Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Aren't You Too Young to be a Consultant?

    Many young mining engineers do not consider consulting as a possible job, believing that many years of working on-site is required to achieve practical experience, develop expertise and acquire indust

    Jan 1, 2009

  • AUSIMM
    Advancements, innovations and initiatives for optimising the treatment of haul roads

    By H Haghighi

    Haul roads are often permanent unsealed access roads used by heavy haul trucks to transfer minerals. These roads can deteriorate rapidly which results in potholes, deformations and dust. Downer EDI Wo

    Sep 18, 2023

  • AUSIMM
    Development and Implementation of the CaveCAD Ground Support Module for Cost and Safety Improvements in Block Cave Mines

    By S Talu, E Savage, P Sturm, A van As

    It is estimated that substandard ground support installations and elements cost the Rio Tinto Copper Group millions of dollars between 2000 and 2014. These issues have also created significant safety

    May 9, 2016

  • AUSIMM
    Energy Efficiency Opportunities in Milling – Improving Comminution Circuit Efficiency

    By F Musa

    One of the main energy efficiency opportunities identified from the majority of mine site energy audits is to optimize the comminution circuit to reduce energy consumption through improved throughput

    Aug 8, 2011

  • AUSIMM
    Secondary Copper Processing using Outotec Ausmelt TSL Technology

    By J Wood

    Steady depletion of the world’s primary copper reserves coupled with a meteoric rise in electronic waste (e-waste) generation has led to secondary copper processing assuming an ever-increasing importa

    Aug 8, 2011

  • AUSIMM
    Evolution of the modern surge-bin in mineral processing plants with highly variable feeds

    By J Lyons, S Baker, D MacHunter, D Pepper

    Mineral processing plants require a storage buffer to bridge differences in production rates between mining and processing. Where coarse ores are processed, such as coal or hard rock, this buffer may

    Aug 24, 2022

  • AUSIMM
    Back analysis of pit slope performance in a saturated alluvial sediment

    By J Player, G Sweby

    The material properties and hence performance of saturated alluvial sediments slope can be incorrectly forecast if the water content is not preserved, and materials properties not correctly determined

    Jun 22, 2022

  • AUSIMM
    Preventing unwanted events critical controls – success and failure in implementing the ICMM guidance

    By A P. Wilkinson

    This paper reports on the implementation of the critical control concept to manage material risks in the mining and metals industries. The critical control management (CCM) approach assumes it is bett

    Apr 16, 2024

  • AUSIMM
    Managing Coal Loss Using Blast Models and Field Measurement

    By P Brown, M Nagarajan, A Green, P Dare-Bryan

    Coal loss is an important issue at many coalmines, with losses of five per cent being common. The type of loss varies from mine to mine but is dependent on mine strata, the drilling and blasting proce

    Aug 24, 2015

  • AUSIMM
    Semi-automated Geological Interpretation Using Assay and Infrared Spectroscopic Sensing Parameters towards Improvements in Geological Modelling

    By F Flitti, M Haest, O Dominguez, D Mittrup, G Hird

    The automated geology interpretation (AGI) tool has been developed in BHP Billiton to automate stratigraphy logging of drill holes, using any available quantitative data sets. At present, AGI is set-u

    Jul 13, 2015

  • AUSIMM
    Water balance management 101

    By M Rafty, C Lane

    Managing water is a key aspect of mining, whether a site is in water surplus or water deficit. Water in tailings storage facilities (TSFs) needs to be managed carefully to maximise the density of the

    Jul 23, 2018

  • AUSIMM
    Development and Evaluation Processes of Cave Production Schedules for the Resolution Copper Project

    By R Godard, J Gantumur, F Prince, C Pascoe

    Resolution Copper Mining LLC (RCML) is one of the largest undeveloped high-grade porphyry copper-molybdenum deposits in the world, with an orebody at depths of approximately 2000 m beneath post-minera

    May 9, 2016

  • AUSIMM
    Material handling testing and control system requirements for dry stack tailings

    By R Stefansen, T Wisdom, A Nicholson, K Rahal

    The challenges of increasingly scarce water resources and the risk of dam failures has seen the mining industry turn to sustainable tailings management solutions such as dewatering and dry stacking. F

    Jul 23, 2018

  • AUSIMM
    Impact testing of raise bore protection mesh

    By M Doran

    The Olympic Dam mine utilises 1.1 m to 1.4 m diameter raise bores for generating the initial slot void for most production stopes. Slot raise bores generally span two development levels ranging from 3

    Mar 29, 2023

  • AUSIMM
    Improving tungsten recovery through the reuse of mine wastewater

    By Z Gao, D Liao, W Sun, S G. Pooley, J Wang, Z Shi, G Jing, S Ren, Q Chen

    Yuanjing processing plant is a scheelite and wolframite plant in southern China. Water shortages and recent environmental regulations mean that the plant must reuse the wastewater that comes from the

    Aug 24, 2022

  • AUSIMM
    A guide to ground disturbance permitting and managing ESG risk

    By H Arvidson, B Spence, S Helm

    Mining is the art of disturbing ground. All phases of a mine’s life cycle from exploration to building and operating a mine, through closure, has a physical impact on the earth. There is currently inc

    Sep 18, 2023

  • AUSIMM
    Visual Communication of Geological Confidence - A Move Toward a Less Subjective Approach

    By J Seery, N Savage, A Wilson, L Nicholas

    Geological modelling provides a means of spatially representing the three dimensional distribution of geological information to downstream stakeholders. The geologist completing the modelling work int

    Aug 12, 2013

  • AUSIMM
    Case Study of Non-Mining Prediction and Control of Acid Rock Drainage ù The Vancouver Island Highway Project

    By W M. Tekano, T S. Coulter, N M. Hutt

    The Vancouver Island Highway Project (VIHP) was a $CAD 1.2 billion expenditure by the Province of British Columbia to improve travel safety and relieve traffic congestion between Victoria and Campbell

    Jan 1, 2003

  • AUSIMM
    How to Prioritise Process Improvements

    By D J. Hill

    "Mining companies routinely invest in improvements to their processing operations, but often these enhancements do not work to full effect.Improvements can be ineffectual because underlying process pr

    Sep 1, 2014

  • AUSIMM
    Enhancing Risk Management in Strategic Mine Planning through Uncertainty Analysis

    By C Fricke, R Wood, P Velletri

    "In a climate characterised by an ever increasing focus on cost reduction and maximising the utilisation of existing assets and infrastructure, understanding the uncertainty associated with alternativ

    Nov 24, 2014