Search Documents

  • AUSIMM
    Permitting, Construction and Commissioning of the Gosowong Gold Mine, Halmahera, Indonesia

    By D J. Corp

    The Halmahera Contract of Work is a sixth generation contract held 82.5 per cent by Newcrest Mining Limited and 17.5 per cent by PT Aneka Tambang and takes in the Gosowong Project area. In 1991 Newcre

    Jan 1, 1999

  • SAIMM
    Management of the Nkomati Mine Crusher Slope Failure

    By R. Armstrong

    Due to limited available level ground, Nkomati Nickel Mine cut a weathered rock slope at the base of a mountain spur in order to create a platform for construction of the primary crusher plant and run

    Jan 1, 2014

  • CIM
    "Linatex Dewatering Equipment in Selected North American Applications"

    By T. A. Kirk

    "The Linatex Dewatering System is a compact, low capital and maintenance cost matched set of processing equipment suitable for solids recovery, dewatering and desliming sand-like materials in the rang

    Jan 1, 1978

  • NIOSH
    RI 7710 Purification Of Yttrium By Electrorefining

    By D. C. Fleck

    Electrorefining yttrium from selected low-melting yttrium--base alloys is investigated, and various halide systems are studied as potential electrolytes for use in preparing low-oxygen yttrium by elec

    Jan 1, 1973

  • SAIMM
    A Real Options Application To Manage Risk Related To Intrinsic Variables Of A Mine Plan: A Case Study On Chuquicamata Underground Mine Project

    By J. Botin

    Traditional risk quantification methods provide little information on the sources of risk, and tend to produce static over-conservative evaluations, which do not account for changes in the performance

    Jul 1, 2013

  • SME
    History and Evolution of Rubber Liner Systems For Grinding Mills

    By Stuart F. McTavish

    Mechanically suitable grinding mills became available to the mining industry in 1908. Since then, mill operators have been searching for the best material and design with which to line the mills. T

    Jan 1, 1990

  • SME
    Shaft Sinking In The Hemlo Gold District

    By Peter White

    The Hemlo Gold District, located on the north shore of Lake Superior, was discovered in 1981 and will become one of the largest gold mining camps in Canada. Three major Canadian mining companies are p

    Jan 1, 1985

  • SAIMM
    SMR Geomechanics classification: Application, experience and validation

    By R. Romano, E. Montalar, J. B. Serón

    The SMR geomechanics classification system (adaptation of RMR for slopes) is reviewed with data from 87 actual slopes in Valencia. In a research project, SMR has been applied by a GIS system, as a met

    Jan 1, 2003

  • NIOSH
    OFR-34-88 Development And Testing Of A Variable Wall Miner Breadboard Prototype Unit

    By Ronald J. Mathis

    The objective of this contract is to design, build, surface test, and evaluate a breadboard prototype of the Variable Wall Mining System so that data are available for the design of a production machi

    Jan 1, 1987

  • AUSIMM
    Mining and Metallurgical Education in Victoria

    By Worner H. K

    Education has always been a topic to rouse the interest of mining and metallurgical engineers, but the recent activities of the Education Committee of the Australasian Institute of Mining and Metallur

    Jan 1, 1950

  • SME
    Establishing Geotechnical Baseline Values for Deep Soft Ground Tunnels

    By John E. Newby

    The Brightwater Conveyance System consists of four tunnel segments in three tunnel con-tracts, comprising over 21,760 m (71,400 ft) of pressurized face tunneling in complex glacial and non-glacial sof

    Jan 1, 2008

  • IOM3
    Long-team open-pit production scheduling through dynamic phase-bench sequencing

    By Qing Wang

    In this method the state of an open-pit mine is represented by the number of benches that are mined in each predesigned mining phase (or pushback). Consequently, a specific mining schedule can be repr

    Jul 1, 1996

  • AUSIMM
    Land Restoration on the Taramakau River

    By F K. Buckley

    Currently, Kanieri Gold Dredging Limited operates the only large scale gold dredging operation in New Zealand. It dredges a claim in the Taramakau River using the bucket dredge 'Kanieri'. Th

    Jan 1, 1981

  • NIOSH
    OFR-53-76 Properties Of Coal-Water Slurries

    By R. R. Faddick

    Properties of coal-water slurries were studied in two separate phases: a rheological phase and a pipeline phase. The purpose of the study was to investigate the rheology of fine coal slurries to deter

    Jan 1, 1974

  • AUSIMM
    Treatment of Wolfram, Bismuth, and Molybdenite Ores at Burma Queensland Corporation Mill, Wolfram, N.Q.

    THE old mill erected by the .Irvinebank Company consisted of 10 heads of stamps (850 lb.), rock-breaker, Hartz jig, two Krupp tables, two Luhrig vanners, three sand-pumps, one mixer; six flotation ves

    Jan 1, 1920

  • AUSIMM
    Results from Physical Models of Block Caving

    By D Cumming-Potvin, S W. Jacobsz and E Kearsley, J Wesseloo

    This paper describes a physical modelling program that recreated block cave propagation in a geotechnical centrifuge. A brief description of the design of the test along with the sample material and m

    May 9, 2016

  • IOM3
    Development of seismic risk assessment method for application to rockburst-prone sites in deep-level South African gold mines

    By R. D. Stewart

    Paper presented at the conference: Risk assessment in the extractive industries, held in Exeter, UK, 23-24 March 1994, and first published London: IMM, 1994, preprint volume, 18pp., 5 refs. A seismic

    Aug 1, 1995

  • AUSIMM
    Geoscience input into blasting operations – let’s set a new standard

    By T N. Little

    The author contends that geoscience is presently under-utilised in the rock fragmentation by blasting process. Before we can set standards in this area, the following is required: mine geologists need

    Sep 20, 2017

  • DFI
    Application Study On Non-Destructive Static Test Pile

    By Han Xuanjiang

    Through whole analysis of static testing piles information of a teaching building, this paper put for ward that when the ratioes of unload rebound amount to residual deformation and to total settlemen

    Jan 1, 1991

  • AUSIMM
    Flotation of Lithium and Beryllium Pegmatites (427a6d82-fb39-4583-b35b-3c6431d40947)

    By Moskovits E. E

    Spodumene was recovered from pegmatite by flotation in laboratory and pilot-plant tests using an anionic collector emulsion. A similar process applied to beryl pegmatite gave encouraging results.INTRO

    Jan 1, 1963