Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Comparing Energy Efficiency in Grinding Mills

    By E Niva

    The IsaMillÖ is challenging the way that plants are designed and operated. This paper challenges existing designs of concentrator flow sheets, particularly focusing on magnetite circuits.   From

    Jan 1, 2008

  • AUSIMM
    Use of Geostatistically-constrained Potential Field Inversion and Downhole Drilling to Predict Distribution of Sulfide and Uranium Mineralisation

    By M Zengerer

    The Basil Cu/Co deposit comprises a 26.5 Mt Inferred Resource of copper and cobalt, grading 0.57?per cent Cu and 0.05 per cent Co. It lies in the Harts Range, Central Australia, within the Riddock Amp

    Aug 18, 2014

  • AUSIMM
    Study of the Effect of Blast Pattern Design on Autogenous and Semi-autogenous Mill Throughput at Gol-e-Gohar Iron Ore Mine

    By M R. Dehghan, H Mansouri, A Hakami, M A. Ebrahimi Farsangi, F Faramarzi

    Today, it is accepted that rock fragmentation by blasting affects loading and hauling operations, and also directly influences on downstream processes such as crushing and grinding. In this research,

    Aug 24, 2015

  • AUSIMM
    Underground Geological Mapping at North Broken Hill Ltd

    A proved routine mapping practice is described involving detailed observations on grade and structure. The equipment and methods employed are giving good service under the conditions encountered. Stop

    Jan 1, 1940

  • AUSIMM
    Mining Research for Optimum Recovery of Coal Resources

    The application of new and currently practised mining techniques in new areas and at greater depths necessitates considerable and immediate research effort. This effort is aimed at identifying the

    Jan 1, 1981

  • AUSIMM
    Maintenance Requirements and Procedures for Underground Mobile Equipment, C.S.A. Mine, Cobar

    The maintenance system for underground mobile equipment at Cobar Mines Pty. Ltd. has been modified from that originally planned as a result of experience gained in operating the equipment.Downtime due

    Jan 1, 1969

  • AUSIMM
    Development of the West Cliff Extended Project

    In the Illawarra District of New South Wales, Mines were traditionally developed from the seabord. The advantages were close access to the working faces and a minimal depth of cover. Travelling ti

    Jan 1, 1983

  • AUSIMM
    The Design, Installation and Commissioning of the Northparkes MinesÆ Lift 2 Ground Handling System

    By I Ross

    The ground handling system needed for the second lift of the underground block caving operation at Northparkes Mines had to link into the existing infrastructure. Production requirements indicated tha

    Jan 1, 2005

  • AUSIMM
    Automated, online measurement of bulk material size distribution on conveyor using 3D profile imaging at Boliden Mines

    By M J. Thurley, L Lindqvist, D Degerfeldt, J Nyström, R Nordenskjöld

    Rock breakage is a major component of all mining and mineral processing operations with the particle size distribution linked to productivity through the comminution chain. Optimisation and automatic

    Aug 29, 2018

  • AUSIMM
    Multicomponent modelling and simulation of the Minas Rio iron ore grinding circuit

    By T M. Campos, J Silva, L M. Tavares, J Lichter, L P. Alves, B K. N Rocha, H D. G Turrer

    The depletion of the richest ore deposits and the increase in number of mining projects involving deposits with complex mineralogy, higher competence and lower grade has led to an eminent need for imp

    Aug 24, 2022

  • AUSIMM
    Effect of Flotation Feed Density on the Operation of a Flotation Cell

    By R Crosbie, K C. Runge, E Tabosa, J K. McMaster

    Flotation feed density is an operating parameter which is currently not well understood. Most models of flotation only incorporate its effect on particle residence time, but it is likely to have addit

    Oct 29, 2012

  • AUSIMM
    Real-time Mining – Moving Towards Continuous Process Management in Mineral Resource Extraction

    By N Jeannee, L Rattmann, M W. N Buxton, A deJong, K Nienhaus, A Soares, P Graham, A Korre, J Benndorf, D Buttgereit

    The flow of information, and consequently the decision-making along the chain of mining from exploration to beneficiation, typically occurs in a discontinuous fashion over long timespans. In addition,

    Nov 4, 2015

  • AUSIMM
    Economic recovery of low-grade fine iron ore using the Optima Classifier

    By F van de Venter, J Monama, T Kale

    For a multitude of years fine iron ore, -1 mm, across the world has been deposited as discard material in tailings facilities. This contributes to environmental problems, decreases plant yield and inc

    Sep 18, 2023

  • AUSIMM
    Adding value with reverse circulation drilling at Pueblo Viejo

    By L Ventura, M Almond

    The Pueblo Viejo project in the Dominican Republic installed an innovative sample system on its reverse circulation (RC) drilling rig during commissioning and subsequent commencement of operations. As

    Sep 20, 2017

  • AUSIMM
    The Technology of Management ù An Overview of Technological Advances in the Mining Industry

    The major technological advances of the last 30 years have profoundly reshaped mining practices. Machines keep getting bigger while productivity continues to increase and manning levels drop. These tr

    Jan 1, 2001

  • AUSIMM
    Resue or Split Face Firing - Trial Results from Hillgrove Mine

    Resue or split face firing has the potential to separate ore and waste rock into separate muck piles within a stope. Thus split face firing has the potential to reduce dilution of the ore stream to be

    Aug 1, 2010

  • AUSIMM
    A Geometallurgical Approach at Anglo American PlatinumÆs Mogalakwena Operation

    By T Muzondo, C Prins, D De Vaux, R Schouwstra

    The Mogalakwena Platinum Mine in the northern limb of the Bushveld Complex is Anglo American PlatinumÆs only open cast operation exploiting the Platreef. The Platreef, which extends along the basal co

    Sep 29, 2013

  • AUSIMM
    The importance of rate of rise in life-of-mine planning of an upstream raised tailings storage facility – a case study

    By D A. Williams, P J. Chapman

    The acceptable rate of rise of the tailings beaches on upstream-raised tailings storage facilities (TSFs) is critical to life of mine planning. This is illustrated through a case study in Western Aus

    Jul 23, 2018

  • AUSIMM
    Managing Environmental Impact Assessments of Heavy Mineral Projects in Africa ù Potential Pitfalls and Proactive Planning

    Determining the environmental consequences of green field projects is becoming an increasingly important component of new projects. Feasibility studies are regarded by potential investors as incomplet

    Jan 1, 2001

  • AUSIMM
    Reducing Risks at Syncrude Canada Ltd's Mining Operations Through the Application of Technology

    By Fair A, Oxenford J

    Syncrude Canada Ltd operates one of the largest open pit mines in the world at Fort McMurray in northern Alberta, Canada. In 1993, Syncrude mined and processed 131.2 Mt of oil sands to produce 67.0

    Jan 1, 1994