Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Thernodynamic Properties and Phase Diagram of the Copper-Lead BinaryAlloy System

    ABSTRACTFor the binary system copper-lead two relationsEquation 1andEquation 2have been derived for the activities of copper and lead at compositions and absolute temperatures within the liquid region

    Jan 1, 1971

  • AUSIMM
    Improvement of the grade control procedure in open pit mine, at the Oyu Tolgoi copper-gold deposits, Southern Mongolia

    By O Otgonbayar, B Bayarmaa, D Batbyamba, S Amar-Amgalan, K H. Natsagdorj, J Nomin-Erdene, B Boldkhuu, T S. Sainzaya

    The Argyle deposit in the Kimberley region of Western Australia was the world’s largest accumulation of natural diamonds. Following its discovery in 1979, the mining of associated alluvial diamonds co

    Mar 22, 2022

  • AUSIMM
    Particle Size Distribution Effects that Should be Considered when Performing Flotation Geometallurgical Testing

    By K C. Runge, E Tabosa, A Jankovic

    Flotation recovery in geometallurgical modelling is usually predicted based on relationships developed from batch flotation testing of different ore types. These batch flotation tests are usually perf

    Sep 29, 2013

  • AUSIMM
    Syama Gold Mine – the Journey towards a Class-leading Gold Mine

    By R Sinclair, D Landwehr, I Hunter

    "The Syama Gold Mine, located in southern Mali, was established in 1990 by Broken Hill Propriety Limited (BHP). The operation began treating oxide, and in 1994 it transitioned to processing hard and r

    Oct 10, 2016

  • AUSIMM
    Genetic design of personalised slag for manufacturing die steel via electroslag remelting method and an industrial application case

    By J W. Dong, Y M. Li, J L. Tian, Z H. Jiang

    Electroslag remelting is widely used to produce various special steels, mainly because of its ability to provide high cleanliness and excellent homogeneity of ingot. Undoubtedly an optimal slag plays

    Jun 19, 2024

  • AUSIMM
    Lessons learnt from six mine disaster case studies to improve audit and assurance and ESG

    By A Atkins

    Six recent case studies were selected based on the eight main causes of mine disasters (Table 1; Quinlan, 2014) and where credible information sources, such as Royal Commission Reports, Coronial Inves

    May 5, 2022

  • AUSIMM
    Case study – Ernest Henry Mine: designing step out zones in an inclined sub-level cave

    By P Nichols, C te Kloot, A Harrison

    Ernest Henry mine (EHM) is a sub-level caving operation located in north-west Queensland, Australia. Located below a previously mined open pit, the underground operation ramped up production to 6.8Mt/

    Nov 21, 2018

  • AUSIMM
    The Relationship Between Mining and Socio-Economic Well-Being in AustraliaÆs Regions

    By R R. J McAllister, K Moffat, S Heyenga

    This paper examines the statistical relationship between quality of life indicators and the gross value of mineral production from Australian regions. We used quality of life indicators, aggregated fo

    Jan 1, 2009

  • AUSIMM
    Blasting related indices as the key to underground blasting improvements in a challenging rock mass

    By J Jackson, E Sellers

    Blasting related indices were developed to quantify variation in rock strength and structure for each stope, and for each lift of each stope, as part of a Mine to Mill study at an underground open sto

    Oct 16, 2017

  • AUSIMM
    A simple and accurate method for Ore Reserve estimation and Mineral Resource depletion in caving mines

    By A D. Campbell

    Conversion of Mineral Resources to Ore Reserves requires a multidisciplinary approach and application of a number of Modifying Factors. The Modifying Factors for mining, particularly dilution and reco

    Oct 16, 2017

  • AUSIMM
    Benchmarking and cross validation of the multivariate conditional simulation model of the Olympic Dam deposit

    By D Clarke, I Minniakhmetov

    The Olympic Dam deposit is truly a world-class IOCG-Ag deposit, the world’s fourth largest deposit of copper and the world’s largest known single uranium deposit. Traditional and non-traditional metho

    May 24, 2023

  • AUSIMM
    Shifting the comminution workload from the primary ball mill to TowerMill circuit

    By H Ishikawa, R Halomoan, S Palaniandy

    The Karara iron ore project is a magnetite operation consist of open pit mining and concentrator to produce high-grade magnetite concentrate. The concentrator has adopted three stages of comminution,

    Aug 29, 2018

  • AUSIMM
    Determination of Bulk Density in Anglo American plc, Methods and Impacts, with a Case Study from Los Bronces Mine

    By R M. Arellano, D M. W Harney, M Makhuvha

    Mineral resource and ore reserve estimates are founded on two sources of data: tonnage and grade. The tonnage is a product of volume and density; both of which are estimates. Density impacts numerous

    Aug 18, 2014

  • AUSIMM
    Predicting Mill Ore Feed Variability Using Integrated Geotechnical/Geometallurgical Models

    By M Astorga, J Jackson, J Gaunt

    The Ban Houayxai mine (BHX) is a relatively low-grade, low-cost, open pit gold-silver deposit in Laos operated by Phu Bia Mining, a subsidiary of PanAust. The ore production rate at BHX is 4.5 Mt/a, w

    Nov 24, 2014

  • AUSIMM
    Your Career ù Are You an Overnight Dot.Com or a Long-Term Growth Option?

    The current boom being experienced by mining, coupled with a shortage of professionals, will mean those in the industry will have many choices. It may be easy to become carried away and run with the h

    Jan 1, 2004

  • AUSIMM
    University research on molten slags, matte, speiss and metal systems for high temperature processing – challenges, opportunities and solutions

    By E Jak, P Hayes, J Chen, M Shevchenko, E Nekhoroshev, D Shishin

    Recent decades have seen significant advancements in analytical and experimental techniques, thermodynamic theory, and computational capabilities in high temperature research which are particularly ti

    Jun 19, 2024

  • AUSIMM
    Progress towards Data-driven Mine Planning via a Virtual Geometallurgical Laboratory

    By E Vargas, A Egana, M Alarcon, X Emery, A Barberan, A Lopez, N Morales, C Friedrich

    "As the cost in time and money of data from sensors and small-scale tests has reduced, additional challenges have arisen. Although many mine data sets are not big relative to those in other discipline

    Jun 15, 2016

  • AUSIMM
    Experience with Boiler Furnace Walls at Mount Isa Mines Limited's Power Plant

    By Crawford M

    During the initial development of Mount Isa Mines power was supplied from a temporary power plant situated near the Man & Supply Shaft. The main power plant was placed in service early in 1931 and

    Jan 1, 1939

  • AUSIMM
    Scoping of Feasibility Studies

    How often does one hear that a recent feasibility study was not a success? Alternatively, when scope of the feasibility study was sent out to tender there was a large discrepancy in tendered prices. I

    Jan 1, 1998

  • AUSIMM
    Above/Belowground Feedback May Facilitate and Sustain Mono-Dominance on Rehabilitated North Stradbroke Island

    By V Glenn, P McKenna, H Vickers, P Audet, M J. Gillespie, A Gravina, D R. Mulligan

    A requisite corollary of mineral sand mining on North Stradbroake Island (Queensland (Qld), Australia) has been the progressive rehabilitation of post-mined lands for the revegetation of native subtro

    Jul 10, 2012