Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Aren't You Too Young to be a Consultant?Many young mining engineers do not consider consulting as a possible job, believing that many years of working on-site is required to achieve practical experience, develop expertise and acquire indust
Jan 1, 2009
-
Advancements, innovations and initiatives for optimising the treatment of haul roadsBy H Haghighi
Haul roads are often permanent unsealed access roads used by heavy haul trucks to transfer minerals. These roads can deteriorate rapidly which results in potholes, deformations and dust. Downer EDI Wo
Sep 18, 2023
-
Development and Implementation of the CaveCAD Ground Support Module for Cost and Safety Improvements in Block Cave MinesBy S Talu, E Savage, P Sturm, A van As
It is estimated that substandard ground support installations and elements cost the Rio Tinto Copper Group millions of dollars between 2000 and 2014. These issues have also created significant safety
May 9, 2016
-
Energy Efficiency Opportunities in Milling – Improving Comminution Circuit EfficiencyBy F Musa
One of the main energy efficiency opportunities identified from the majority of mine site energy audits is to optimize the comminution circuit to reduce energy consumption through improved throughput
Aug 8, 2011
-
Secondary Copper Processing using Outotec Ausmelt TSL TechnologyBy J Wood
Steady depletion of the world’s primary copper reserves coupled with a meteoric rise in electronic waste (e-waste) generation has led to secondary copper processing assuming an ever-increasing importa
Aug 8, 2011
-
Evolution of the modern surge-bin in mineral processing plants with highly variable feedsBy J Lyons, S Baker, D MacHunter, D Pepper
Mineral processing plants require a storage buffer to bridge differences in production rates between mining and processing. Where coarse ores are processed, such as coal or hard rock, this buffer may
Aug 24, 2022
-
Back analysis of pit slope performance in a saturated alluvial sedimentBy J Player, G Sweby
The material properties and hence performance of saturated alluvial sediments slope can be incorrectly forecast if the water content is not preserved, and materials properties not correctly determined
Jun 22, 2022
-
Preventing unwanted events critical controls – success and failure in implementing the ICMM guidanceBy A P. Wilkinson
This paper reports on the implementation of the critical control concept to manage material risks in the mining and metals industries. The critical control management (CCM) approach assumes it is bett
Apr 16, 2024
-
Managing Coal Loss Using Blast Models and Field MeasurementBy P Brown, M Nagarajan, A Green, P Dare-Bryan
Coal loss is an important issue at many coalmines, with losses of five per cent being common. The type of loss varies from mine to mine but is dependent on mine strata, the drilling and blasting proce
Aug 24, 2015
-
Semi-automated Geological Interpretation Using Assay and Infrared Spectroscopic Sensing Parameters towards Improvements in Geological ModellingBy F Flitti, M Haest, O Dominguez, D Mittrup, G Hird
The automated geology interpretation (AGI) tool has been developed in BHP Billiton to automate stratigraphy logging of drill holes, using any available quantitative data sets. At present, AGI is set-u
Jul 13, 2015
-
Water balance management 101By M Rafty, C Lane
Managing water is a key aspect of mining, whether a site is in water surplus or water deficit. Water in tailings storage facilities (TSFs) needs to be managed carefully to maximise the density of the
Jul 23, 2018
-
Development and Evaluation Processes of Cave Production Schedules for the Resolution Copper ProjectBy R Godard, J Gantumur, F Prince, C Pascoe
Resolution Copper Mining LLC (RCML) is one of the largest undeveloped high-grade porphyry copper-molybdenum deposits in the world, with an orebody at depths of approximately 2000 m beneath post-minera
May 9, 2016
-
Material handling testing and control system requirements for dry stack tailingsBy R Stefansen, T Wisdom, A Nicholson, K Rahal
The challenges of increasingly scarce water resources and the risk of dam failures has seen the mining industry turn to sustainable tailings management solutions such as dewatering and dry stacking. F
Jul 23, 2018
-
Impact testing of raise bore protection meshBy M Doran
The Olympic Dam mine utilises 1.1 m to 1.4 m diameter raise bores for generating the initial slot void for most production stopes. Slot raise bores generally span two development levels ranging from 3
Mar 29, 2023
-
Improving tungsten recovery through the reuse of mine wastewaterBy Z Gao, D Liao, W Sun, S G. Pooley, J Wang, Z Shi, G Jing, S Ren, Q Chen
Yuanjing processing plant is a scheelite and wolframite plant in southern China. Water shortages and recent environmental regulations mean that the plant must reuse the wastewater that comes from the
Aug 24, 2022
-
A guide to ground disturbance permitting and managing ESG riskBy H Arvidson, B Spence, S Helm
Mining is the art of disturbing ground. All phases of a mine’s life cycle from exploration to building and operating a mine, through closure, has a physical impact on the earth. There is currently inc
Sep 18, 2023
-
Visual Communication of Geological Confidence - A Move Toward a Less Subjective ApproachBy J Seery, N Savage, A Wilson, L Nicholas
Geological modelling provides a means of spatially representing the three dimensional distribution of geological information to downstream stakeholders. The geologist completing the modelling work int
Aug 12, 2013
-
Case Study of Non-Mining Prediction and Control of Acid Rock Drainage ù The Vancouver Island Highway ProjectBy W M. Tekano, T S. Coulter, N M. Hutt
The Vancouver Island Highway Project (VIHP) was a $CAD 1.2 billion expenditure by the Province of British Columbia to improve travel safety and relieve traffic congestion between Victoria and Campbell
Jan 1, 2003
-
How to Prioritise Process ImprovementsBy D J. Hill
"Mining companies routinely invest in improvements to their processing operations, but often these enhancements do not work to full effect.Improvements can be ineffectual because underlying process pr
Sep 1, 2014
-
Enhancing Risk Management in Strategic Mine Planning through Uncertainty AnalysisBy C Fricke, R Wood, P Velletri
"In a climate characterised by an ever increasing focus on cost reduction and maximising the utilisation of existing assets and infrastructure, understanding the uncertainty associated with alternativ
Nov 24, 2014