Search Documents

  • SME
    Improving Energy Efficiency in Copper Heap Leaching with the use of Binders

    By K. A. Lewandowski

    Leach heaps are plagued with problems due to fine material migrating downwards, clogging the spaces between the coarser ore particles, resulting in decreased metal recovery rates. The use of a binder

    Jan 1, 2008

  • NIOSH
    RI 8382 Superplasticity in Selected Magnesium-Base Alloys

    By M. M. Tilman

    Etchants containing hexavalent chromium and sulfuric acid are used in a variety of surface-finishing operations. When the resultant spent solutions are discarded, substantial quantities of chromium ar

    Jan 1, 1979

  • ISEE
    Vibration Control Blasting for Low Stability Final Wall

    By Greg Wyartt

    In the Pilbara region of Western Australia, an iron ore mine is undertaking a high wall cut-back to improve stability and allow access to deeper ore deposits. Several sections of the wall have been cl

    Jan 1, 2018

  • SME
    Mine Power Systems

    By Christopher J. Bise

    INTRODUCTION A mine's power system represents the driving force behind all of the extraction and auxiliary operations, because the production and transportation of mined material and the oper

    Jan 1, 1986

  • NIOSH
    IC 8481 Injury Experience In The Nonmetallic Mineral Industries (Except Stone And Coal), 1964-65

    By Forrest T. Moyer

    [The safety record of the nonmetal mining industry during 1965 way worse than that of 1961 in all general measures s of injury experience except for a slight improvement in the number and frequency ra

    Jan 1, 1970

  • CIM
    Design of the Kubaka Grinding Circuit Using SPI and Bond

    By Graham Holmes, John Starkey

    "The Kinross Kubaka Project is a gold mine located in the Russian Far East. The grinding circuit, comprised of a 6.1 m diameter x 2.74 m long SAG mill and a 4.1 m diameter x 5.5 m long secondary ball

    Jan 1, 2001

  • AUSIMM
    Improvements in Flotation Cell Maintenance, Power Consumption and Operation at South32 Cannington

    By M Bird, B Oats, M Sganzerla

    Mining operations are continually aiming to reduce operating costs to improve plant profitability. One way in which the Cannington operation sought to achieve this was by increasing the wear life and

    Sep 7, 2015

  • DFI
    Construction Of A Deep Basement On A Sloping Site In Glasgow: The Aurora Project

    By H. Boghosian

    This paper presents the design and construction of a deep basement in a steeply sloping site in glacial till in Glasgow city centre. Existing foundations, adjacent structures and services, in tandem w

    Jan 1, 2006

  • NIOSH
    RI 3610 Beneficiation Of Alunite ? Introduction (0bc4c843-f77c-4802-a3e8-7e9cfe26205c)

    By Alton Gabriel

    During the fall of 1940, J. R. Thoenen of the Mining Division, Bureau of Mines, accompanied by the senior author, surveyed the more important domestic alunite deposits. Although the study was designed

    Jan 1, 1942

  • AUSIMM
    A Relational Data Base and Data Management System for the Onshore Gippsland Basin

    By Gaulton R

    The Commission maintains a data base first computerised in 1957 and containing information from over 18 000 boreholes located mainly in the Latrobe Valley area. Some of the borehole derived informat

    Jan 1, 1992

  • SME
    Hydrochloric Acid Leaching Of Iron From Pennsylvania Aluminous Clays

    By S. C. Sun

    Pennsylvania has ample reserves of high-alumina clays which are potential sources of alumina, but many of these clays contain large amounts of iron, which makes them unsuitable for treatment by acid p

    Jan 1, 1968

  • SAIMM
    Integration of imprecise and biased data into mineral resource estimates

    By E. Machaka, A. Cornah

    "Mineral resources are typically informed by multiple data sources of varying reliability throughout a mining project life cycle. Abundant data which are imprecise or biased or both (‘secondary data’)

    Jan 1, 2015

  • SME
    Design and Construction of a Multiple-Drift Subway Underpinning Structure for Boston’s Central Artery/Tunnel Project

    By Robin B. Dill, Mark Pelletier, Daniel J. Dobbels, Subodh Bhaumik, Daniel J. VanRoosendaal

    Although primarily cut-and-cover excavations are required for replacement of the existing elevated I-93 interstate highway through the heart of Boston for the Central Artery/Tunnel (CA/T) project, som

    Jan 1, 2001

  • NIOSH
    RI 3610 Beneficiation Of Alunite ? Introduction

    By Alton Gabriel

    During the fall of 1940, J. R. Thoenen of the Mining Division, Bureau of Mines, accompanied by the senior author, surveyed the more important domestic alunite deposits. Although the study was designed

    Jan 1, 1942

  • CIM
    Geology of the Ore Fault Ni-Cu Deposit, Bird River Sill Complex, Manitoba

    By P. Walford, C. Mealin, D. Good

    "The geology of the Ore Fault Ni-Cu deposit has been reinterpreted in the light of recent studies of the geology of the Neoarchean Bird River Sill Complex and the occurrence of economic Ni-Cu and Zn-C

    Jan 1, 2009

  • SAIMM
    Surface Tension Of Cu-O Alloys At 1400 K

    By C. Nexhip, S. Sun

    Critical to understanding and controlling phase mixing and separation in metallurgical processes, is the development of reliable experimental techniques to measure interfacial properties of melt syste

    Jan 1, 2004

  • CIM
    The New Red Lake Mine: Narrow Vein Mining in Deep, Burst-Prone Ground

    By Pierre Rocque

    The Red Lake Mine is located approximately 600 km northwest of Thunder Bay. This 545 tpd (600 tons/day) underground narrow vein gold operation is set to produce in excess of 14.8 tonnes (475,000 ounce

    Oct 1, 2001

  • AUSIMM
    A revised stratigraphy of Muyua (Woodlark Island)

    By Finlayson EJ

    New detailed mapping, micropalaeont- ology and isotopic dating have been successful in revising the stratigraphy of Woodlark Island. All Middle to Late Miocene intrusives and volcanic rocks have be

    Jan 1, 1991

  • CIM
    Effect of Operating Variables in Knelson Concentrators: A Pilot-Scale Study

    By Sunil Koppalkar, A. R. Laplante

    "A Pilot Plant was installed in one of the grinding circuits of the Dome Mill, Ontario, Canada. Tests were conducted on a KCCD12 Knelson Concentrator to systematically analyze the effect of operating

    Jan 1, 2007

  • IOM3
    Options for climate control during construction of large underground storage chambers

    During the construction of storage caverns, and during their lifetime if the use to which they are put so requires, it is necessary to provide adequate ventilation to ensure the safety and comfort of

    Aug 1, 1994