Search Documents

  • NIOSH
    IC 8622 Recovery Of Secondary Copper And Zinc In The United States

    By Fred V. Carrillo

    Of the total quantity of secondary copper and zinc that became obsolete in the United States from 19b1 through 1970, more than 11 million tons of copper and 10 million tons of zinc were not recovered.

    Jan 1, 1974

  • DFI
    CSM: An Innovative Solution For Mixed-In-Situ Retaining Walls, Cut-Off Walls And Soil Improvement

    By Fabrice Mathieu

    The Cutter Soil Mixing (CSM) provides a cost effective solution for the rapid construction of retaining and cut-off walls using new equipment developed from diaphragm wall cutter technology. CSM consi

    Jan 1, 2006

  • NIOSH
    OFR-70-81 Evaluation Of The Environmental Factors Involved In Metallurgical Processes To Utilize Domestic Resources For Production Of Alumina - Environmental Aspects Of Preliminary Pilot-Plant Design

    By T. Bertke

    This document assesses the environmental aspects of a preliminary design for processing kaolin clay as the domestic resource for recovery of alumina by a hydrochloric acid leach-HCl gas induced crysta

    Jan 1, 1980

  • SAIMM
    Stirred Milling-New Comminution Technology In The PGM Industry - Synopsis

    By C. M. Rule

    Stirred milling using either horizontal or vertical mills has made a rapid entrance into PGM ore and tailings concentrator flow sheets. Currently there are in excess of 40 units installed in either ma

    Jan 1, 2011

  • NIOSH
    OFR-10-77 Analysis Of Noncoal Mine Atmospheres: Toxic Fumes From Explosives

    By Sheridan J. Rodgers

    Toxic fumes generated during shot firing were measured in a phosphate rock mine and a copper mine. Fumes generated during firing of explosives in the Bureau of Mines 1350 ft3 test chamber were measure

    Jan 1, 1976

  • SME
    The Origins Of Public Concern With Taconite And Human Health: Reserve Mining And The Asbestos Case

    By Michael E. Berndt

    Asbestos first became an issue to Minnesota?s iron industry when it was revealed that mineral fibers similar to those in Reserve Mining?s tailings were being found in drinking water for several commun

    Jan 1, 2007

  • AUSIMM
    Optimal goaf hole spacing in high production gassy Australian longwall mines – operational experiences

    By B Belle

    In a predrained gassy coalmine, ventilation control plays a secondary role to the longwall (LW) goaf drainage systems to safely manage panel return gas levels. Typically, the LW specific gas emission

    Aug 28, 2017

  • AUSIMM
    Cave Propagation and Open Pit Interaction at the Ernest Henry Mine

    By E Ah Mu and C R Lilley, A D. Campbell

    Cave propagation is a complex process due to interacting variables such as mine geometry, rock mass heterogeneity and complex structural networks and stress fields. The Ernest Henry sublevel cave (SLC

    May 9, 2016

  • SAIMM
    Development Of A New Operator Visibility Assessment Technique For Mobile Equipment

    By I. Bhattacherya

    Over the last three decades, the mining industry has been moving towards underground mechanized mining methods and the number of load haul dump (LHD) vehicles utilized has increased. The growth of mec

    Jan 1, 2006

  • AUSIMM
    The Phased Metallurgical Upgrade Strategy at Gold Fields Limited South African Operations

    By A B. Phillips

    This paper details the approach adopted to upgrade the current metallurgical facilities at both the Driefontein and Kloof Gold Mines in the Republic of South Africa. Goldfields Ltd operates eight meta

    Jan 1, 2003

  • AIME
    Melting and Casting Some Gold Alloys

    By Edward Capillon

    THE problem of scrap is probably of greater importance inn the production of gold, silver and other precious metal alloys than is the case for base metals and alloys. Remelting of gold and silver scra

    Jan 1, 1930

  • IIMP
    La estrategia de gestión de mantenimiento

    By Peter Grundy

    La eficiencia de los recursos en los procesos transparentes de gestión de las empresas permite aumentar el valor de los accionistas. En ese sentido, el presente texto señala el uso de la RCM como estr

    Jul 17, 2000

  • AUSIMM
    Geostatistical Modelling of Hydraulic Fracturing Pressures at El Teniente Mine

    By P Landeros, D Benado, J Cornejo, A Pinochet, C Caviedes

    In 2005, El Teniente mine began preconditioning the primary rock mass by hydraulic fracturing (HF). The major perceived benefits of this process are a decrease in the magnitude of the expected maximum

    May 9, 2016

  • AUSIMM
    How Particles Stick to Bubbles - The Influence of pH and Hydrophobicity in Flotation

    How Particles Stick to Bubbles - The Influence of pH and Hydrophobicity in Flotation

    Sep 13, 2010

  • SAIMM
    Phase Transformations And Surface Characterization Of The Platinum-Chromium Coated System - Synopsis

    By N. Hanief

    This research involves the investigation of phase transformations in the platinum-chromium coated system. Single-layer 0.1 µm platinum coatings were deposited via electron beam deposition on 99.98 per

    Jan 1, 2012

  • AIME
  • SME
    Design And Preliminary Testing Of Low-Energy Planetary Excavator - Preprint 09-134

    Development of a permanent human base on the Moon for exploration requires a self sustaining system. This entails production and processing of limited amounts of raw material on the Moon. Any mining a

    Jan 1, 2009

  • ABM
    PLUG & WORK IN 3D – NEW WAYS IN RAPID PROFESSIONAL COMMISSIONING

    By Detlef Ehlert

    With the proven “Plug & Work” concept developed by SMS Siemag, automation systems are tested and optimized in the test field in a near-reality environment before being shipped and commissioned at

    Aug 16, 2017

  • NIOSH
    OFR-204-83 Continuous Respirable Dust Monitoring System (CRDMS)

    By Pedro Lilienfeld

    The objective of this program was the development, design, fabrication, and laboratory testing of a mine-worthy continuous respirable dust monitoring system (CRDMS). The operation of the sensor unit o

    Jan 1, 1983

  • DFI
    Risk Mitigation Strategies For Cut And Cover Tunnels At The Mitchell Interchange

    By Mark Maday

    As part of the I-94 North-South Corridor reconstruction program, the Wisconsin Department of Transportation (department) is reconstructing the Mitchell Interchange in Milwaukee, Wisconsin. Located o

    Jan 1, 2011