Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Critical process design considerations from test work to operations

    By A Dennis, T Hunter, R Coleman

    For metallurgical plant design, it is necessary to progress through successive phases of test work, piloting and process development before involving all the other engineering disciplines and “freezin

    Sep 11, 2017

  • AUSIMM
    PanAust Limited’s approach to mine waste and tailings stewardship

    By L P. Trout, D G. Reid

    PanAust Limited (PanAust) has successfully constructed and commissioned two mining operations in Lao PDR over the past decade and undertaken major studies for three new mine developments. The managem

    Jul 23, 2018

  • AUSIMM
    The Iron Magnet Deposit

    By G Bubner, C Gaughan

    Magnetite mineralisation within the South Middleback Range has been known since the early 1930s; however, it was not until 1989 that BHP (then owners of the Middleback Ranges mining leases) drilled 10

    Jan 1, 2005

  • AUSIMM
    Investigation on Multicomponent Semi-Autogenous Grinding

    Investigation on Multicomponent Semi-Autogenous Grinding

    Sep 13, 2010

  • AUSIMM
    Correlated Valuation Methodology

    By E C. Holloway

    "The financial valuation of mining assets has a number of fundamental differences to the valuation of many other asset groupings. One such difference is that typically, the greater proportion of both

    Mar 8, 2016

  • AUSIMM
    Hoist Ropes for Double-Drum Winders ù A New Concept

    By R Verreet

    In April 2000 Mount Isa Mines installed hoist ropes of a new design on the double-drum winder at their P49 shaft. The ropes, CASAR Duroplast, were about three times as expensive as the previously used

    Jan 1, 2005

  • AUSIMM
    Paragenesis of Hydrothermal Minerals in the Rise and Shine Shear Zone, Otago Schist

    By D Craw

    The Rise and Shine Shear Zone is a mineralised low angle deformation zone traceable for at least 7 km through biotite zone schist of the Dunstan Range, central Otago. Rocks from the shear zone obtaine

    Jan 1, 2006

  • AUSIMM
    The Evolution of Wall Control Programs at Kidston Gold Mines

    By A Marton

    Concerns with crest losses have seen changes to a number of design and operating parameters to retain the integrity of the wall and the berms of the Kidston Gold MinesÆ Eldridge Pit. Until trials bega

    Jan 1, 2001

  • AUSIMM
    Study on Pure Mineral Flotation Tests of Low-Grade Phosphate Ore in Zhijin, Guizhou Province, China

    Study on Pure Mineral Flotation Tests of Low-Grade Phosphate Ore in Zhijin, Guizhou Province, China

    Sep 13, 2010

  • AUSIMM
    Geology and Alteration Mineralogy of the Karangahake Adularia-Sericite Epithermal Deposit, Hauraki Goldfield, New Zealand

    By M Stevens, M P. Simpson, J L. Mauk

    The Karangahake deposit was the second largest producer of gold-silver bullion in the Hauraki Goldfield, New Zealand. New mapping of a 2 + 3 km (6 km2) area demonstrates that hydrothermal alteration s

    Jan 1, 2005

  • AUSIMM
    A Description of the Iron Ore Industry at Iron Knob and Whyalla

    The whole of the iron ore required by the Broken Hill Proprietary Company Limited at the Newcastle Steel Works, and Australian Iron and Steel Limited, at Hoskins' Kembla Works, is drawn from the

    Jan 1, 1937

  • AUSIMM
    Coking with a Seven Cubic Foot Capacity Coke Oven

    A new test coke oven of 7 cu. ft. capacity is described. The oven was designed to simulate conditions in a central section of a battery oven and a special feature is the achievement of unidirectional

    Jan 1, 1970

  • AUSIMM
    Modelling of Mineral Potentials of Gold and Base Metals Using Gis in Mahneshan Area, Iran

    By A Kamkar-Rouhani

    The paper describes a mineral potential mapping of gold and other base metals in Mahneshan area, Iran, using geographical information system (GIS), in which, the method of weights of evidence is used

    Jan 1, 2005

  • AUSIMM
    Field Measurement of Transient Pore Pressures within Co-disposed Processing Rejects Placed in a Spoil Dump

    By R Van Laeren, G Langerak, S Fityus, K Koosmen

    Co-disposal of partly-dewatered mixed-plant rejects (MPR) from coal processing into spoil dumps is gaining favour amongst Australian coalmine operators in preference to conventional tailings disposal

    Jul 27, 2015

  • AUSIMM
    The Diamond Search in Australia - Applications of a Mobile Prospection Unit and the Concept of Mineral-Geochemistry

    The Bureau de Recherches Geologiques et Minieres (BRGM) (a French Government-sponsored geological and mining agency), through international experience gained over many years, has become very skilled i

    Jan 1, 1971

  • AUSIMM
    The role of fleet management in reducing carbon emissions from haul trucks

    By D Prior

    The Australian mining industry is a significant contributor to the nation’s greenhouse gas (GHG) emissions, and like any industry, it must make efforts to reduce these. Medium- and long-term strategie

    Jun 22, 2022

  • AUSIMM
    Implementation of a Zoned Trigger Action Response Plan Associated with Changing Mine Conditions at Narrabri Mine

    By M Brady, O Salisbury, C Claassen, B Beamish, H Baxter

    Monitoring for signs of elevated spontaneous combustion in the active goaf behind the longwall face is crucial for early intervention of any potential heating incidents. Typically, trigger action resp

    Aug 31, 2015

  • AUSIMM
    Particle Size Analysis – Optimising Returns in Iron Ore

    By B Stump

    Reliable particle size analysis in minerals processing plants is a critical factor to the economic return of a plant. As recovery of valuable minerals is compromised for particles outside the optimal

    Jul 11, 2011

  • AUSIMM
    Screen Media Aperture Size Measurement Using MetsoÆs Screen Tracker

    By G van Niekerk, M Wortley

    Screening is a critical part of many mineral processing circuits and keeping the aperture of the screening media within specification is vital to ensure efficient performance of the processing plant.

    Sep 26, 2011

  • AUSIMM
    The Contribution of BHP BillitonÆs Ekati Diamond MineTM to Sustainable Development in CanadaÆs North

    By R Beaulieu, D Burlingame, C Hanks

    The Ekati Diamond MineÖ is CanadaÆs first diamond mine and is located 300 kilometres northeast of Yellowknife in the Northwest Territories. The development of the mine supports sustainable development

    Jan 1, 2002