Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Effect of Flotation Feed Density on the Operation of a Flotation CellBy R Crosbie, K C. Runge, E Tabosa, J K. McMaster
Flotation feed density is an operating parameter which is currently not well understood. Most models of flotation only incorporate its effect on particle residence time, but it is likely to have addit
Oct 29, 2012
-
Multicomponent modelling and simulation of the Minas Rio iron ore grinding circuitBy T M. Campos, J Silva, L M. Tavares, J Lichter, L P. Alves, B K. N Rocha, H D. G Turrer
The depletion of the richest ore deposits and the increase in number of mining projects involving deposits with complex mineralogy, higher competence and lower grade has led to an eminent need for imp
Aug 24, 2022
-
High Quality Performance of Segmental Lined TunnelsTunnels are being built around the world using TBMs and prefabricated segments or in situ concrete as linings. Clients demand high quality of these linings to guarantee a long-term stability and densi
Jan 1, 1999
-
Real-time Mining – Moving Towards Continuous Process Management in Mineral Resource ExtractionBy N Jeannee, L Rattmann, M W. N Buxton, A deJong, K Nienhaus, A Soares, P Graham, A Korre, J Benndorf, D Buttgereit
The flow of information, and consequently the decision-making along the chain of mining from exploration to beneficiation, typically occurs in a discontinuous fashion over long timespans. In addition,
Nov 4, 2015
-
Economic recovery of low-grade fine iron ore using the Optima ClassifierBy F van de Venter, J Monama, T Kale
For a multitude of years fine iron ore, -1 mm, across the world has been deposited as discard material in tailings facilities. This contributes to environmental problems, decreases plant yield and inc
Sep 18, 2023
-
Adding value with reverse circulation drilling at Pueblo ViejoBy L Ventura, M Almond
The Pueblo Viejo project in the Dominican Republic installed an innovative sample system on its reverse circulation (RC) drilling rig during commissioning and subsequent commencement of operations. As
Sep 20, 2017
-
Tunnel Construction by TBM Sand Bar Hydroelectric ProjectThis paper discusses the recently com- pleted TBM-driven pressure tunnel at the Sand Bar Hydroelectric Power Project. The Sand Bar Project is a diversion scheme situated on the middle fork of the S
Jan 1, 1987
-
A Case Study In Ore Reserve Procedures At Mount LyellBy Rowe J
The case study is based on the largest ore deposit at Mt. Lyell; the Prince Lyell deposit, comprising a regular lensoid mass of dissemina- ted and vein pyrite-chalcopyrite mineralisation. Reserve est
Jan 1, 1979
-
Resue or Split Face Firing - Trial Results from Hillgrove MineResue or split face firing has the potential to separate ore and waste rock into separate muck piles within a stope. Thus split face firing has the potential to reduce dilution of the ore stream to be
Aug 1, 2010
-
Tactical medical mining rescue – closing the gap of professional medical attention in environments with difficult accessibilityBy C Staak, H Mischo, A Fichtner, F Reuter
In mining and remote areas of resource industry, there has been a development towards lacking emergency medical first aid response, that creates a potential disadvantage for patients after work accide
Sep 1, 2024
-
A Geometallurgical Approach at Anglo American PlatinumÆs Mogalakwena OperationBy T Muzondo, C Prins, D De Vaux, R Schouwstra
The Mogalakwena Platinum Mine in the northern limb of the Bushveld Complex is Anglo American PlatinumÆs only open cast operation exploiting the Platreef. The Platreef, which extends along the basal co
Sep 29, 2013
-
The importance of rate of rise in life-of-mine planning of an upstream raised tailings storage facility – a case studyBy D A. Williams, P J. Chapman
The acceptable rate of rise of the tailings beaches on upstream-raised tailings storage facilities (TSFs) is critical to life of mine planning. This is illustrated through a case study in Western Aus
Jul 23, 2018
-
The Technology of Management ù An Overview of Technological Advances in the Mining IndustryThe major technological advances of the last 30 years have profoundly reshaped mining practices. Machines keep getting bigger while productivity continues to increase and manning levels drop. These tr
Jan 1, 2001
-
Study on change in mould slag characteristics during casting Ti containing steel gradesBy M Ranjan, C R. Borra, P Palai, P P. Sahoo
Change in mould slag composition during casting of medium alloy steel is caused by the redox reaction between molten steel and mould flux. Mould flux generally contains a certain amount of SiO2, but e
Aug 21, 2024
-
Measurement of Blast-induced Pressure in Bench Blasting and Deciphering Explosive Performance through Rock Mass Response Analysis – A MethodologyBy A K. Raina, V M. S R Murthy
Rock mass response in blasting is an important element to determine the performance of a blast along with its other outcomes. The near-field monitoring for rock mass response analysis is vital for det
Aug 24, 2015
-
Underground Geological Mapping at North Broken Hill LtdA proved routine mapping practice is described involving detailed observations on grade and structure. The equipment and methods employed are giving good service under the conditions encountered. Stop
Jan 1, 1940
-
Mining Research for Optimum Recovery of Coal ResourcesThe application of new and currently practised mining techniques in new areas and at greater depths necessitates considerable and immediate research effort. This effort is aimed at identifying the
Jan 1, 1981
-
Maintenance Requirements and Procedures for Underground Mobile Equipment, C.S.A. Mine, CobarThe maintenance system for underground mobile equipment at Cobar Mines Pty. Ltd. has been modified from that originally planned as a result of experience gained in operating the equipment.Downtime due
Jan 1, 1969
-
Development of the West Cliff Extended ProjectIn the Illawarra District of New South Wales, Mines were traditionally developed from the seabord. The advantages were close access to the working faces and a minimal depth of cover. Travelling ti
Jan 1, 1983
-
The Design, Installation and Commissioning of the Northparkes MinesÆ Lift 2 Ground Handling SystemBy I Ross
The ground handling system needed for the second lift of the underground block caving operation at Northparkes Mines had to link into the existing infrastructure. Production requirements indicated tha
Jan 1, 2005