor hydrothermal activity along the Kermadec arc first began with the Sonne-135 expedition in 1998. This was followed by the worldÆs first systematic survey for vent
Jan 1, 2008
-
Common Sense and Good Communication in Mineral Resource and Ore Reserve EstimationBy J Vann
Mineral Resource and Ore Reserve estimation is a challenging and demanding field, requiring application of professional knowledge, skill and experience of the highest order. If the many potential pitf
Jan 1, 1999
-
Automatic Contouring of Geological DataThis paper presents a review of computer techniques for the automatic contouring of geological and geophysical data with output as interactive display on graph plotters or graphics terminals and p
Jan 1, 1977
-
Evaporation and Salt Transport Under Variable Climatic ConditionsBy T Baumgartl, B Richards
The association of specific plants and plant communities with soils developed over underlying superficial orebodies and mineralisation has been long recognised. It has given rise to the use of plant i
Jul 10, 2012
-
Geotechnical Models and Data Confidence in Mining Geotechnical DesignBy M J. Dunn
The geotechnical model is the cornerstone of any mining geotechnical design and as such the confidence level and reliability of the geotechnical model is paramount. The geotechnical model confidence l
Nov 5, 2014
-
Measurement of Residual Shear Strength Using a Modified Direct Shear ApparatusBy L Tatnell, R Mackay, A Tolooiyan
The multi-reversal direct shear test (MRDS) method is commonly used to measure the residual shear strength of soils. However, when the standard direct shear (DS) apparatus is used, the MRDS method is
Nov 5, 2014
-
Variographic case study for designing, monitoring and optimising industrial measurement systems – the missing link in Lean and Six SigmaBy O Bøckman, E Thisted, K H. Esbensen, U Thisted
Process industry measurement systems, once installed, are often interpreted as static black boxes delivering correct values as long as not proven otherwise. After first implementation and set-up with
May 9, 2017
-
The Approval of a Gold Mine in the Solomon Islands ù Environmental Planning IssuesThe Gold Ridge Mine is an open-cut gold mine in the Solomon Islands. The mine is owned and operated by Gold Ridge Mining Limited, a wholly owned subsidiary of Ross Mining NL. At the invitation of the
Jan 1, 1999
-
Megablasts – Enabling Technologies in BHP Billiton Iron OreBy B Green
With a focus on safe productive tonnes, there has been an ongoing drive to increase the productivity of the mining fleet across BHP Billiton. In response, a team from the Iron Ore business was formed
Aug 24, 2015
-
Computer Simulations to Enable Continuous Blending to Two Plants at Sishen Mine From the Medium-Term Point of ViewSishen uses a state-of-the-art tracking system to track material from its position in blast blocks through various stockpiles and crushers. Qualities are blended directly to the crusher as opposed to
Jan 1, 2005
-
The Floatability Characterisation Test Rig as a Pilot Plant for Flotation Testing ù An OperatorÆs ViewpointBy J-P Franzidis, M Esvelt, E V. Manla
The Floatability Characterisation Test Rig (FCTR) is a self-contained, highly instrumented, mobile pilot plant that is able to treat up to 2 tph solids. It consists of a bank of six 130 L WEMCO« Smart
Jan 1, 2003
-
Risk-Based Ore Selection from Conditionally Simulated Block ModelsBy J E. Everett, F Grobler
This study considers realistic data for a planned open pit iron ore mine, but is applicable to any open pit situation. By interpolating drill hole data, grades are generated for a rectangular block mo
Aug 12, 2013
-
Open Cut Mining Adjacent to Ephemeral Creek and Spring Systems ù Pilbara, Western AustraliaThe Pilbara region, located in the north-west of Western Australia, is significant as the second-largest source of iron ore on the planet. Iron ore mines owned and operated by Pilbara Iron are located
Jan 1, 2006
-
Learnings from review of drawpoint management across New South Wales minesBy X Hill
Throughout the 2016/2017 financial year, the NSW Resources Regulator conducted an assessment of each underground metalliferous operation across the state to assess how each operation managed the princ
Oct 16, 2017