Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    In-pit In Situ Recovery – a New Approach That May Allow for Increased Value Extraction before Pit Closure

    By D J. Robinson, L L. Kuhar

    "Regardless of orebody value, at some stage, the pit will reach a depth where the reward for mining wider and/or deeper is not justified by the anticipated returns. ‘Last-blast’ strategies may help to

    Nov 15, 2016

  • AUSIMM
    TiRON – A New Process for the Production of High-Grade Feedstock for TiO2 Pigment Manufacture

    By J M. Shekiro

    In the chloride process to manufacture TiO2 pigment, feedstocks containing higher TiO2 contents (high-grade ores or HGOs) are favoured in order to minimise production of undesirable by-products. Most

    Oct 5, 2011

  • AUSIMM
    Predicting changes in static liquefaction susceptibility using cone penetration test results

    By J T. Sharp, M A. Styler, D McGowan, P W. Mayne

    Static liquefaction is a geotechnical hazard in mine tailings facilities. Soils that are contractive in shear are susceptible to static liquefaction. Tailings facilities are dynamic structures, typi

    Jul 23, 2018

  • AUSIMM
    An Overview of Geotechnical Issues in Narrow Vein Mining

    By M P. Sandy, J B. Albrecht

    "Narrow vein mining can be loosely defined as mining operations involving orebodies with a true thickness of less than 4 m. Some authors have limited the term to steeper-dipping orebodies where the or

    Mar 26, 2012

  • AUSIMM
    Operational Challenges and Lessons Learnt at Xinli Nonferrous Co Ltd’s Ilmenite Smelter

    By H Weitz

    Bateman Engineering provided process technology and engineering design to China Yunnan Metallurgical Company (CYMCO) for a 30 MW DC furnace for the production of high-grade titanium dioxide slag.Follo

    Oct 5, 2011

  • AUSIMM
    No. 3 Shaft Winders and Winder House

    The sinking of the new No. 3 Shaft being mainly concerned with providing for the continuation of mining operations north of the existing workings, requirements for the shaft and haulage equipment were

    Jan 1, 1957

  • AUSIMM
    Characterisation of Coal Micro-Structure Using Scanning Electron Microscopy

    By Beamish B. B

    In this study, a systematic examination of the scale and variety of micro-structures in coal using Scanning Electron Microscopy (SEM) has been carried out, using coal samples of differing stages of

    Jan 1, 1991

  • AUSIMM
    Tube Making in Australia

    The title of this paper suggests rather a comprehensive survey of the industry, but since it is not possible to do justice to this in a short paper, and, as the bulk of the Australian trade consists o

    Jan 1, 1935

  • AUSIMM
    Quantifying segregation of minerals and metals in particulate materials using computed X-ray tomography and variography

    By G Gilchrist, S C. Dominy, T Jashashvili, R C. A Minnitt

    The grouping and segregation error is one of Gy’s seven errors that cannot be measured in any qualitative manner because of its transient and changing characteristics each time the sample is handled m

    May 9, 2017

  • AUSIMM
    Fluid Pressure, Geomechanical Evolution and Predictive Targeting of the Sunrise Dam Gold Deposit, Western Australia

    By M J. Nugus, J G. McLellan, T G. Blenkinsop

    High fluid pressures and deformation have been instrumental in the formation of high-grade gold lodes at the Archaean granite greenstone 12 Moz Sunrise Dam gold deposit in Western Australia. Historica

    Sep 26, 2013

  • AUSIMM
    A Comparison Between a Flotation Mini Pilot Plant and a Copper Concentrator Mill

    By K L. C Gontalves

    In 1999, the Mineral Development Centre of CVRD (CDM) acquired a flotation device referred to as Mini Pilot Plant (MPP), which is able to run continuous flotation tests with drill core samples. Since

    Jan 1, 2005

  • AUSIMM
    Kisoro-Kabale iron ore project in south-western Uganda – unlocking a new high-grade iron ore region for exploration and development

    By B Vietnieks, N Widmer, L White, E Tata, J Natukunda, D C. Ilouga, J P. Tyler

    The Republic of Uganda aims to exploit its’ significant, un-developed iron ore resources to supply the required raw material for developing its’ iron and steel industry across all the stages of the su

    Sep 18, 2023

  • AUSIMM
    Old Stopes and New Simulations – A Structural Modelling and Resource Estimation Case Study of the Edna May Gold Mine, Western Australia

    By P Hodkiewicz

    Recent structural interpretations based on historic stope shapes were used to develop a rapid and innovative method to domain and simulate structurally complex, high-grade gold veins at depth in the E

    Aug 22, 2011

  • AUSIMM
    Local Scale Estimation of Sublevel Cave Stocks - Is it Possible? A Case Study in Reconciliation of Metal Production, Ridgeway Mine, New South Wales

    By T O&apos, Sullivan

    Reconciliation of metal production from a sublevel cave (SLC) mining operation is a complicated process. SLC reconciliation is unlike reconciliation for open stope operations, where a tonnage of extra

    Jan 1, 2006

  • AUSIMM
    Optimisation of Length of Retreat Longwall Faces

    By Misra A

    After review of the status of research on optirnisation of retreat longwall faces it is argued that an acceptable optimisation model must be based upon realistic cost data that take into account not o

    Jan 1, 1995

  • AUSIMM
    The Geology and Ore-Deposits of the Walhalla-Wood's Point Auriferous Belt

    The following thesis is an outcome of an investigation undertaken by the writer, at the suggestion of Professor Skeats, of the dykes and associated auriferous reefs of the Walhalla-Wood's Point b

    Jan 1, 1920

  • AUSIMM
    Optimisation of Drill and Blast for Mill Throughput Improvement at Ban Houayxai Mine

    By D Symonds, S S. Kanchibotla, L Kennelly, G McNamara, J Gaunt, B Adiyansyah

    Ban Houayxai is a gold-silver mine operated by Phu Bia Mining Limited in Laos since 2012. The first two years of operation processed predominately soft oxidised ore but subsequent years were expected

    Aug 24, 2015

  • AUSIMM
    Adaptation of an Open Pit Optimiser for Underground Strategic Planning

    By M Bloss, B Roberts

    BHP Billiton Olympic Dam required a well-tested software product suitable for strategic optimisation and scheduling of options for a potential underground mining project. The company has a standard so

    Nov 24, 2014

  • AUSIMM
    Should earthquake loading be considered for open pit slope design in Australia?

    By F Weir, B Estrada

    The impact of seismic loading on open pit slope stability in Australia is often only considered where the slopes are located adjacent to tailings facilities or other major infrastructure. The debate r

    Jun 22, 2022

  • AUSIMM
    Realisation of Value through Identification of Various Oxidation Fronts and Mineralisation Styles at Trilogy Cu-Au-Ag-Pb-Zn Deposit

    By B Armstrong

    The Proterozoic poly-metallic Trilogy deposit was discovered in 1997, and until recently, mining evaluation was stalled due to poor metallurgical performance. Unlocking the substantial economic value

    Sep 5, 2011