Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Tunnelling within the Bunya Phyllite of Legacy Way, Brisbane, Queensland

    By M Norbert, C Bennett

    The Legacy Way Tunnel was constructed from Toowong to Kelvin Grove in Brisbane, and is the first large-scale underground excavation in the Bunya Phyllite in Brisbane. The Legacy Way Tunnel is 4.3 km i

    Sep 17, 2014

  • AUSIMM
    Extractive Companies, Development and Environmental Agendas

    By B Harvey

    Achieving community and stakeholder endorsement during life-of-mine planning and implementation requires a business-connected approach, as opposed to charitable giving, disconnected offsets and enviro

    Jul 16, 2014

  • AUSIMM
    Spatial distribution of major, minor and trace elements in iron ores, using micro-XRF technology

    By N J. Potter, N W. Brand, J M. F Clout

    The increasing demand for iron ore with low concentrations of trace elements, puts increasing pressure on iron ore producers for high-quality material. Understanding the mineralogy, petrography, chemi

    Nov 8, 2021

  • AUSIMM
    Developing the Ridgeway Deeps Project with an Operations Attitude

    By C Jones

    Ridgeway Deeps is a block cave (BC) located down dip of the operating Ridgeway sublevel cave (SLC) mine. The BC is located approximately 210 m vertically below the lowest SLC level and approximately 1

    Mar 21, 2011

  • AUSIMM
    Increasing Mine Profitability ù Technical Partnership to Reduce Coal Loss

    By D Hope, D Mitchell, B Metcalfe

    In recent years there has been a major change among mining companies in their mining methods. This has been driven by the need to increase shareholder value and optimising the value from an operation.

    Jan 1, 2001

  • AUSIMM
    Applying Controlling Blasting to Minimise the Damage at the Water Dam Ramp 23 at Ensham Resources

    By I Villalba

    The need to continue the development of the Ensham mine has led to blast up to 75 m to the Eastern side of a water dam in the vicinity of Ramp 23. The water dam wall is exposed to blasting over a

    Nov 8, 2011

  • AUSIMM
    WaihiÆs 2020 Vision: Part A: The Community's Blue-print

    Gold was discovered at Waihi in 1878. In 1987 the modern Martha Mine opened in the middle of the town of Waihi. Newmont Waihi Gold as the current licence holder has been operating the mine since 2000.

    Jan 1, 2006

  • AUSIMM
    Ventilation and Cooling Design for Long Declines

    Declines for both access and rock haulage are replacing shafts for mining relatively shallow deposits of down to 1000 m below surface. Where the orebody does not outcrop and where surface access may b

    Jan 1, 2005

  • AUSIMM
    Dealing with uncertainties on mining equipment fleet planning and usage

    By I R. Souza

    At the mining industry, there are several uncertainties that may affect the mobile mining equipment fleet sizing and usage, such as commodity supply and demand, which impacts the mineral price, enviro

    Nov 8, 2021

  • AUSIMM
    Injection of Coal-Oil Mixture into Blast Furnace

    By Tamura S, Maekawa M, Nagai C, Deguchi M

    Heavy fuel oil has been injected into blast furnaces in order to reduce the coke rate, to improve productivity and to control the furnace heat condition. However, in the first oil crisis at the en

    Jan 1, 1981

  • AUSIMM
    Gravity Flow of Broken Rock - What is Known and Unknown

    The knowledge in the field has been reviewed by literature studies, and using experience from personal research in sublevel caving. There is a lot of material regarding gravity flow of fine grained ma

    Jan 1, 2000

  • AUSIMM
    Economically Mineable Resource in an Underground Metalliferous Mine

    By Bell I. F

    In 1985, ZC Mines (now Pasminco South) had been unprofitable for some years due to a combination of high operating costs, low metal prices, low head grade and an aging and inadequate mining infrastr

    Jan 1, 1992

  • AUSIMM
    Waste Not, Want Not – Rethinking the Tailings and Mine Waste Issue

    By S Joyce, Z Agioutantis, D van Zyl, D Shields

    Over the past 15 years, the mining industry has begun to incorporate the concepts of sustainable development and sustainable mining practice across the life cycle of mineral operations. This requires

    Jul 27, 2015

  • AUSIMM
    Strategies for Mine Planning and Design

    By S Coward, C Xu, P A. Dowd

    "This paper provides an assessment of the current challenges in strategic mine planning and design and suggested approaches for addressing them. The specific challenges covered are: realistic quantif

    Nov 24, 2014

  • AUSIMM
    Will introduction of EoRs improve governance of TSFs in Australia?

    By L Boczek

    The term Engineer of Record (EoR) is commonly used in North America and South Africa to define the responsible person for the design, construction and operational phases of a tailings storage facility

    Jul 1, 2021

  • AUSIMM
    Do You Understand Your Legal Obligations in the Industry?

    Most new engineers in the mining industry do not realise the importance of legal obligations. During investigations the first question you are asked is: Do you have any proof or evidence? The smallest

    Jan 1, 2007

  • AUSIMM
    Buckling of Sheave Wheels

    Sheaves are a critical safety component in a winding system and are expected to survive such extreme loading events as rope break. Sheave designs have often been developed and evolved empirically, con

    Jan 1, 2005

  • AUSIMM
    The Henty Mining Experience

    Goldfields (Tasmania) Limited operates a small, high-grade underground gold mine on the West Coast of Tasmania, 30 kilometres north of Queenstown. The main orebody, Zone 96, was discovered in 1989, wi

    Jan 1, 1998

  • AUSIMM
    Five Years With Paste Fill ù Experience at Henty Gold Mine

    By T J. Grandfield

    Paste fill has been used successfully at Henty Gold Mine for the past five years. It has allowed 100 per cent extraction of the orebody, stabilised poor ground and enabled wide sections and offsets to

    Jan 1, 2002

  • AUSIMM
    Assigning Value to a Drill and Blast Wall Control Program Through Reduction in the Risk Profile

    By S B. Sheldon

    Wall control programs tend to be expensive and consequently require financial justification in order to get approval for the expenditure required. The difficulty faced in getting this approval is that

    Nov 8, 2011